The alternative solution involves overhauling the existing hydroelectric power plant with the restoration of its structural elements, hydraulic structures and engineering systems, taking into account modern technical, safety and environmental requirements. As part of the implementation of the solution, it is planned to replace worn-out structures, restore the capacity of the structure, strengthen the banks and the riverbed, as well as implement measures to increase the reliability and durability of the facility. The implementation of the overhaul will ensure stable and safe operation of the hydroelectric power plant, reduce the risks of flooding of nearby territories, contribute to the protection of the population and infrastructure, and also have a positive impact on the state of aquatic and coastal ecosystems.
Budget8'600'000 UAH
Implementation period18 months