Major renovation of part of the premises on the 2nd floor of the administrative building (letter "B") and the passage (letter "a-2") for the operating room and central sterilization department of the Kyiv City Clinical Hospital No. 4 at the address: 17 Solomianska St., Kyiv
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
- Summary
General information
Description of the project
Currently, the material and technical base of the operating block on the 2nd floor of the Administrative Building (letter "B") is morally and technically outdated and does not allow to provide modern surgical assistance to the population of Kyiv. The operating room and other rooms in the operating blocks require major repairs: in terms of decoration and internal engineering networks, the rooms also do not meet modern requirements for ventilation, air conditioning, and medical gas supply, the medical equipment in these rooms is outdated, worn out and requires constant repair and restoration.
Carrying out major repairs to part of the rooms on the 2nd floor of the Administrative Building (letter "B") for the operating block of the Kyiv City Clinical Hospital No. 4 with the arrangement of a modern central sterilization department and the purchase of new medical equipment will allow:
- to expand the possibilities of providing medical surgical assistance in the Kyiv City Clinical Hospital No. 4;
- create modern conditions for conducting surgical interventions using clean room technology;
- equip the operating room with modern new medical equipment;
- significantly increase the quantitative and qualitative capabilities of the Kyiv City Clinical Hospital No. 4 in terms of sterilization and disinfection of materials and equipment;
- increase the number of operations to help the population of Kyiv, Kyiv region and Ukraine as a whole.
The purpose of the project
Main Goal:
Increasing compliance with modern standards
Secondary Goal:
Improving the condition of infrastructure, Improving the quality of services, Meeting demand
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of people who will use the service
9.5 thous. people
Number of IDPs in the geographical area of impact of the project
433.2 thous. people
Population in the geographical area of influence of the project
3.6 mln people
Strategic Case
Strategic feasibility of the project
Sector
Healthcare
Subsector
Specialized medical care
Stream
Проведення капітальних ремонтів у закладах охорони здоров`я, що засновані на комунальній власності територіальної громади м. Києва
Strategic document
Стратегія розвитку територіальної громади
Task
2.1. Приведення комунальних закладів охорони здоров’я у відповідність до державних будівельних норм щодо інклюзивності та санітарно-гігієнічних норм, забезпечення їх дороговартісним високотехнологічним обладнанням для надання якісних медичних послуг
Project objectives
Project Sustainable Development Goals
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?
Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Were consultations held with representatives of target groups to take into account gender equality issues in the project?
Have the gender risks and social impacts of the project been assessed?
Are there management and institutional mechanisms in place to ensure gender equality?
Alternative technical solutions
Technical Solution 1
Major renovation of part of the premises on the 2nd floor of the Administrative Building (letter "B") and the passage (letter "a-2") under the operating block of the Kyiv City Clinical Hospital No. 4 with the arrangement of a modern central sterilization department and the purchase of new medical equipment
Technical Solution 2
Major renovation of part of the premises on the 2nd floor of the Administrative Building (letter "B") and the passage (letter "a-2") under the operating block of the Kyiv City Clinical Hospital No. 4 without purchasing new medical equipment
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]