General information
Description of the project
- Problem and need
The project solves the problem of the critical inconsistency of the maternity ward of the Artsyz Central Maternity Hospital with the rapidly increasing workload and modern standards.
- Increased workload: since 2022, as a result of optimizing the network of maternity wards, the department has become a single center for 10 communities. The number of births has increased from 344 in 2022 to 434 in 2024.
- Physical wear and tear: the building was put into operation 34 years ago (1990), and major repairs have never been carried out. Engineering communications (water supply, electricity, heating) are critically worn out, and the material and technical condition has deteriorated.
- Health risk: the lack of proper conditions worsens the psycho-emotional state of women in labor and jeopardizes the timely and high-quality provision of medical services, on which the number of live-born babies in the region directly depends.
2. Project content and features
This is an ongoing project, which has been implemented since 2025 within the framework of the Ukraine Recovery Program III.
The project involves a comprehensive overhaul of the premises to modernize the department. Key areas of work:
- Complete renovation of engineering networks: replacement of communications (sewerage, water supply, heating, electric lighting, ventilation) to ensure reliable and uninterrupted operation.
- Modernization of premises: dismantling of old coatings, installation of new partitions, ceilings, screeds, replacement of windows and doors with metal-plastic blocks, as well as finishing.
3. Expected results
- Increased reliability and quality: bringing the department to modern sanitary and hygienic standards, which guarantees safer and higher-quality services.
- Increased throughput: the overhaul will increase the number of beds from 25 to 35, ensuring comfortable service for the growing flow of patients.
- Social effect: improving conditions will contribute to the rapid rehabilitation of women. In addition, 5 new jobs will be created, including for IDPs.
The project is a strategic investment in the protection of motherhood and childhood, providing a vital medical service for the entire region.
The purpose of the project
Main Goal:
Increasing compliance with modern standards
Secondary Goal:
Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions, Creation of new jobs through project implementation, Improving the quality of services, Reducing territorial or social gaps, Meeting demand
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Capacity
35 beds
Number of users from low-mobility population groups
100 human
Number of IDP users
100 human
Number of employees of the institution/institution/organization
26 human
Number of jobs, including for IDPs
26 workplaces
Number of people who will use the service
700 human
Other social
95 %
Population in the geographical area of influence of the project
42321 human
Number of IDPs in the geographical area of impact of the project
7500 human
Strategic Case
Strategic feasibility of the project
Sector
Healthcare
Subsector
Specialized medical care
Stream
Support for motherhood and childhood in Ukraine
Strategic document
Стратегія розвитку територіальної громади
Task
2.2.3 Affordable and high-quality medical services
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
Major renovation of the maternity ward of the Artsyzka TsOL KNP
Technical Solution 2
New Maternity Ward Building (New Building)
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Risk assessment
Team involvement
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]