The alternative technical solution involves the construction and commissioning of a gas-piston power plant with a total installed capacity of up to 20 MW, which will operate on natural gas. The power plant is designed to produce electricity with the possibility of its sale on the Ukrainian electricity market, in particular on the day-ahead market (DAW), as well as to provide auxiliary services for balancing the Unified Energy System of Ukraine. Gas-piston plants are characterized by high maneuverability, quick start-up and the ability to operate effectively in variable load modes, which allows them to be used to cover peak loads and compensate for unstable generation from renewable energy sources. The project involves the supply and installation of gas-piston modules, auxiliary technological systems, power supply, automation, gas supply systems, as well as the performance of construction, installation and commissioning works.
Budget1'525'133'169 UAH
Implementation period24 months