Construction of the Heroes' Stele in Storozhynets, Chernivtsi region (correction)


Sector
Social sector
Stream
Creating public spaces of diverse orientation
Maturity level
83
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The purpose of the project is to create a modern memorial space to honor the memory of the residents of the Storozhynets urban territorial community who died defending the independence, sovereignty and territorial integrity of Ukraine during the armed aggression of the Russian Federation.

The project involves the construction of a new memorial structure – «Stele of Heroes» in the city of Storozhynets, Chernivtsi district, Chernivtsi region. The project is aimed at creating a specially equipped place to honor the memory of the defenders within the city's recreational zone without demolishing existing buildings or communications.

Project objectives:

• Installation of a reinforced foundation slab to ensure the stability of the structure.

• Installation of a memorial stele (monument) made of natural granite stone.

• Execution of external decoration of the structure with granite slabs.

• Ensuring safe operation and inclusiveness of the facility (accessibility for people with reduced mobility).

• Carrying out work on the improvement of the surrounding area.

Expected results:

• Creation of a new architectural memorial object with a total built-up area of 69.6 m² and a maximum height of 2.45 m and completion of the compositional and architectural component.

• Arrangement of a public space for holding ceremonial events and commemorating the Heroes, which is important for the socio-patriotic context of the community.

• Improving the recreation infrastructure where the facility is located, in accordance with modern construction standards.

The purpose of the project

Main Goal:

Creation of new facilities and services

Secondary Goal:

Improving the equality of wealth distribution, Improving the condition of infrastructure, Reducing territorial or social gaps

Description of the purpose of the project and ways to achieve it

1. The purpose of the project is to create a full-fledged memorial space in the city of Storozhynets — the Heroes' Stele — as a symbol of gratitude and respect for the fallen defenders of Ukraine, residents of the community, as well as the formation of a permanent place for holding official commemorative events. The project is aimed at achieving the following target results: • ensuring a proper and orderly place to honor the memory of the Heroes of the community; • preserving historical memory and forming national consciousness; • creating a modern, aesthetically attractive and accessible public space; • integrating the memorial object into the urban environment, taking into account the principles of barrier-free access. ________________________________________ 2. Methods of achieving the goal. To implement the goal of the project, it is planned: • adjusting the design and estimate documentation in accordance with current building codes and resource costs; • performing construction and installation work on the erection of the stele and memorial structures; • installation of memorial plaques with the names of the fallen defenders; • improvement of the surrounding area (paving, lighting, landscaping, installation of small architectural forms); • ensuring barrier-free access to the object; • creating conditions for holding mass commemorative and ceremonial events. To achieve the specified goals, the third part of the project provides for: • Implementation of works at the "Draft Design" (DDS) stage, taking into account the adjustment of the design and estimate documentation, which will ensure the relevance of technical and cost indicators and the possibility of performing work in 2026. • Performance of construction and installation works, in particular: o installation of a reinforced foundation slab to ensure the reliability and durability of the structure; o manufacture and installation of stele elements made of natural granite; o facing surfaces with granite slabs. • Landscaping of the area around the facility (building area — 69.6 m²), including the organization of coverage and engineering solutions for surface water drainage. • Ensuring barrier-free and safety, in accordance with current state building codes. • Minimizing the impact on the existing environment, since the work is carried out without demolishing existing structures and engineering networks, which allows preserving the ecosystem of the park area. 3. Justification of the gap between the current state and the target level - Current state (“as is”): The memorial space in the specified location has been partially implemented within the framework of previous construction phases. However, the complex is not architecturally completed, which limits its functionality and does not allow fully meeting the community's need for systematic and large-scale commemoration of the fallen defenders. - Target state ("as it should be"): Creation of a completed memorial complex, which will become a compositionally coherent, functionally equipped center for commemorating the Heroes in the city. - Justification of the gap: The gap is not in the complete absence of memorial infrastructure, but in its incompleteness. The unimplemented third part of the project does not allow achieving the intended architectural, social and functional characteristics of the object. The implementation of the project will eliminate this infrastructure deficit, providing the community with a completed, safe, inclusive and aesthetically designed memorial space

Problems and solutions resulting from project implementation

Socio-economic context

Indicator

Value

Number of IDP users

1126 human

Number of users from low-mobility population groups

10580 human

Population in the geographical area of influence of the project

40682 human

Strategic Case

Strategic feasibility of the project

Sector

Social sector

Subsector

Veterans

Stream

Creating public spaces of diverse orientation

Strategic document

Стратегія розвитку територіальної громади

Task

3.5.1. Creation of public spaces of diverse orientation.

Project objectives

Indicator
Base value
Target value
The level of provision of the community with an equipped memorial space for holding patriotic events.
30 %
90 %
Ensuring barrier-free access to the facility for people with limited mobility
20 %
100 %
The projected service life of the structure without the need for major repairs.
0 year
30 year
The area of the landscaped territory of the recreational zone with architectural completion.
0 m2
69.6 m2

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

None of the options are applicable

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic analysis of preliminary technical solutions according to the selected methodology.pdf
20.02.2026
13:12:26 UTC

Alternative technical solutions

Technical Solution 1

Construction of the Heroes' Stele in Storozhynets, Chernivtsi region (correction)

Technical Solution 2

Preservation of the "Heroes' Stele" memorial complex in its current state without completing the construction of the third part

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)2'981'754 UAH0 UAH
For preparation85'692 UAH0 UAH
For implementation2'896'062 UAH0 UAH
Project operation and closure cost0 UAH20'000 UAH
For operation0 UAH20'000 UAH
Average annual costs30'000 UAH0 UAH
Project duration, incl.4 months2 months
Deadline for developing a FFS1 month1 month
Implementation period3 months1 month
Service life360 months360 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget2'981'754 UAH20'000 UAH
Project cost (preparation and implementation)2'981'754 UAH0 UAH
For preparation85'692 UAH0 UAH
For implementation2'896'062 UAH0 UAH
Project operation and closure cost0 UAH20'000 UAH
For operation0 UAH20'000 UAH
For closing0 UAH0 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service Unit• На одного отримувача послуги (мешканця громади): При кількості мешканців 40 682 осіб, середня вартість інвестиції на одного жителя складає: 2 981 754 грн / 40 682 осіб ≈ 73,29 грн/особу. • На одиницю продукції (площа забудови): При площі забудови 69,6 м², середня вартість створення 1 м² впорядкованого меморіального простору складає: 2 981 754 грн / 69,6 м² ≈ 42 841,30 грн/м².
Service Unit Cost73 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds1'486'697 UAH0 UAH
Expected Funds1'486'697 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - communication with stakeholders

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - social and gender analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - legal support

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - working with international financial organizations (IFOs)

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - environmental expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Yes, successfully implemented 1 or more similar projects

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
None of the options are applicable
Is there an understanding of where to find relevant experts and consultants?
Yes, negotiations are already underway.

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Financial riskDefinedUndefined
Operational riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
20/02/2026SP-L-200226-EA299437Community SPInvestment Feasibility StudyIncludeThe project aims to achieve strategic goals and have a positive impact on the social climate of the community.-
24/02/2026SPP-L-240226-953DD000Community SPPInvestment Feasibility StudyInclude-83