Provides the construction of an artificial transport structure to ensure continuous and safe movement of road transport across the railway line without level crossings. The implementation of the project is aimed at increasing the level of road safety, increasing the capacity of the national highway and eliminating delays associated with the movement of rail transport. The overpass is designed in accordance with current regulatory requirements and provides for the installation of a span structure, supports, road surface, drainage, barrier and railing fencing, as well as necessary engineering elements. The design documentation has been developed and approved in accordance with the established procedure, which allows the implementation of the facility to begin or continue within the provided funding and deadlines. The commissioning of the overpass will ensure improved transport connections, increased reliability of the road network and a positive socio-economic effect for the region.
Budget1'214'347'896 UAH
Implementation period29 months