Transport Sector

The transport sector is a foundation of Ukraine’s economy, supported by an extensive railway network, a developed system of highways, seaports and river terminals, airports, and freight customs terminals.
This pipeline will present public investment projects and programs in the transport infrastructure sector that correspond to the areas of air, road, rail, maritime, and inland water transport, road infrastructure, postal services, as well as public transport and road border crossing points. These initiatives support the implementation of the National Transport Strategy of Ukraine. The Ministry for Communities and Territories Development of Ukraine is engaged in the preparation and development of projects and programs in these areas, forming a sectoral project pipeline at the national level and subsequently enriching it with public investment projects at the regional and local levels.
Indicative total public investment ceiling is 198'152'166'700 UAH, including State Guarantees in the amount of 142'900'000'000 UAH
Responsible Ministry
MINISTRY OF DEVELOPMENT OF COMMUNITIES AND TERRITORIES OF UKRAINE
Indicative total public investment ceiling
198.2 bln
Project code
Keyword
Initiator
Project coverage area
Number of alternative technical approaches
Initiation date
Budget
Status
State level of SP
Date02. 2026
SectorTransport Sector
SubsectorRailway transport
StatusInvestment Feasibility Study

Reconstruction of railway transport infrastructure facilities with electrification of the 1435 mm railway track on the Uzhhorod - Pavlovo - State Border section in the Transcarpathian region.

Project goal
Improving the quality of services. Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions
Geography
Zakarpatska region
Initiator
JOINT STOCK COMPANY "UKRAINIAN RAILWAY"
Reconstruction of railway transport infrastructure facilities with electrification of the 1435 mm railway track on the Uzhhorod - Pavlovo - State Border section in the Transcarpathian region.
Reconstruction of railway transport infrastructure facilities
The project involves the reconstruction of railway infrastructure, namely: railway tracks and switches, roadbed, reconstruction of centralization and blocking signaling devices, communications, contact network, as well as the reconstruction of existing artificial structures on the site.
Budget500'100'002 UAH
Implementation period36 months
State level of SP
Date02. 2026
SectorTransport Sector
SubsectorRailway transport
StatusInvestment Feasibility Study

Reconstruction of railway transport infrastructure facilities on the Korolevo - Khust section in the Transcarpathian region.

Project goal
Improving the quality of services. Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions
Geography
Zakarpatska region
Initiator
JOINT STOCK COMPANY "UKRAINIAN RAILWAY"
Reconstruction of railway transport infrastructure facilities on the Korolevo - Khust section in the Transcarpathian region.
Reconstruction of railway transport infrastructure facilities
The project involves the reconstruction of railway infrastructure, namely: railway tracks and switches, roadbed, reconstruction of centralization and blocking signaling devices, communications, as well as the reconstruction of existing artificial structures on the site.
Budget820'800'002 UAH
Implementation period36 months
State level of SP
Date02. 2026
SectorTransport Sector
SubsectorRailway transport
StatusInvestment Feasibility Study

Reconstruction of railway transport infrastructure facilities on the Uzhhorod - Perechyn section in the Transcarpathian region.

Project goal
Improving the quality of services. Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions
Geography
Zakarpatska region
Initiator
JOINT STOCK COMPANY "UKRAINIAN RAILWAY"
Reconstruction of railway transport infrastructure facilities on the Uzhhorod - Perechyn section in the Transcarpathian region.
Reconstruction of the existing 1520 mm wide track with the construction of a 1435 mm wide track nearby
The project involves the reconstruction of railway infrastructure, namely: railway tracks and switches, roadbed, reconstruction of centralization and blocking signaling devices, communications, contact network, as well as the reconstruction of existing artificial structures on the site.
Budget903'500'002 UAH
Implementation period36 months
State level of SP
Date01. 2026
SectorTransport Sector
SubsectorRoad transport and road infrastructure
StatusInvestment Feasibility Study

Reconstruction of the public highway of state importance M-06 Kyiv - Chop (to Budapest via Lviv, Mukachevo, Uzhhorod) on the section km 129.6 - km 151.73

