General information
Description of the project
In 2021, in cooperation with consultants from the European Bank for Reconstruction and Development, a feasibility study was developed for the recommended option for a solid waste processing complex in the city. The General Plan of the city of Kryvyi Rih provides for the facility ’New construction of a complex for the processing, neutralization and storage of solid waste in the Metallurgical district of the city of Kryvyi Rih, Dnipropetrovsk region» on two sites with an area of 23.9141 hectares and 21.8325 hectares. In 2024, the development of the project «New construction of a complex for the processing, neutralization and storage of domestic waste in the Metallurgical district of the city of Kryvyi Rih, Dnipropetrovsk region» was launched, ensuring compliance with the requirements of the Law of Ukraine «On Environmental Impact Assessment». The project envisages the construction of a solid waste processing complex with a waste sorting line, during the operation of which it is planned to extract the organic component of household waste for the subsequent production of compost, resource-valuable waste, in particular secondary raw materials, and the production of an alternative type of fuel (RDF-fuel). The sequence of construction of the complex will be carried out in three stages. According to the task for the design of the feasibility study stage - the following is envisaged: Stage I - a line for manual and mechanical sorting of mixed MSW; all necessary buildings and structures for the operation of the complex; maps for storing "residues" of MSW after sorting and processing with an area of 12.1 hectares; connection of the complex to engineering networks; improvement of the territory (fence, driveways, platforms, landscaping). Stage II - composting plant for green waste and biomass waste; auxiliary structures and buildings for the operation of the composting plant; maps for storing «residues» of MSW after sorting and processing. Stage III – RDF fuel production line for the utilization of specific high-calorie fraction; auxiliary facilities and buildings for the operation of this line.01.21.2025 The Ministry of Environmental Protection and Natural Resources of Ukraine issued an environmental impact assessment conclusion under No. 21/01-9126/1 on the admissibility of the planned activity «New construction of a complex for the processing, neutralization and storage of solid household waste in the Metallurgical District of the city of Kryvyi Rih, Dnipropetrovsk region».
The purpose of the project
Main Goal:
Contribution to climate or environmental goals
Secondary Goal:
Creation of new facilities and services
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Other economic
250000 t
Number of people who will use the service
600 thous. people
Number of jobs, including for IDPs
199 human
Population in the geographical area of influence of the project
600 thous. people
Strategic Case
Strategic feasibility of the project
Sector
Municipal infrastructure and services
Subsector
Household waste management
Stream
Development of a system for the collection, transportation, recovery and disposal of household waste
Strategic document
Стратегія розвитку територіальної громади
Task
2.3.1. Development of household waste management infrastructure facilities
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?
Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Were consultations held with representatives of target groups to take into account gender equality issues in the project?
Have the gender risks and social impacts of the project been assessed?
Are there management and institutional mechanisms in place to ensure gender equality?
Alternative technical solutions
Technical Solution 1
New construction of a complex for the processing, disposal and storage of solid household waste in the Metallurgical District of Kryvyi Rih, Dnipropetrovsk region
Technical Solution 2
Energy use of household waste (incineration or anaerobic fermentation) to produce thermal or electrical energy.
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Risk assessment
Organizational events
Team involvement
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]