Reconstruction of the intersection of Kossuth-Frank I. streets in Tyachiv with the construction of a roundabout


Sector
Transport Sector
Stream
Development and restoration of public road infrastructure
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The reconstruction of the intersection of Koshuta & Ivan Franko streets in Tyachiv involves the conversion of the existing traffic node into a modern roundabout in order to increase safety and capacity, reduce congestion and accidents. The project plans to: dismantle outdated elements of traffic organization and pavement, install a central island and a ring roadway, install safety islands and approaches at entrances/exits, renew the road surface, install curbstones, apply horizontal markings and install road signs. It is also planned to improve conditions for pedestrians (renewed sidewalks/crossings, lowering curbs), if necessary - transfer/protection of utility networks and upgrade lighting. The implementation of the project will ensure orderly traffic flow, reduce intersection travel time, increase comfort for residents and guests of the city, and generally improve transport accessibility in the surrounding area.

The purpose of the project

Main goal:

Increasing compliance with modern standards

Secondary goal:

Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

The main goal of the project is to increase the safety and efficiency of traffic at the intersection of Koshuta St. - Ivan Franka St. in Tyachiv by reconstructing the intersection with a roundabout, which will ensure: reducing the accident rate (especially side collisions and pedestrian strikes); reducing congestion and delays during peak hours and increasing the throughput capacity of the junction; calming the speed of traffic on the approaches to the intersection and reducing risks for vulnerable road users; improving conditions for pedestrians and groups with reduced mobility (safe crossings, lowering curbs, accessibility); streamlining the organization of traffic (logical trajectories, clear priorities, fewer conflict points); improving the comfort and quality of urban space (aesthetic solution, lighting, landscaping). Ways to achieve the goal (what exactly will be done) 1) Engineering and transport solution: arrangement of a roundabout Formation of a central island and a ring road with optimal radii. Organization of priority traffic on the ring (signs and markings). If necessary, geometric correction of access lanes (narrowing/widening, guide islands) to reduce speed and facilitate maneuvering. 2) Road safety Arrangement of safety islands on approaches to pedestrian crossings. Arrangement of pedestrian crossings in logical places with sufficient visibility (if necessary, lighting). Ensuring barrier-free access: lowering curbs, tactile elements (if necessary), convenient approaches. 3) Road surface and drainage Dismantling of existing deformed layers and arrangement of new road surface (base/leveling/finish layer). Arrangement of curbs and reinforcement of roadsides/adjacent areas. If necessary, arrangement of drainage (longitudinal/transverse slopes, trays, rain gutters) to prevent flooding and destruction of the coating. 4) Organization of road traffic (ODR) Installation of a set of road signs, including warning, priority and information signs. Application of horizontal markings: directional arrows, priority lines, “zebra”, stop lines. If necessary, installation of fences/guide posts, delineators, traffic calming elements. 5) Lighting and landscaping Renovation/modernization of street lighting in the ring area and crossings (with an emphasis on safety). Restoration of sidewalks, landscaping/arrangement of the central island (according to the project decision), cleaning and restoration of adjacent territories. 6) Engineering networks and related works Inspection and, if necessary, transfer/protection of communications (electricity, communications, water drainage, etc.). Coordination of technical solutions with network balance holders and services.

Problems and solutions resulting from project implementation

Congested city streets

Socio-economic context

Indicator

Value

Population in the geographical area of influence of the project

24000 human

Strategic Case

Strategic feasibility of the project

Sector

Transport Sector

Subsector

Road transport and road infrastructure

Stream

Development and restoration of public road infrastructure

Strategic document

Стратегія розвитку територіальної громади

Task

2.1 Construction and reconstruction of networks and roads and sidewalks on the territory of Tyachiv city AH

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

None of the options are applicable

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

None of the options are applicable

Does the project provide for improving women's access to services?

None of the options are applicable

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic analysis.docx
21.12.2025
10:09:10 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of the intersection of Kossuth-Frank I. streets in Tyachiv with the construction of a roundabout

Technical Solution 2

Reconstruction of the intersections of Kossuth-Frank I. streets in the city of Tyachiv

Total costs3'305'000 UAH1'650'000 UAH
  • For preparation
  • 120'000 UAH75'000 UAH
  • For implementation
  • 3'000'000 UAH1'500'000 UAH
  • For operation
  • 135'000 UAH50'000 UAH
  • For closing
  • 50'000 UAH25'000 UAH
    Average annual costs50'000 UAH50'000 UAH
    Project duration, incl.12 months8 months
  • Deadline for developing a FFS
  • 6 months3 months
  • Implementation period
  • 6 months5 months
    Service life600 months420 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    1
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Is the project of interest to small and medium-sized enterprises?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Will the project involve national or international suppliers and contractors?
    Yes, only national

    [Response was provided in the Preliminary Investment Feasibility Study]

    Has an analysis of available procurement options been conducted for the technical solution?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Financial justification

    Total project budget

    Total preliminary budget3'305'000 UAH1'650'000 UAH
    Capital costs3'305'000 UAH1'650'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation120'000 UAH75'000 UAH
    For implementation3'000'000 UAH1'500'000 UAH
    For operation135'000 UAH50'000 UAH
    For closing50'000 UAH25'000 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Preliminary Investment Feasibility Study]
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]

    Average project cost per service recipient

    Service UnitСередня вартість на одного мешканця
    Service Unit Cost125 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    The project does not fall under the PPP format by its nature/character

    [Response was provided in the Preliminary Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

    None of the options are applicable

    Project Approval History

    DateDecision NumberPortfolioProject StatusDecisionReasons
    21/12/2025SP-L-211225-C33689F0Community SPInvestment Feasibility StudyInclude-