Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system at the Velikooleksandrivka preschool educational institution No. 2 of the Velikooleksandrivka village council, located at: * st., Velyka Oleksandrivka village, Beryslav district, Kherson region


Sector
Municipal infrastructure and services
Stream
Development and rehabilitation of municipal infrastructure of subnational governments
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

The project involves the reconstruction of the power supply system of the Velikooleksandrivskyi preschool education institution No. 2 by installing a ground-based photovoltaic station with an electricity storage system on the territory of the institution with an area of 1101.4 m². The implementation of the project is aimed at increasing the reliability and energy sustainability of the social infrastructure facility, reducing dependence on centralized power supply and ensuring stable functioning of engineering systems. The expected result is partial coverage of the institution's own electricity needs and effective use of renewable energy sources in the medium and long term.

The purpose of the project

Main goal:

Introducing innovations and energy-efficient solutions

Secondary goal:

Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the condition of infrastructure, Improving the quality of services

Description of the purpose of the project and ways to achieve it

The goal of the project is to ensure stable and uninterrupted power supply to the preschool educational institution by reconstructing the power supply system with the installation of a ground-based solar power plant, in order to increase the energy sustainability of the social infrastructure facility in the deoccupied frontline community. The goal is expected to be achieved by reconstructing the existing power supply system with the installation of a solar power plant with a full range of electrical equipment and its integration with the institution's internal networks, which will allow partially covering the needs for electricity from renewable sources. The current state is characterized by the institution's complete dependence on centralized power supply, which in the conditions of the frontline territory is unstable and vulnerable to emergency shutdowns. The target state assumes the presence of a reconstructed power supply system with its own source of electricity generation, which reduces the impact of external risks and ensures more reliable functioning of the institution. The implementation of the project allows to eliminate the existing gap between the current and target states.

Problems and solutions resulting from project implementation

The key problem is the lack of energy sustainability of the preschool educational institution in the conditions of the frontline territory. Despite the fact that currently the centralized power supply is functioning, military operations and risks of damage to the energy infrastructure create a high probability of sudden interruptions or long power outages. The relevance of this problem is due to the lack of backup or alternative power supply sources, which limits the ability of the institution to ensure continuous operation of engineering systems and compliance with proper operating conditions in the event of emergencies. If this problem is not resolved, interruptions in the work of the institution, a decrease in the level of security and complications in the organization of the educational process are possible. The implementation of the project will reduce dependence on external sources of power supply, increase the level of energy sustainability of the institution and ensure its more stable operation in conditions of increased security risks.

Socio-economic context

Indicator

Value

Other functional

120 human

Number of employees of the institution/institution/organization

30 workplaces

Other functional

1101.4 m2

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Development and Reconstruction of Subnational Infrastructure

Stream

Development and rehabilitation of municipal infrastructure of subnational governments

Strategic document

Стратегія розвитку територіальної громади

Task

1.1.2 Ensure the development of cultural and local heritage protection centers that form local self-awareness and bind residents to their places of residence

Project objectives

Indicator
Base value
Target value
Availability of own source of electricity generation in the ZDO
0 units
1 units
Capacity of the installed solar power plant within the framework of the reconstruction of the power supply system
0 kW
50 kW

Project Sustainable Development Goals

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
1
30 workplaces
Annual demand for services/infrastructure
1
120 human
Economic justification

Documents

Name
Date
Justification of financial support mechanisms.docx
28.01.2026
12:52:16 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system at the Velikooleksandrivka preschool educational institution No. 2 of the Velikooleksandrivka village council, located at: * st., Velyka Oleksandrivka village, Beryslav district, Kherson region

Technical Solution 2

Installing a diesel generator as a backup power source

Total costs5'210'001 UAH6'260'001 UAH
  • For preparation
  • 660'000 UAH60'000 UAH
  • For implementation
  • 3'500'000 UAH1'200'000 UAH
  • For operation
  • 1'050'000 UAH5'000'000 UAH
  • For closing
  • 1 UAH1 UAH
    Average annual costs52'500 UAH500'000 UAH
    Project duration, incl.17 months2 months
  • Deadline for developing a FFS
  • 5 months1 month
  • Implementation period
  • 12 months1 month
    Service life240 months120 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    0
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget5'210'001 UAH6'260'001 UAH
    Capital costs5'210'001 UAH6'260'001 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation660'000 UAH60'000 UAH
    For implementation3'500'000 UAH1'200'000 UAH
    For operation1'050'000 UAH5'000'000 UAH
    For closing1 UAH1 UAH

    Average project cost per service recipient

    Service Unit1 об’єкт соціальної інфраструктури (заклад дошкільної освіти)
    Service Unit Cost4'160'000 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH