Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system on the basis of the Malooleksandrivska gymnasium of the Velikooleksandrivska village council


Sector
Municipal infrastructure and services
Stream
Development and rehabilitation of municipal infrastructure of subnational governments
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

The project involves the reconstruction of the power supply system of the Malooleksandrivska Gymnasium of the Velikooleksandrivska Village Council with the installation of a photovoltaic (solar) power plant and an electricity storage system. The implementation of the project is aimed at increasing the energy independence of the educational institution, ensuring uninterrupted power supply in conditions of emergency and planned power outages, as well as reducing electricity costs from the local budget. The project solves the problem of unstable power supply of the educational process and creates conditions for the safe and continuous functioning of the educational institution. The expected results are to increase the energy efficiency of the building, ensure autonomous power supply of critical systems, reduce the load on the power grid and form an environmentally responsible approach to the use of energy resources.

The purpose of the project

Main goal:

Introducing innovations and energy-efficient solutions

Secondary goal:

Contribution to climate or environmental goals, Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the condition of infrastructure, Improving the quality of services

Description of the purpose of the project and ways to achieve it

The goal of the project is to ensure reliable, uninterrupted and energy-efficient power supply to Malooleksandrivska Gymnasium by reconstructing the power supply system with the installation of a photovoltaic power plant and an electricity storage system. Methods of achieving the goal: implementation of a complex of construction and installation works, installation of solar panels, inverter equipment and batteries, modernization of internal power networks and setting up an autonomous power supply system for critical consumers.

Problems and solutions resulting from project implementation

Main problems: unstable power supply, risk of complete cessation of the educational process during outages, increased electricity costs, lack of energy-efficient and alternative power sources. Expected results: ensuring uninterrupted operation of the educational institution, reducing electricity costs, increasing energy independence and reliability of power supply, creating safe conditions for training and work of personnel.

Socio-economic context

Indicator

Value

Number of people who will use the service

200 human

Number of employees of the institution/institution/organization

30 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Development and Reconstruction of Subnational Infrastructure

Stream

Development and rehabilitation of municipal infrastructure of subnational governments

Strategic document

Стратегія розвитку територіальної громади

Task

1.1.2 Ensure the development of cultural and local heritage protection centers that form local self-awareness and bind residents to their places of residence

Project objectives

Indicator
Base value
Target value
Reducing electricity consumption from the centralized network
0 %
30 %
Level of ensuring uninterrupted power supply to critical systems of the institution
0 %
100 %
Number of educational institutions provided with autonomous power supply
0 units
1 units
Capacity of the installed photovoltaic power plant
0 kW
50 kW

Project Sustainable Development Goals

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
1
120000 kWh
Economic justification

Documents

Name
Date
analysis.docx
28.01.2026
09:17:03 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of the power supply system with the installation of a photovoltaic station with an electricity storage system on the basis of the Malooleksandrivska gymnasium of the Velikooleksandrivska village council

Technical Solution 2

Installation of a diesel generator

Total costs5'210'001 UAH3'850'000 UAH
  • For preparation
  • 660'000 UAH100'000 UAH
  • For implementation
  • 3'500'000 UAH1'200'000 UAH
  • For operation
  • 1'050'000 UAH2'500'000 UAH
  • For closing
  • 1 UAH50'000 UAH
    Average annual costs52'500 UAH250'000 UAH
    Project duration, incl.17 months6 months
  • Deadline for developing a FFS
  • 5 months2 months
  • Implementation period
  • 12 months4 months
    Service life240 months120 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    0
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget5'210'001 UAH3'850'000 UAH
    Capital costs5'210'001 UAH3'850'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation660'000 UAH100'000 UAH
    For implementation3'500'000 UAH1'200'000 UAH
    For operation1'050'000 UAH2'500'000 UAH
    For closing1 UAH50'000 UAH

    Average project cost per service recipient

    Service Unit1 об’єкт критичної інфраструктури
    Service Unit Cost3'500'000 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH
    Management Rationale

    Risk assessment

    Technical riskDefinedUndefined
    Financial riskDefinedUndefined
    Economic riskDefinedUndefined
    Political riskDefinedUndefined
    Social riskDefinedUndefined
    Operational riskDefinedUndefined
    Market riskDefinedUndefined
    Environmental riskDefinedUndefined
    Other riskDefinedUndefined