Project goal
Increasing compliance with modern standards. Improving the condition of infrastructure
Geography
Zhytomyrska region
Initiator
Infrastructure recovery and development service in Zhytomyr region
Reconstruction of the public highway of state importance M-06 Kyiv - Chop (to Budapest via Lviv, Mukachevo, Uzhhorod) on the section km 129.6 - km 151.73, Zhytomyr region
Construction of the Southern Bypass of Zhytomyr
The project involves the reconstruction of a 22.4 km section of the M-06 Kyiv - Chop highway (km 129.6 - km 151.73), which is due to the need to bring its parameters and safety features up to modern standards. The works are divided into 5 construction phases, within which it is planned to erect 7 artificial structures, 5 two-level traffic interchanges and install a capital road surface made of cement concrete with a thin-layer protective coating (LEMS). The completion of the reconstruction of the Zhytomyr bypass road will allow the transit freight flow to be completely removed from the city, which will significantly relieve the street network and improve the environmental situation in residential areas. Thanks to the modernization of the M-06 Kyiv - Chop highway, the level of traffic safety will dramatically increase, logistics in the strategic direction will be optimized and a powerful incentive will be created for the economic development of the entire region.
Budget6'375'388'443 UAH
Implementation period36 months
State level of SP
Date01. 2026
SectorTransport Sector
SubsectorRoad transport and road infrastructure
StatusInvestment Feasibility Study

Construction of an overpass over the railway at km 57+058 of the public highway of state importance H-03 Zhytomyr - Chernivtsi and reconstruction of the section km 52+250 - km 58+000 (approaches to the overpass)

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards
Geography
Zhytomyrska region
Initiator
Infrastructure recovery and development service in Zhytomyr region
Construction of an overpass over the railway on the public road of state importance H-03 Zhytomyr - Chernivtsi at km 57+058
Construction of a railway overpass
Provides the construction of an artificial transport structure to ensure continuous and safe movement of road transport across the railway line without level crossings. The implementation of the project is aimed at increasing the level of road safety, increasing the capacity of the national highway and eliminating delays associated with the movement of rail transport. The overpass is designed in accordance with current regulatory requirements and provides for the installation of a span structure, supports, road surface, drainage, barrier and railing fencing, as well as necessary engineering elements. The design documentation has been developed and approved in accordance with the established procedure, which allows the implementation of the facility to begin or continue within the provided funding and deadlines. The commissioning of the overpass will ensure improved transport connections, increased reliability of the road network and a positive socio-economic effect for the region.
Budget1'214'347'896 UAH
Implementation period29 months
State level of SP
Local level of SPP
Local level of SP
Date11. 2025
SectorTransport Sector
SubsectorPublic Transport
StatusInvestment Feasibility Study

Supply of new low-floor buses with a length of 8.2 to 10.5 m, including essential and consumable spare parts, equipment and tools for maintenance and repair and related services for a total amount of up to EUR 4,500,000.00, excluding VAT and, where applicable, customs duties

Project goal
Meeting demand. Improving the equality of wealth distribution, Improving the condition of infrastructure, Improving the quality of services
Geography
Mykolaiv city
Initiator
EXECUTIVE COMMITTEE OF MYKOLAIV CITY COUNCIL
Replacement of supplier for the purchase of low-floor buses
Use of alternative modes of transport
The possibility of replacing the supplier company in case of non-fulfillment of the terms of the tender or contract, in particular, violation of delivery deadlines, non-compliance with technical requirements or inadequate product quality.
Budget225'000'003 UAH
Implementation period120 months
State level of SP
Local level of SPP
Local level of SP
Date11. 2025
SectorTransport Sector
SubsectorPublic Transport
StatusInvestment Feasibility Study

