Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system of the Bilokrynytsia Support Gymnasium at the address: Bila Krynytsia village, Beryslav district, Kherson region


Sector
Municipal infrastructure and services
Stream
Development and rehabilitation of municipal infrastructure of subnational governments
Maturity level
83
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project plans to comprehensively reconstruct the power supply system of the Bilokrynytsia Support Gymnasium with the implementation of modern solutions in the field of renewable energy. In particular, it is planned to install a 50 kW photovoltaic power plant and an electricity storage system, which will ensure stable and autonomous power supply to the educational institution. The project is aimed at solving the problems of unstable and emergency power supply, which negatively affect the continuity of the educational process, the safety of students and employees, as well as the functioning of the institution in conditions of military threats. The lack of backup power sources limits the possibility of using the gymnasium as a safe space and a community support facility during emergencies. The expected results of the project are to increase the energy independence and sustainability of the educational institution, ensure uninterrupted operation of critical systems, reduce electricity costs from the local budget, and reduce carbon emissions through the use of renewable energy sources. The implementation of the project will contribute to the creation of safe and stable conditions for learning and the strengthening of the social infrastructure of the community. 

The purpose of the project

Main Goal:

Introducing innovations and energy-efficient solutions

Secondary Goal:

Increasing compliance with modern standards, Improving the quality of services

Description of the purpose of the project and ways to achieve it

The purpose of the public investment project is to create a reliable, energy-independent and sustainable power supply system for the Bilokrynytsia Support Gymnasium by reconstructing existing electrical networks and implementing a photovoltaic power plant with an electricity storage system. The project is aimed at ensuring a continuous educational process, increasing the level of safety of students and staff, as well as reducing the institution's dependence on centralized power supply in conditions of military risks and emergency outages. The project goal is planned to be achieved by applying a set of organizational, technical and investment measures, in particular: conducting a technical inspection and reconstruction of the existing power supply system of the gymnasium taking into account modern energy efficiency and safety requirements; installing a photovoltaic power plant that will ensure the production of electricity from renewable sources; implementing an electricity storage system to ensure the institution's autonomous operation during emergency or planned outages; integration of new equipment with existing infrastructure and setting up priority power supply for critical consumers; organization of commissioning and training of responsible personnel. The existing gap between the current state and the target level is that today the gymnasium's power supply is completely dependent on external networks, which are unstable and vulnerable to damage. There are no own sources of generation and storage of electricity, which leads to the suspension of the educational process, restrictions on the use of the building in emergency situations and increased operating costs. The target level provides for the functioning of a modernized power supply system with the possibility of autonomous operation, guaranteed power supply of critical infrastructure and reduced electricity costs, which is currently unattainable without the implementation of a public investment project.

Problems and solutions resulting from project implementation

The main problem that the project aims to solve is the instability and vulnerability of the power supply of the Bilokrynytsia Support Gymnasium, which is due to the institution's complete dependence on centralized power grids. In conditions of military operations and regular emergency power outages, this creates significant risks for the continuity of the educational process, the safety of students and staff, as well as for the preservation of the institution's material and technical base. The relevance of the problem at present is due to the increasing load on the power system, the high probability of damage to networks in the front-line regions of the Kherson region, and the need to ensure stable operation of social infrastructure facilities. The lack of autonomous power sources makes it impossible for the gymnasium to fully function during long outages, limits the use of the building as a safe space, and reduces the level of community preparedness for emergencies. The implementation of the project will ensure positive systemic changes, in particular the creation of a non-volatile and reliable power supply system capable of ensuring the autonomous operation of the gymnasium. It is expected to increase the continuity and quality of the educational process, reduce electricity costs, increase the level of energy security and environmental sustainability. The project will also contribute to strengthening the social infrastructure of the community and increasing its ability to respond to crisis situations.

Socio-economic context

Indicator

Value

Number of employees of the institution/institution/organization

30 human

Number of people who will use the service

225 human

Number of IDP users

40 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Development and Reconstruction of Subnational Infrastructure

Stream

Development and rehabilitation of municipal infrastructure of subnational governments

Strategic document

Стратегія розвитку територіальної громади

Task

1.1.2 Ensure the development of cultural and local heritage protection centers that form local self-awareness and bind residents to their places of residence

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Аналіз функціонального призначення об’єкта, Аналіз цільової аудиторії, Аналіз фактичного споживання та режимів роботи, Оцінка ризиків і сценарний аналіз
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
220 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Protecting and restoring biodiversity and ecosystems
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Envisaged training or advanced training for women in the private sector
[Response was provided in the Preliminary Investment Feasibility Study]
The project will improve women's access to education (primary, secondary, vocational)
[Response was provided in the Preliminary Investment Feasibility Study]
The project will create jobs available to women (temporarily or permanently)
[Response was provided in the Preliminary Investment Feasibility Study]
The project will improve women's access to safe water, food, and medical services
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
fin.abg..docx
28.01.2026
11:26:51 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system of the Bilokrynytsia Support Gymnasium at the address: Bila Krynytsia village, Beryslav district, Kherson region

Technical Solution 2

Installing a diesel (or gasoline) electric generator

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)4'160'000 UAH1'250'000 UAH
For preparation660'000 UAH50'000 UAH
For implementation3'500'000 UAH1'200'000 UAH
Project operation and closure cost1'050'001 UAH630'000 UAH
For operation1'050'000 UAH600'000 UAH
For closing1 UAH30'000 UAH
Average annual costs52'500 UAH0 UAH
Project duration, incl.15 months6 months
Deadline for developing a FFS3 months3 months
Implementation period12 months3 months
Service life240 months84 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget5'210'001 UAH1'880'000 UAH
Project cost (preparation and implementation)4'160'000 UAH1'250'000 UAH
For preparation660'000 UAH50'000 UAH
For implementation3'500'000 UAH1'200'000 UAH
Project operation and closure cost1'050'001 UAH630'000 UAH
For operation1'050'000 UAH600'000 UAH
For closing1 UAH30'000 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitСередня вартість на одного отримувача
Service Unit Cost22'652 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

Finalization of existing documentation for the preparation of a preliminary feasibility study
[Response was provided in the Investment Feasibility Study]
Updating existing documentation regarding the preparation of the feasibility study
[Response was provided in the Investment Feasibility Study]
Updating existing documentation regarding the preparation of design and estimate documentation (DED)
[Response was provided in the Investment Feasibility Study]

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
29/01/2026SP-L-290126-445A4D92Community SPInvestment Feasibility StudyIncludeStrategic fit confirmed-
11/02/2026SPP-L-110226-FD64C890Community SPPInvestment Feasibility StudyIncludeStrategic fit confirmed83