Overhaul of electrical networks/electrical panels (preparation of facilities for the heating season and energy saving measures) on co-financing terms in a residential building at 5 Pryrichna St. (units 1-11) in the Obolonskyi district of Kyiv


Sector
Housing
Stream
Впровадження проєктів з енергозбереження у житловому фонді
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Regional level of SP
Implementation
Completion

General information

Description of the project

The project is aimed at major repairs of electrical networks/electrical panels (preparation of facilities for the heating season and energy saving measures)  under co-financing  in a residential building at 5 Pryrichna St. (units 1-11) in the Obolonskyi district of Kyiv   to ensure proper and safe living conditions for residents of the apartment building.

The purpose of the project

Main Goal:

Introducing innovations and energy-efficient solutions

Secondary Goal:

Increasing compliance with modern standards

Description of the purpose of the project and ways to achieve it

The purpose of the project is to carry out major repairs of electrical networks/switchboards in order to increase the reliability and safety of electrical equipment. The project is aimed at repairing outdated electrical equipment in a residential building in order to increase the reliability of electricity supply. The project is implemented on the basis of co-financing: part of the costs is covered by the local budget, the rest by the co-owners of the apartment building.

Problems and solutions resulting from project implementation

The key problem is outdated and/or worn-out electrical equipment in an apartment building, which, if not resolved, may lead to increased emergency risks. Solution: major repairs of electrical networks/electrical panels of a residential building to increase the reliability of power supply, ensure electrical safety. The expected results of the project are increased quality and safety, improved living conditions for residents, and the creation of a comfortable environment. Additionally, the project will contribute to increasing the energy efficiency of the residential building.

Socio-economic context

Indicator

Value

Number of people who will use the service

700 human

Strategic Case

Strategic feasibility of the project

Sector

Housing

Subsector

Energy-efficient solutions for residential buildings

Stream

Впровадження проєктів з енергозбереження у житловому фонді

Strategic document

Стратегія розвитку територіальної громади

Task

2.3 Упровадження проєктів з енергозбереження в будівлях закладів бюджетної сфери та житловому фонді столиці

Project objectives

Project objectives were not specified by the initiator
Economic justification

Documents

Name
Date
summary estimate calculation.PDF
27.04.2026
09:41:50 UTC

Alternative technical solutions

Technical Solution 1

Overhaul of electrical networks/electrical panels (preparation of facilities for the heating season and energy saving measures) on co-financing terms in a residential building at 5 Pryrichna St. (units 1-11) in the Obolonskyi district of Kyiv

Technical Solution 2

Current repairs of electrical networks/electrical panels (preparation of facilities for the heating season and energy saving measures) on co-financing terms in a residential building at 5 Pryrichna St. (units 1-11) in the Obolonskyi district of Kyiv

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)6'241'000 UAH340'000 UAH
For preparation42'000 UAH40'000 UAH
For implementation6'199'000 UAH300'000 UAH
Project operation and closure cost0 UAH0 UAH
Average annual costs619'000 UAH0 UAH
Project duration, incl.8 months9 months
Deadline for developing a FFS2 months3 months
Implementation period6 months6 months
Service life120 months12 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Financial justification

Total project budget

Total preliminary budget6'241'000 UAH340'000 UAH
Project cost (preparation and implementation)6'241'000 UAH340'000 UAH
For preparation42'000 UAH40'000 UAH
For implementation6'199'000 UAH300'000 UAH
Project operation and closure cost0 UAH0 UAH
For operation0 UAH0 UAH
For closing0 UAH0 UAH

Average project cost per service recipient

Service UnitСередня вартість проєкту на одного отримувача
Service Unit Cost8'915 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH
Management Rationale

Risk assessment

Technical riskDefinedUndefined

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
01/05/2026SP-R-010526-3DBD7BDBRegional SPInvestment Feasibility StudyInclude--