Reconstruction of the water supply system on Sadova, Parkova, Shkilna streets of the village of Styike, Beryslav district, Kherson region (damaged as a result of the armed aggression of the Russian Federation)
- Preparation
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
General information
Description of the project
The project of reconstruction of the water supply network is a complex of construction works on an already commissioned facility, which involves changing its technical and economic indicators, improving the quality of water supply and improving operating conditions. The main stages of reconstruction. The process is implemented in several stages: Design: includes obtaining technical specifications from the water supply organization, developing a feasibility study and working drawings. Preparatory work: coordinating the location of existing underground communications with their owners, fencing the work area. Construction and installation works: Development of trenches (the depth is usually 1.5-2 m, depending on the level of soil freezing). Dismantling of old and laying new pipelines (for example, replacing steel pipes with polyethylene). Installation of shut-off valves, fire hydrants and arrangement of wells. Commissioning work: flushing and disinfection of the network, hydraulic tests for strength and tightness.
The purpose of the project
Main goal:
Rebuilding the damaged/destroyed
Secondary goal:
Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the condition of infrastructure, Improving the quality of services
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of IDP users
97 human
Number of people who will use the service
864 human
Strategic Case
Strategic feasibility of the project
Sector
Municipal infrastructure and services
Subsector
Development and Reconstruction of Subnational Infrastructure
Stream
Development and rehabilitation of municipal infrastructure of subnational governments
Strategic document
Стратегія розвитку територіальної громади
Task
1.1.2 Ensure the development of cultural and local heritage protection centers that form local self-awareness and bind residents to their places of residence
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Публічна кадастрова карта України (для уточнення меж забудови та планів розвитку території), Система DREAM (Аналіз аналогічних проектів у регіоні та громадах для порівняння вартості та показників ефективності)
Does the demand forecast take into account the latest demographic and economic forecasts?
про прогнозі попиту враховано останні демографічні та економічні показники
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
не застосовується до вказаного пректу
проектом передбачається адаптація до зміни клімату
проектом передбачається запобігання та контроль забруднення навколишнього середовища, екологічної системи
not applicable
так, проєктом передбачається захист і відновлення біорізноманіття та екосистем
в процесі реалізації проєкту будуть використані матеріали які забезпечують внесок у досягнення кліматичних або довкіллєвих цілей
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
передбачається запобігання та контроль забруднення
так передбачається адаптація для зміни клімату
передбачається захист і відновлення екосистеми
Так, в процесі реалізації проєкту вбачається потенційний позитивний внесок у досягнення кліматичних або довкілевих цілей
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?
Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?
за характеристикою проєкт не проєкт проведення оцінки впливу на довкілля (ОВД) відповідно до Закону України «Про оцінку впливу на довкілля»?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Were consultations held with representatives of target groups to take into account gender equality issues in the project?
Have the gender risks and social impacts of the project been assessed?
Are there management and institutional mechanisms in place to ensure gender equality?
Alternative technical solutions
Technical Solution 1
Reconstruction of the water supply system on Sadova, Parkova, Shkilna streets of the village of Styike, Beryslav district, Kherson region (damaged as a result of the armed aggression of the Russian Federation)
Technical Solution 2
Current repairs of the water supply system on the streets of the settlement of the village of Styike, settlement territorial community
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Investment Feasibility Study]
проєкт залучить достатню кількість учасників торгів, щоб забезпечити реальну конкуренцію, яка спонукатиме учасників торгів мислити інноваційно та максимізувати якість своїх пропозицій
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
проєкт залучить національні або міжнародні постачальників та підрядників
[Response was provided in the Investment Feasibility Study]
проводився аналіз доступних варіантів закупівель відповідно до вимог законодавства
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
передбачені законодавством
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Preliminary cost breakdown
Average project cost per service recipient
Profitability of the project
Is the project expected to generate income?
Availability of services
[Response was provided in the Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Team competencies
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
у разі необхідності потребує залучення експертів
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]