Major repairs of the storage facility of the KNP "City Hospital No. 2" in Kramatorsk


Sector
Healthcare
Stream
Creating comfortable and safe conditions in healthcare facilities
Maturity level
86
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The facility to be overhauled is a civil defense protective structure - a storage facility (registration number - No. 18225), separately located, underground type, designed for 80 people. Storage class - A-III. It has damage to the load-bearing and enclosing structures, defects in decoration due to prolonged operation and is not adapted for access by MGN. The storage facility has only one evacuation exit to the outside. The developed individual working project contains traditional construction solutions taking into account the requirements of regulatory documents, conditions and rules. The project provides for the repair of the storage facilities, overhaul of internal engineering networks, replacement of doors, arrangement of a second evacuation exit from the storage facility and installation of a lifting platform for servicing MGN, installation of a diesel generator as a second power source. The implementation of this project will ensure the continuity of the medical facility's operation and protection for both patients and personnel in emergency situations.

The purpose of the project

Main Goal:

Increasing compliance with modern standards

Secondary Goal:

Increasing compliance with modern standards, Improving the condition of infrastructure, Improving the quality of services

Description of the purpose of the project and ways to achieve it

The goal is to help the hospital ensure continuity of medical services even in conditions of risk of damage to buildings, supply disruptions and a sharp increase in the number of patients. Provide protection for both patients and medical staff. The construction period is 6 months. Compliance with DBN V.2.2-5:2023 "Civil defense protective structures" - 100%.

Problems and solutions resulting from project implementation

Despite the ongoing war, Ukrainian hospitals continue to adapt, and an underground shelter in a medical facility will provide protection for both patients and staff. For effective functioning and bringing it into line with modern needs, a major overhaul is necessary, which will include direct repair of the premises, installation of protective and airtight doors, arrangement of new structures of the second entrance with a vestibule with the installation of a lifting platform for servicing the MGN, as well as the installation of a diesel generator as a second power source.

Socio-economic context

Indicator

Value

Number of people who will use the service

80 units

Strategic Case

Strategic feasibility of the project

Sector

Healthcare

Subsector

Specialized medical care

Stream

Creating comfortable and safe conditions in healthcare facilities

Strategic document

Регіональна стратегія розвитку

Task

3.1.1 . Increasing the region's ability to prevent, respond to, and mitigate the consequences of emergencies

Project objectives

Indicator
Base value
Target value
Number of people who will use the storage
0 units
80 units

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Нагальна потреба в ремонті сховища та приведенні його у відповідність до національних і міжнародних стандартів у період військового стану
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

No
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
80 units
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

None of the options are applicable

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]
The project will improve women's access to safe water, food, and medical services
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
305_KD_ZKR.pdf
02.12.2025
18:50:39 UTC

Alternative technical solutions

Technical Solution 1

Overhaul of the storage

Technical Solution 2

New construction of a civil defense facility with PRU properties

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)18'216'578 UAH0 UAH
For preparation329'671 UAH0
For implementation17'886'907 UAH0
Project operation and closure cost20'000 UAH0 UAH
For operation10'000 UAH0
For closing10'000 UAH0
Average annual costs10'000 UAH0 UAH
Project duration, incl.8 months0 months
Deadline for developing a FFS2 months0 months
Implementation period6 months0 months
Service life240 months0 months
Target indicatorsDefined Not defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Pending

[The project initiator has not taken any decision about this alternative technical approach.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget18'236'578 UAH0 UAH
Project cost (preparation and implementation)18'216'578 UAH0 UAH
For preparation329'671 UAH0 UAH
For implementation17'886'907 UAH0 UAH
Project operation and closure cost20'000 UAH0 UAH
For operation10'000 UAH0 UAH
For closing10'000 UAH0 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service Unitсередня вартість на одного отримувача
Service Unit Cost227'707 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
04/12/2025SP-L-041225-3F8238C6Community SPInvestment Feasibility StudyInclude--
15/12/2025SPP-L-151225-0051009ACommunity SPPInvestment Feasibility StudyInclude-86