Reconstruction of internal electrical networks of the building of Konotop Lyceum No. 7 named after Hryhoriy Hulyanytsky, Konotop city municipality, Sumy region, in terms of installing a hybrid solar photovoltaic power station (hereinafter referred to as the SES) at the address: 27 Putyvlska St., Konotop, Sumy region


Sector
Education and science
Stream
Modernization of educational spaces and updating of the material and technical base of academic lyceums
Maturity level
85
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project provides for the reconstruction of the internal electronic networks of Konotop Lyceum No. 7, in terms of installing a hybrid solar photovoltaic station. The solar power station with a total capacity of 30.0 kW  is located on the roof of the educational institution. The power is expected to be supplied to its own networks. 54 photovoltaic modules with a unit capacity of 580 W are designed. The power from 54 photovoltaic modules is collected in four fields and sent to the designed three-phase hybrid inverter. The nominal power of the inverter is 30 kW. In order to accumulate energy for future use and ensure power supply during outages, it is planned to install six accumulator batteries with an accumulated capacity of 5.12 kW/h each.

The purpose of the project

Main Goal:

Increasing compliance with modern standards

Secondary Goal:

Increasing compliance with modern standards

Description of the purpose of the project and ways to achieve it

The main goal of installing a solar power plant (SPP) is energy independence, cost savings, and environmental benefits.

Problems and solutions resulting from project implementation

Solar power plants allow you to reduce electricity costs and provide stable power supply (especially during outages)

Socio-economic context

Indicator

Value

Number of people who will use the service

400 human

Strategic Case

Strategic feasibility of the project

Sector

Education and science

Subsector

School education

Stream

Modernization of educational spaces and updating of the material and technical base of academic lyceums

Strategic document

Регіональна стратегія розвитку

Task

2.1.2 Creating a safe, high-quality, comfortable educational environment

Project objectives

Indicator
Base value
Target value
Ensuring stable power supply during the educational process, especially during centralized network outages
30 kW
30 kW

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Опитування учнів та батьків
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

No
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
500 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

None of the options are applicable

Does the project provide for improving women's access to services?

None of the options are applicable

Are civil society organizations representing women and vulnerable groups included in the consultation process?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Calculation (2).docx
25.11.2025
12:29:39 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of internal electrical networks of the building of Konotop Lyceum No. 7 named after Hryhoriy Hulyanytsky, Konotop city municipality, Sumy region, in terms of installing a hybrid solar photovoltaic power station (hereinafter referred to as the SES) at the address: 27 Putyvlska St., Konotop, Sumy region

Technical Solution 2

Modernization of educational spaces and updating of the material and technical base of lyceums

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)1'456'302 UAH8'000'000 UAH
For preparation40'000 UAH0 UAH
For implementation1'416'302 UAH8'000'000 UAH
Project operation and closure cost1'000 UAH0 UAH
For operation1'000 UAH0 UAH
Average annual costs10'000 UAH0 UAH
Project duration, incl.13 months13 months
Deadline for developing a FFS1 month1 month
Implementation period12 months12 months
Service life120 months180 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Pending

[The project initiator has not taken any decision about this alternative technical approach.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget1'457'302 UAH8'000'000 UAH
Project cost (preparation and implementation)1'456'302 UAH8'000'000 UAH
For preparation40'000 UAH0 UAH
For implementation1'416'302 UAH8'000'000 UAH
Project operation and closure cost1'000 UAH0 UAH
For operation1'000 UAH0 UAH
For closing0 UAH0 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitВартість на одного здобівача послуги
Service Unit Cost3'541 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
No – analysis not performed

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Partially, we have limited experience

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
None of the options are applicable
Is there an understanding of where to find relevant experts and consultants?
Partially, we are considering options

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Market riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
26/11/2025SP-L-261125-1C2AC5F6Community SPInvestment Feasibility StudyInclude--
08/12/2025SPP-L-081225-C2C47E69Community SPPInvestment Feasibility StudyInclude-85