Construction of a sewer collector on Ivan Franko Street in the city of Zbarazh


Sector
Municipal infrastructure and services
Stream
Development of social infrastructure and housing and utilities
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

The street sewer collector is designed to drain  domestic wastewater from private manor houses. The project was carried out in accordance with DBN V.2.5-75:2003 "Sewerage. External networks and structures", current GOSTs and other regulatory documents. Domestic wastewater from individual residential buildings on I. Franka Street in the city of Zbarazh is planned to be drained by the design sewer network into the existing city sewer collector, which crosses I. Franka Street in its lower part. The external networks of the domestic sewage network are designed from KORSIS ODP SN8 DSTU N B.V.2.5-40:2009 pipes, which will be laid in the ground at a depth according to the completed profile. The length of the sewer network is 1109 linear meters; the number of sewer wells is 64; the number of manor houses for domestic wastewater drainage by the design collector is  59; class  consequences SS2; estimated amount of domestic wastewater 23 cubic meters/day, 8280 cubic meters/year.

The purpose of the project

Main Goal:

Improving the equality of wealth distribution

Secondary Goal:

Increasing compliance with modern standards, Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

The purpose of the construction of the sewer collector is to ensure the effective collection, transportation and discharge of wastewater from Ivan Franko Street to the city's sewage treatment facilities, which in turn will allow protecting the environment by preventing pollution of soil, groundwater and the Hnizna River, reducing the risk of the spread of infectious diseases and improving the quality of life. This project involves the construction of a street main with a length of 1109 linear meters with periodic sewer wells in the amount of 64 units for collecting household wastewater from 59 private houses with subsequent connection to the existing city sewer collector. The estimated amount of household wastewater is 23 cubic meters per day, 8280 cubic meters per year. A feature of the project is that in order to avoid the destruction of the new asphalt coating, after laying new engineering networks, periodic branches of the sewer to the opposite side of the street are provided.

Problems and solutions resulting from project implementation

Problems: ingress of untreated wastewater into the soil and groundwater; spread of unpleasant odors; increased risk of infectious diseases; deterioration of living conditions of the population. Expected positive changes: organization of centralized and controlled wastewater disposal; elimination of the need to use cesspools; improvement of the sanitary and epidemiological condition of the territory.

Socio-economic context

Indicator

Value

Other functional

59 units

Capacity

23 m3

Other functional

1109 m

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Water supply and sanitation

Stream

Development of social infrastructure and housing and utilities

Strategic document

Стратегія розвитку територіальної громади

Task

1.2.4. Modernize and expand the water supply and wastewater network

Project objectives

Indicator
Base value
Target value
Number of houses for domestic wastewater collection by collector
0 units
59 units
Estimated amount of domestic wastewater per day
0 m3
23 m3

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Дані Збаразького МКП "Збараж"
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

No
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
236 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

The project will improve women's access to safe water, food, and medical services
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Expertise of Ivan Franko.pdf
26.12.2025
10:57:16 UTC

Alternative technical solutions

Technical Solution 1

Construction of a sewer collector

Technical Solution 2

Installation of local drainage systems

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)8'774'310 UAH6'550'000 UAH
For preparation543'546 UAH550'000 UAH
For implementation8'230'764 UAH6'000'000 UAH
Project operation and closure cost15'000'000 UAH1'200'000 UAH
For operation15'000'000 UAH1'200'000 UAH
Average annual costs300'000 UAH0 UAH
Project duration, incl.5 months5 months
Deadline for developing a FFS2 months3 months
Implementation period3 months2 months
Service life600 months180 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget23'774'310 UAH7'750'000 UAH
Project cost (preparation and implementation)8'774'310 UAH6'550'000 UAH
For preparation543'546 UAH550'000 UAH
For implementation8'230'764 UAH6'000'000 UAH
Project operation and closure cost15'000'000 UAH1'200'000 UAH
For operation15'000'000 UAH1'200'000 UAH
For closing0 UAH0 UAH
Чи була під час уточнення орієнтовного бюджету використана Методика розрахунку вартості публічного інвестиційного проєкту, затверджена наказом Міністерства фінансів України №316 від 23.06.2025 р.?
Yes
[Response was provided in the Investment Feasibility Study]
Чи була під час розрахунку орієнтовного бюджету використана Методика розрахунку вартості публічного інвестиційного проєкту, затверджена наказом Міністерства фінансів України №316 від 23.06.2025 р.?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Average project cost per service recipient

Service Unit На одного отримувача послуги
Service Unit Cost37'179 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
No – analysis not performed

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - communication with stakeholders

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - social and gender analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - legal support

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - working with international financial organizations (IFOs)

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - environmental expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Partially, we have limited experience

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Is there an understanding of where to find relevant experts and consultants?
Partially, we are considering options

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Financial riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
29/12/2025SP-L-291225-21E8D88ECommunity SPInvestment Feasibility StudyInclude--