Construction of a cogeneration complex based on gas piston plants with a total capacity of up to 80 MW
Construction of a combined cycle plant + waste heat boiler in a configuration of 31 MW thermal / 50 MW electric
Construction of a biomass steam boiler + backpressure turbine – 20 MW thermal / 5.7 MW electric
The project envisages the construction of new generating facilities located on the territory of the Mykolaiv CHPP. At the moment, a feasibility study of modernization options for PrJSC "MYKOLAIV CHPP" is being carried out with the help of donor assistance (Swedfund). One of the priority options is the installation of gas-piston units with a total capacity of up to 80 MW of electricity, operating in cogeneration mode. This will allow operation in the mode of multiple equipment starts without reducing the reliability of the equipment, choosing the most advantageous price position in the electricity market in terms of the day. The cogeneration component will compensate for part of the thermal capacity of the station with more advantageous specific costs for heat generation, reducing the cost of heat production by reducing heat generation on morally and physically obsolete equipment. In addition, electricity generation can be carried out year-round
Budget59'706'400'000 UAH
Implementation period36 months