"New construction of a civil defense facility (CDF) on the territory of the preschool educational institution "Olenka" of the Mayakivska village council at the address: Odesa region, Odessa district, Mayaki village, Osetyana st., 43 - A"
- Preparation
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
General information
Description of the project
The project involves the construction of a new underground civil defense structure (radiation shelter) on the territory of the “Olenka” preschool educational institution of the Mayakivska village council, which will allow solving the critical problem of the safety of children and staff in conditions of martial law and possible radiation threats. The implementation of this construction project will ensure the creation of a reliable monolithic reinforced concrete shelter of group P6 with a protection factor of 100, which is designed for the simultaneous stay of 330 people and is able to function autonomously thanks to its own life support systems. The planning solutions provide for the creation of comfortable conditions for a long stay, including a shelter hall with places to sit and lie down, a medical room, a room for storing food, bathrooms and technical rooms, while the reliability of operation is ensured by a mechanical ventilation system, tanks with a supply of drinking water for two days and a diesel power plant for emergency power supply. The project pays special attention to accessibility and inclusiveness, as a vertical lift, specialized bathrooms, wide doorways, and tactile navigation elements have been designed for access by people with reduced mobility, ensuring equal access to safety for all categories of citizens. The expected result of the project, which has an estimated operating life of 100 years, will be the commissioning of a modern protective structure of the CC2 impact class, which will allow for the restoration of a full-fledged educational process in the institution and ensure reliable protection of the community population.
The purpose of the project
Main goal:
Creation of new facilities and services
Secondary goal:
Increasing compliance with modern standards, Improving the equality of wealth distribution, Ensuring inclusiveness and equal opportunities, Introducing innovations and energy-efficient solutions
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of people who will use the service
330 human
Population in the geographical area of influence of the project
1500 human
Strategic Case
Strategic feasibility of the project
Sector
Education and science
Subsector
Preschool education
Stream
Arrangement of civil defense protective structures (shelters) in preschool educational institutions and ensuring their accessibility for all participants in the educational process
Strategic document
Task
3.1 Development of modern high-quality education in accordance with the concept of the New Ukrainian School
Project objectives
Alternative technical solutions
Technical Solution 1
New construction of a buried civil defense structure (radiation shelter) made of monolithic reinforced concrete.
Technical Solution 2
Construction of a quickly assembled modular reinforced concrete civil defense structure.
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]