Reconstruction of the dormitory at 7a Chornovola St., Novy Rozdil, Stryi district, Lviv region for the arrangement of housing stock intended for temporary residence of internally displaced persons


Sector
Municipal infrastructure and services
Stream
Improving energy efficiency in public buildings
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project involves the reconstruction of a dormitory at the address: Chornovola St., 7a, Novy Rozdil, Stryi district, Lviv region, in order to create a housing fund for temporary residence of internally displaced persons (IDPs). Due to martial law, as of 01.01.2026, 1988 IDPs live in the Novy Rozdil territorial community, which necessitates the need to provide them with affordable and adequate housing. The project involves the reconstruction of a building with a total area of 2119.2 sq. m with the implementation of a complex of construction works, including: replacement of the roof; replacement of windows and doors; modernization of engineering networks (electricity, water supply and sewage); renovation of the heating system (installation of new radiators); redevelopment of premises to ensure comfortable living; arrangement of barrier-free access for low-mobility groups. The implementation of the project will allow creating proper housing conditions for IDPs, increasing the level of social protection of the community population, and effectively using the existing housing stock. The expected result is to provide internally displaced persons with safe, comfortable and energy-efficient housing, which will contribute to their social adaptation and integration into the community.

The purpose of the project

Main Goal:

Improving the equality of wealth distribution

Secondary Goal:

Increasing compliance with modern standards, Improving the condition of infrastructure, Ensuring inclusiveness and equal opportunities, Improving the quality of services, Meeting demand

Description of the purpose of the project and ways to achieve it

The goal of the project is to expand access to housing for internally displaced persons by reconstructing a dormitory in the city of Novy Rozdil and creating a safe, comfortable, energy-efficient and accessible (inclusive) environment for temporary residence. Methods of achieving the goal: conducting a comprehensive reconstruction of the building with a total area of 2119.2 sq. m; replacing the roof, windows and doors to increase energy efficiency; upgrading engineering networks (electricity, water supply, sewage); updating the heating system with the installation of modern radiators; replanning of internal premises to form residential blocks suitable for families; providing barrier-free access for low-mobility groups; bringing the building into compliance with current construction, sanitary and energy standards. Justification of the gap between the current state and the target level: As of today, 1988 internally displaced persons live in the Novorozdil territorial community, while the existing housing stock does not fully provide them with adequate living conditions. A significant part of IDPs is forced to live in temporary or adapted premises that do not meet basic standards of comfort, safety and accessibility. The dormitory building, which is planned for reconstruction, is currently in a technically outdated condition, has worn-out structures and engineering networks, does not meet modern energy efficiency requirements and does not provide barrier-free access. This limits the possibility of its use as a full-fledged residential facility. The target state is to create a functional housing facility that meets modern standards and provides adequate living conditions for IDPs, including energy efficiency, safety, and inclusiveness, which will significantly reduce the housing shortage in the community and increase the level of social protection for the population.

Problems and solutions resulting from project implementation

The main problem is the insufficient provision of housing for internally displaced persons in the Novorozdil territorial community. As of 01.01.2026, 1988 IDPs live in the community, while the existing housing stock does not cover the existing need. An additional problem is the unsatisfactory technical condition of the dormitory building, which has significant physical wear and tear of structures and outdated engineering networks, which makes it impossible to use it for comfortable and safe living. The facility does not meet modern construction, sanitary and energy-efficient requirements, and does not provide barrier-free access. The relevance of the project is due to the ongoing martial law and the preservation of a significant number of IDPs who need proper housing conditions. The lack of affordable housing negatively affects the social stability of the community and the standard of living of displaced persons. If these problems are not resolved, the following consequences are possible: further increase in the housing shortage for IDPs; people living in inadequate or temporary conditions; increased social tension in the community; deterioration of the technical condition of the building and increased costs for its restoration in the future. The implementation of the project will allow: to create additional housing stock for IDPs; to provide safe, comfortable and energy-efficient living conditions; to introduce a barrier-free environment; to increase the level of social protection of the population; to improve the condition of communal infrastructure and the efficiency of building use.

Socio-economic context

Indicator

Value

Number of IDPs in the geographical area of impact of the project

1988 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Urban planning and landscaping

Stream

Improving energy efficiency in public buildings

Strategic document

Стратегія розвитку територіальної громади

Task

2.2.2. Carry out comprehensive energy modernization of municipal institutions

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Для визначення потреби у житлі для ВПО застосовувався статистично-аналітичний метод, який передбачає збір та аналіз актуальної статистичної інформації щодо чисельності внутрішньо переміщених осіб у громаді та їх потреб у житлі.
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
150 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
economic justification.pdf
23.03.2026
14:07:26 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of the dormitory at 7a Chornovola St., Novy Rozdil, Stryi district, Lviv region for the arrangement of housing stock intended for temporary residence of internally displaced persons

Technical Solution 2

Construction of a residential building for temporary residence of internally displaced persons in the town of Novy Rozdil, Stryi district, Lviv region

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)49'550'000 UAH203'000'000 UAH
For preparation1'550'000 UAH3'000'000 UAH
For implementation48'000'000 UAH200'000'000 UAH
Project operation and closure cost0 UAH0 UAH
Average annual costs200'000 UAH0 UAH
Project duration, incl.28 months72 months
Deadline for developing a FFS4 months12 months
Implementation period24 months60 months
Service life480 months600 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget49'550'000 UAH203'000'000 UAH
Project cost (preparation and implementation)49'550'000 UAH203'000'000 UAH
For preparation1'550'000 UAH3'000'000 UAH
For implementation48'000'000 UAH200'000'000 UAH
Project operation and closure cost0 UAH0 UAH
For operation0 UAH0 UAH
For closing0 UAH0 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitСередня вартість проєкту на одного отримувача послуги
Service Unit Cost330'333 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - communication with stakeholders

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - social and gender analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - legal support

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - environmental expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Yes, successfully implemented 1 or more similar projects

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Is there an understanding of where to find relevant experts and consultants?
Yes, negotiations are already underway.

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Financial riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
25/03/2026SP-L-250326-C185FDB4Community SPInvestment Feasibility StudyInclude--
31/03/2026SPP-L-310326-03D2E5DDCommunity SPPInvestment Feasibility StudyInclude--