Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system on the basis of the Velikooleksandrivka Lyceum of the Velikooleksandrivka Village Council, located at the following address: Kherson region, Beryslav district, Velyka Oleksandrivka village, Bratska st.,*


Sector
Municipal infrastructure and services
Stream
Development and rehabilitation of municipal infrastructure of subnational governments
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

The goal of the project is to reconstruct the power supply system by installing a 100 kW solar photovoltaic plant with an electricity storage system on the basis of the Velikooleksandrivsky Lyceum. The implementation of the project will ensure stable and uninterrupted power supply to the educational institution, reduce energy costs, and increase the energy efficiency and energy independence of the facility. The total cost of the project is UAH 6,000,000. The funds will be used to purchase, install, and configure solar panels, inverters, energy storage systems, as well as accompanying construction and electrical installation work. The expected results include: reducing greenhouse gas emissions, increasing energy security, creating a demonstration educational example for lyceum students on the use of renewable energy sources, and the possibility of partial backup power in the event of interruptions in centralized power supply.

The purpose of the project

Main goal:

Introducing innovations and energy-efficient solutions

Secondary goal:

Increasing compliance with modern standards

Description of the purpose of the project and ways to achieve it

The goal of the project is to introduce innovative and energy-efficient solutions into the power supply system of the Veliko Oleksandrivsky Lyceum by installing a 100 kW solar power plant with an energy storage system. This will reduce the institution's dependence on unstable centralized power supply, reduce electricity costs, and create conditions for a continuous educational process. The goal is expected to be achieved by: installing a modern solar power plant with high efficiency; integrating an energy storage system to cover peak loads and emergency power; modernizing power grids and connection points; conducting educational and awareness-raising work among students and employees of the institution on the topic of energy efficiency.

Problems and solutions resulting from project implementation

The key problem is unreliable power supply and the lack of an autonomous energy source. This limits the functioning of the institution, creates risks of interruptions in the educational process and makes it impossible to implement modern digital technologies in education. If this problem is not eliminated, frequent interruptions in the educational process, damage to technical equipment and a decrease in the safety of students' stay in the institution are possible. The implementation of the project will allow: to achieve energy autonomy; to reduce electricity costs; to increase the safety and comfort of staying in the lyceum; to create a demonstration example for spreading the principles of sustainable energy among young people.

Socio-economic context

Indicator

Value

Number of people who will use the service

611 human

Number of employees of the institution/institution/organization

60 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Development and Reconstruction of Subnational Infrastructure

Stream

Development and rehabilitation of municipal infrastructure of subnational governments

Strategic document

Стратегія розвитку територіальної громади

Task

1.1.2 Ensure the development of cultural and local heritage protection centers that form local self-awareness and bind residents to their places of residence

Project objectives

Indicator
Base value
Target value
Number of days of uninterrupted power supply per year (including storage)
300 day
360 day
Expected annual reduction in electricity costs
0 UAH
450000 UAH
The share of coverage of the lyceum's annual electricity consumption by solar power plants
0 %
70 %
Capacity of the installed solar power plant
0 kW
100 kW

Project Sustainable Development Goals

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
1
125000 kWh
Economic justification

Documents

Name
Date
Economic_Analysis.docx
28.01.2026
10:06:18 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system on the basis of the Velikooleksandrivka Lyceum of the Velikooleksandrivka Village Council, located at the following address: Kherson region, Beryslav district, Velyka Oleksandrivka village, Bratska st.,*

Technical Solution 2

Installation of a diesel generator

Total costs8'460'001 UAH3'850'000 UAH
  • For preparation
  • 660'000 UAH100'000 UAH
  • For implementation
  • 6'000'000 UAH1'200'000 UAH
  • For operation
  • 1'800'000 UAH2'500'000 UAH
  • For closing
  • 1 UAH50'000 UAH
    Average annual costs90'000 UAH250'000 UAH
    Project duration, incl.17 months6 months
  • Deadline for developing a FFS
  • 5 months2 months
  • Implementation period
  • 12 months4 months
    Service life240 months120 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    0
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget8'460'001 UAH3'850'000 UAH
    Capital costs8'460'001 UAH3'850'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation660'000 UAH100'000 UAH
    For implementation6'000'000 UAH1'200'000 UAH
    For operation1'800'000 UAH2'500'000 UAH
    For closing1 UAH50'000 UAH

    Average project cost per service recipient

    Service Unit1 об’єкт критичної інфраструктури
    Service Unit Cost6'000'000 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH
    Management Rationale

    Risk assessment

    Technical riskDefinedUndefined
    Financial riskDefinedUndefined
    Economic riskDefinedUndefined
    Political riskDefinedUndefined
    Social riskDefinedUndefined
    Operational riskDefinedUndefined
    Market riskDefinedUndefined
    Environmental riskDefinedUndefined
    Other riskDefinedUndefined