Reconstruction of the gas supply system with replacement of heating boilers in the boiler house located at: Kharkiv region, Chuguyiv district, Zmiiv city, Sokolivske shosse st., building 27A


Sector
Municipal infrastructure and services
Stream
Restoration, modernization and development of centralized and decentralized heating systems
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project involves the reconstruction of the gas supply system with full or partial replacement of outdated heating boilers in the boiler house located at: Kharkiv region, Chuguyiv district, Zmiiv city, Sokolivske shose str., building 27A. The goal of the project is to increase the reliability, energy efficiency and safety of the heat supply of the facility.

The project plans to modernize gas distribution equipment, install modern energy-efficient boilers, update automation, safety and control systems, and bring the boiler house into compliance with current technical and regulatory requirements. The implementation of the project will reduce natural gas consumption, reduce operating costs, reduce the risks of emergency situations and ensure stable heat supply to consumers, which is especially important in the context of military challenges and post-war restoration of community infrastructure.

The purpose of the project

Main goal:

Increasing compliance with modern standards

Secondary goal:

Increasing compliance with modern standards, Improving the condition of infrastructure, Improving the quality of services

Description of the purpose of the project and ways to achieve it

To ensure reliable, safe and energy-efficient heat supply to the facility through the reconstruction of the boiler house gas supply and the replacement of outdated equipment. The project is aimed at reducing gas consumption, reducing operating costs, increasing safety and ensuring stable heat supply, especially in conditions of military risks and infrastructure restoration. Methods of achievement: Modernization of the gas distribution system and installation of modern energy-efficient boilers; Implementation of automated management, control and safety systems; Replacement of auxiliary equipment and bringing the boiler house up to current standards.

Problems and solutions resulting from project implementation

Problems: Worn out and inefficient boiler room equipment. Low energy efficiency and high gas costs. Limited automation and safety, risk of accidents. Insufficient capacity for stable heat supply to all consumers. Solution results: Reliable and safe heat supply to the community. Reduction of gas consumption and operating costs. Increased automation and process control. Compliance with modern technical and regulatory requirements.

Socio-economic context

Indicator

Value

Number of people who will use the service

500 human

Number of users from low-mobility population groups

150 human

Other social

300 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

District Heating

Stream

Restoration, modernization and development of centralized and decentralized heating systems

Strategic document

Task

2.2.8. Expanding the list, volumes and territories of utility services

Project objectives

Indicator
Base value
Target value

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
1
500 human
Economic justification

Alternative technical solutions

Technical Solution 1

Reconstruction of the gas supply system with replacement of heating boilers in the boiler room

Technical Solution 2

Construction of a new boiler house

Total costs10'930'933 UAH51'640'000 UAH
  • For preparation
  • 0 UAH1'000'000 UAH
  • For implementation
  • 10'640'933 UAH50'000'000 UAH
  • For operation
  • 290'000 UAH640'000 UAH
    Average annual costs290'000 UAH500'000 UAH
    Project duration, incl.4 months14 months
  • Deadline for developing a FFS
  • 1 month6 months
  • Implementation period
  • 3 months8 months
    Service life120 months600 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active
    Rejected
    Components of a technical solution
    To components
    0
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget10'930'933 UAH51'640'000 UAH
    Capital costs10'930'933 UAH51'640'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation0 UAH1'000'000 UAH
    For implementation10'640'933 UAH50'000'000 UAH
    For operation290'000 UAH640'000 UAH
    For closing0 UAH0 UAH

    Average project cost per service recipient

    Service UnitСередня вартість проєкту на одного отримувача
    Service Unit Cost21'281 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds10'640'933 UAH0 UAH
    Expected Funds10'640'933 UAH0 UAH
    Management Rationale

    Risk assessment

    Technical riskDefinedUndefined
    Financial riskDefinedUndefined
    Results of the feasibility analysis
    Economic Analysis
    Social benefits and costs
    Increasing the reliability of heat supply for the population and social facilities (schools, hospitals, kindergartens). Reducing the risk of emergencies, which improves the safety and comfort of residents. Creating additional jobs during the project implementation (construction and installation work).
    Environmental benefits and costs
    Reducing natural gas consumption through the installation of energy-efficient boilers. Reducing greenhouse gas emissions and harmful substances into the atmosphere. Minimizing negative impact on the environment through modern control and safety systems.
    Indirect benefits and costs
    Increasing the economic stability of the community by reducing energy costs. Supporting the development of local enterprises that supply equipment and services. Improving the investment climate through the modernization of critical infrastructure.