MAJOR REPAIR OF THE TRANSPORT INTERSECTION AT THE INTERSECTION OF AIR FORCES AVENUE WITH BORSCHAGIVSKA STREET AND ZHYLIANSKA STREET IN THE SOLOMYANSKI AND SHEVCHENKIVSKI DISTRICT OF KYIV


Sector
Transport Sector
Stream
Модернізація та розвиток вулично-шляхової мережі та штучних споруд міста (мости та шляхопроводи) з урахуванням принципів доступності та гендерних підходів
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Regional level of SP
Implementation
Completion

General information

Description of the project

According to the latest inspections of the transport hub at the intersection of Air Force Avenue with Borshchagovskaya Street and Zhylyanskaya Street, two bridge structures are in an inoperable condition (State 5), the other two structures are in a limited operable condition (State 4). According to the conclusions of the inspections, these structures require repair work (overhaul). Existing defects in the overpass structures are progressing and negatively affect the reliability and durability of the structure, and also reduce the level of safety for motor vehicles and pedestrians, both on the structures and under them.
Conducting works on the overhaul of the bridge structure will allow bringing the geometric parameters  and operational qualities of the structure elements in accordance with the requirements of current regulatory documents. It will ensure safe and uninterrupted movement for all road users.

The purpose of the project

Main Goal:

Improving the condition of infrastructure

Secondary Goal:

Increasing compliance with modern standards

Description of the purpose of the project and ways to achieve it

Carrying out major repairs to the bridge structure will bring the geometric parameters and operational qualities of the structure's elements into line with the requirements of current regulatory documents. It will ensure safe and uninterrupted traffic for all road users.

Problems and solutions resulting from project implementation

Socio-economic context

Indicator

Value

Capital expenditure per year

10000 thous. UAH

Strategic Case

Strategic feasibility of the project

Sector

Transport Sector

Subsector

Road transport and road infrastructure

Stream

Модернізація та розвиток вулично-шляхової мережі та штучних споруд міста (мости та шляхопроводи) з урахуванням принципів доступності та гендерних підходів

Strategic document

Стратегія розвитку територіальної громади

Task

Завдання 2.3 Модернізація та розвиток вуличношляхової мережі та штучних споруд міста (мости та шляхопроводи) з урахуванням принципів доступності та гендерних підходів

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Economic justification

Documents

Name
Date
Order of the State Tax Inspectorate No. 37 dated 06.02.2026_on the Address List_for dream.pdf
29.04.2026
07:47:54 UTC

Alternative technical solutions

Technical Solution 1

MAJOR REPAIR OF THE TRANSPORT INTERSECTION AT THE INTERSECTION OF AIR FORCES AVENUE WITH BORSCHAGIVSKA STREET AND ZHYLIANSKA STREET IN THE SOLOMYANSKI AND SHEVCHENKIVSKI DISTRICT OF KYIV

Technical Solution 2

Reconstruction of the transport hub at the intersection of Air Force Avenue with Borschagivska Street and Zhylyanska Street in Solomiansky and Shevchenkivsky districts of Kyiv

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)574'809'476 UAH747'252'400 UAH
For preparation22'248'000 UAH28'922'400 UAH
For implementation552'561'476 UAH718'330'000 UAH
Project operation and closure cost0 UAH0 UAH
Average annual costs28'740'474 UAH0 UAH
Project duration, incl.36 months48 months
Deadline for developing a FFS12 months18 months
Implementation period24 months30 months
Service life240 months240 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Financial justification

Total project budget

Total preliminary budget574'809'476 UAH747'252'400 UAH
Project cost (preparation and implementation)574'809'476 UAH747'252'400 UAH
For preparation22'248'000 UAH28'922'400 UAH
For implementation552'561'476 UAH718'330'000 UAH
Project operation and closure cost0 UAH0 UAH
For operation0 UAH0 UAH
For closing0 UAH0 UAH

Average project cost per service recipient

Service UnitОрієнтовна загальна кошторисна вартість по об`єкту
Service Unit Cost574'809'476 UAH

Profitability of the project

Is the project expected to generate income?NoNo
Is the project self-sustaining?No

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
29/04/2026SP-R-290426-79790785Regional SPInvestment Feasibility StudyInclude--