Completion of construction of the metro in Dnipropetrovsk

Project goal
Improving the condition of infrastructure. Improving the quality of services
Geography
Dnipro city
Initiator
MUNICIPAL ENTERPRISE "DNIPROV METROPOLITAN" OF DNIPROV CITY COUNCIL
Completion of construction of the metro in Dnipropetrovsk
Development of the city's ground transport
Construction of the Dnipro Metro branch along Slobozhansky Avenue
The main goal of the project is to improve public transport services in the city of Dnipro. Economic aspects: Increasing the profitability of passenger transportation by up to 300%; Increasing the volume of passenger transportation by up to 106 million passengers/year. Social aspects: Improving the existing passenger transport system in the central part of the city. Developing convenient, environmentally friendly city transport and modernizing the infrastructure to modern social standards. Security aspects: Given the relevance of the availability of safe civil infrastructure, the completion of the Dnipro metro is a direct result of the development of the city's civil protection system as a shelter of the highest level of protection. Environmental aspects: The expansion of the metro system in the city of Dnipro is directly related to ensuring the possibility of reducing the use of traditional passenger and private transport in the central part of the city, which will allow expanding the existence of pedestrian and public areas, increasing environmental performance and achieving high social indicators of improvement. The project involves the construction of a second section of the metro consisting of three stations.
Budget15'880'346'181 UAH
Implementation period96 months
State level of SP
Local level of SPP
Local level of SP
Date09. 2025
SectorTransport Sector
SubsectorPublic Transport
StatusInvestment Feasibility Study

Renewal of the rolling stock of the Zaporizhzhia Municipal Enterprise of Urban Electric Transport "Zaporizhelectrotrans" in the city of Zaporizhzhia

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Creation of new facilities and services, Ensuring inclusiveness and equal opportunities, Improving the quality of services
Geography
Zaporizhzhia city
Initiator
ZAPORIZHEL ELEKTROTRANS MUNICIPAL ENTERPRISE OF MUNICIPAL ELECTRIC TRANSPORT
Rolling stock renewal through the purchase of new trolleybuses and electric buses with accompanying infrastructure
Preservation of the existing fleet of outdated trolleybuses and buses.
Updating the technical base by increasing the level of technical equipment of the enterprise's infrastructure based on new technologies and the efficiency of its work - updating the municipal transport fleet with modern electric buses and trolleybuses with an appropriate level of travel comfort, adapted to the movement of people with special needs.
Budget824'822'264 UAH
Implementation period270 months
State level of SP
Date08. 2025
SectorTransport Sector
SubsectorRoad Border Crossing Points
StatusPreliminary Investment Feasibility Study

Major overhaul of infrastructure facilities at the state border checkpoint for the road connection “Solotvyno - Sighetu Marmații”, including the preparation of design and estimate documentation

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Improving the quality of services
Geography
All Ukraine
Initiator
SERVICE FOR RENOVATION AND DEVELOPMENT OF INFRASTRUCTURE IN THE TRANSCARPATHIAN REGION
Major overhaul of infrastructure facilities at the state border checkpoint for the road connection “Solotvyno - Sighetu Marmații”, including the preparation of design and estimate documentation
Reconstruction of the Solotvino - Sighetu Marmației checkpoint, including the production of design and estimate documentation
Development of a PCD for major repairs and implementation of developed solutions for infrastructure modernization
Budget116'120'000 UAH
Implementation period16 months
State level of SP
Date08. 2025
SectorTransport Sector
SubsectorRoad Border Crossing Points
StatusInvestment Feasibility Study

Major repairs of infrastructure facilities at the checkpoint on the state border for the road connection “Maly Berezny - Ublya”, including the preparation of design and estimate documentation

Project goal
Improving the condition of infrastructure. Increasing compliance with modern standards, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Improving the quality of services
Geography
All Ukraine
Initiator
SERVICE FOR RENOVATION AND DEVELOPMENT OF INFRASTRUCTURE IN THE TRANSCARPATHIAN REGION
Major repairs of infrastructure facilities at the checkpoint on the state border for the road connection “Maly Berezny - Ublya”, including the preparation of design and estimate documentation
Reconstruction of the checkpoint at the state border for road traffic
Development of a PCD for major repairs and implementation of developed solutions for infrastructure modernization
Budget113'600'000 UAH
Implementation period16 months