New construction (drilling) of an artesian water intake well for domestic water supply in the village of Florine, Haisyn district, Vinnytsia region.


Sector
Municipal infrastructure and services
Stream
Restoration, development and modernization of centralized water supply and wastewater infrastructure
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

Construction (drilling) of an artesian well for domestic water supply, to solve the problem of water supply to the population and industrial facilities in the territory of the village of Florine, the result will be reliable and high-quality water supply, an increase in the number of subscribers and, as a result, an increase in revenues from the services provided.

The purpose of the project

Main goal:

Improving the quality of services

Secondary goal:

Increasing compliance with modern standards, Improving the equality of wealth distribution

Description of the purpose of the project and ways to achieve it

The goal of the project is to create a reliable, long-term and high-quality source of water supply. The implementation of the following objectives will help to successfully achieve the set goal, namely: -To ensure a stable supply of water in quantities sufficient to cover all needs, taking into account peak loads; -To build a structure that will have a long service life (dozens of years) due to access to a deep and protected aquifer; -To achieve water intake from a deep aquifer that is naturally protected from surface pollution (sewage, industrial effluents, pesticides); -To obtain water that, after the necessary preparation and filtration, will comply with state sanitary norms and drinking water quality standards;

Problems and solutions resulting from project implementation

Lack of access to the centralized water supply network, reduced water levels in wells of private households. As a result of the successful implementation of the project, the population will be provided with access to water supply of appropriate quality. The problem is especially relevant against the background of the negative trend of reducing the water level in wells and deteriorating water quality in them. The negative consequences are a decrease in the quality of life of the population and an impact on the health of community residents.

Socio-economic context

Indicator

Value

Number of people who will use the service

90 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Water supply and sanitation

Stream

Restoration, development and modernization of centralized water supply and wastewater infrastructure

Strategic document

Стратегія розвитку територіальної громади

Task

2.1.1 Development of documentation and support for projects for the installation of a centralized water supply and drainage system, construction of water pipelines

Project objectives

Indicator
Base value
Target value
Number of subscribers
0 human
90 human

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Poll
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
90 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

The project will improve women's access to safe water, food, and medical services
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Proposal Bershad, Vinnytsia region_c2784086-90cd-4d0b-bf09-b055592aa09c.pdf
01.10.2025
07:13:01 UTC

Alternative technical solutions

Technical Solution 1

New construction (drilling) of an artesian water intake well for domestic water supply in the village of Florine, Haisyn district, Vinnytsia region.

Technical Solution 2

Connection to the existing centralized water supply system.

Total costs913'002 UAH500'002 UAH
  • For preparation
  • 98'000 UAH100'000 UAH
  • For implementation
  • 815'000 UAH400'000 UAH
  • For operation
  • 1 UAH1 UAH
  • For closing
  • 1 UAH1 UAH
    Average annual costs18'260 UAH500'000 UAH
    Project duration, incl.8 months8 months
  • Deadline for developing a FFS
  • 2 months2 months
  • Implementation period
  • 6 months6 months
    Service life600 months600 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    1
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Is the project of interest to small and medium-sized enterprises?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Will the project involve national or international suppliers and contractors?
    Yes, only national

    [Response was provided in the Preliminary Investment Feasibility Study]

    Has an analysis of available procurement options been conducted for the technical solution?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Financial justification

    Total project budget

    Total preliminary budget913'002 UAH500'002 UAH
    Capital costs913'002 UAH500'002 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation98'000 UAH100'000 UAH
    For implementation815'000 UAH400'000 UAH
    For operation1 UAH1 UAH
    For closing1 UAH1 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Preliminary Investment Feasibility Study]
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]

    Average project cost per service recipient

    Service UnitНові абоненти
    Service Unit Cost10'144 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    Yes – the analysis was conducted, it was found that the tariffs correspond to the financial capabilities of consumers

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    The project does not fall under the PPP format by its nature/character

    [Response was provided in the Preliminary Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

    None of the options are applicable

    Project Approval History

    DateDecision NumberPortfolioProject StatusDecisionReasons
    03/10/2025SP-L-031025-1BADA79ACommunity SPInvestment Feasibility StudyIncludeThe project is a public investment project, has a socio-economic impact on community development, and fulfills the main goal of public investment.
    12/11/2025SPP-L-121125-EC1D0B10Community SPPInvestment Feasibility StudyNot approvedThe direction to which the project was pulled has been removed.