Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system of the Bilokrynytsia Support Gymnasium at the address: Bila Krynytsia village, Beryslav district, Kherson region


Sector
Municipal infrastructure and services
Stream
Development and rehabilitation of municipal infrastructure of subnational governments
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

The project plans to comprehensively reconstruct the power supply system of the Bilokrynytsia Support Gymnasium with the implementation of modern solutions in the field of renewable energy. In particular, it is planned to install a 50 kW photovoltaic power plant and an electricity storage system, which will ensure stable and autonomous power supply to the educational institution. The project is aimed at solving the problems of unstable and emergency power supply, which negatively affect the continuity of the educational process, the safety of students and employees, as well as the functioning of the institution in conditions of military threats. The lack of backup power sources limits the possibility of using the gymnasium as a safe space and a community support facility during emergencies. The expected results of the project are to increase the energy independence and sustainability of the educational institution, ensure uninterrupted operation of critical systems, reduce electricity costs from the local budget, and reduce carbon emissions through the use of renewable energy sources. The implementation of the project will contribute to the creation of safe and stable conditions for learning and the strengthening of the social infrastructure of the community. 

The purpose of the project

Main goal:

Introducing innovations and energy-efficient solutions

Secondary goal:

Increasing compliance with modern standards, Improving the quality of services

Description of the purpose of the project and ways to achieve it

The purpose of the public investment project is to create a reliable, energy-independent and sustainable power supply system for the Bilokrynytsia Support Gymnasium by reconstructing existing electrical networks and implementing a photovoltaic power plant with an electricity storage system. The project is aimed at ensuring a continuous educational process, increasing the level of safety of students and staff, as well as reducing the institution's dependence on centralized power supply in conditions of military risks and emergency outages. The project goal is planned to be achieved by applying a set of organizational, technical and investment measures, in particular: conducting a technical inspection and reconstruction of the existing power supply system of the gymnasium taking into account modern energy efficiency and safety requirements; installing a photovoltaic power plant that will ensure the production of electricity from renewable sources; implementing an electricity storage system to ensure the institution's autonomous operation during emergency or planned outages; integration of new equipment with existing infrastructure and setting up priority power supply for critical consumers; organization of commissioning and training of responsible personnel. The existing gap between the current state and the target level is that today the gymnasium's power supply is completely dependent on external networks, which are unstable and vulnerable to damage. There are no own sources of generation and storage of electricity, which leads to the suspension of the educational process, restrictions on the use of the building in emergency situations and increased operating costs. The target level provides for the functioning of a modernized power supply system with the possibility of autonomous operation, guaranteed power supply of critical infrastructure and reduced electricity costs, which is currently unattainable without the implementation of a public investment project.

Problems and solutions resulting from project implementation

The main problem that the project aims to solve is the instability and vulnerability of the power supply of the Bilokrynytsia Support Gymnasium, which is due to the institution's complete dependence on centralized power grids. In conditions of military operations and regular emergency power outages, this creates significant risks for the continuity of the educational process, the safety of students and staff, as well as for the preservation of the institution's material and technical base. The relevance of the problem at present is due to the increasing load on the power system, the high probability of damage to networks in the front-line regions of the Kherson region, and the need to ensure stable operation of social infrastructure facilities. The lack of autonomous power sources makes it impossible for the gymnasium to fully function during long outages, limits the use of the building as a safe space, and reduces the level of community preparedness for emergencies. The implementation of the project will ensure positive systemic changes, in particular the creation of a non-volatile and reliable power supply system capable of ensuring the autonomous operation of the gymnasium. It is expected to increase the continuity and quality of the educational process, reduce electricity costs, increase the level of energy security and environmental sustainability. The project will also contribute to strengthening the social infrastructure of the community and increasing its ability to respond to crisis situations.

Socio-economic context

Indicator

Value

Number of employees of the institution/institution/organization

30 human

Number of people who will use the service

225 human

Number of IDP users

40 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Development and Reconstruction of Subnational Infrastructure

Stream

Development and rehabilitation of municipal infrastructure of subnational governments

Strategic document

Стратегія розвитку територіальної громади

Task

1.1.2 Ensure the development of cultural and local heritage protection centers that form local self-awareness and bind residents to their places of residence

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
1
220 human
Economic justification

Documents

Name
Date
fin.abg..docx
28.01.2026
11:26:51 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system of the Bilokrynytsia Support Gymnasium at the address: Bila Krynytsia village, Beryslav district, Kherson region

Technical Solution 2

Installing a diesel (or gasoline) electric generator

Total costs5'210'001 UAH1'880'000 UAH
  • For preparation
  • 660'000 UAH50'000 UAH
  • For implementation
  • 3'500'000 UAH1'200'000 UAH
  • For operation
  • 1'050'000 UAH600'000 UAH
  • For closing
  • 1 UAH30'000 UAH
    Average annual costs52'500 UAH500'000 UAH
    Project duration, incl.15 months6 months
  • Deadline for developing a FFS
  • 3 months3 months
  • Implementation period
  • 12 months3 months
    Service life240 months84 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    0
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget5'210'001 UAH1'880'000 UAH
    Capital costs5'210'001 UAH1'880'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation660'000 UAH50'000 UAH
    For implementation3'500'000 UAH1'200'000 UAH
    For operation1'050'000 UAH600'000 UAH
    For closing1 UAH30'000 UAH

    Average project cost per service recipient

    Service UnitСередня вартість на одного отримувача
    Service Unit Cost22'652 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH