Reconstruction of Mykhailo Hrushevsky St. from Akademika Koroleva St. to Odeska St. in Cherkasy


Sector
Transport Sector
Stream
Development and restoration of road infrastructure
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

The purpose of the project

Main goal:

Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

The improvement of the city's infrastructure, namely Mykhailo Hrushevsky Street on the section from Akademika Koroleva Street to Odeska Street, will be carried out through its reconstruction. The reconstruction is planned to be carried out within the red lines from the intersection with Akademika Koroleva Street to the intersection with Odeska Street.

Problems and solutions resulting from project implementation

The existing technical condition of the road surface of Mykhailo Hrushevskoho Street does not meet traffic requirements, has holes and potholes, traffic organization and accessibility measures for low-mobility groups of the population do not meet modern requirements. For the implementation of the project, it is planned to reconstruct the street, providing for the following street parameters: - Number of lanes of the road surface - 4 (2 in each direction); - Arrangement of a capital type of coating and road surface construction in accordance with the requirements of DBN V.2.3-5:2018; - arrangement of a sidewalk covering from paving slabs; - arrangement of a bicycle path with a width in accordance with DBN V.2.3-5:2018 with amendments "Streets and roads of settlements"; - Provision of markings for the road surface and bicycle paths with durable materials (thermoplastic, cold plastic etc.); - a roundabout at the intersection of Prikordonnyka Lazarenko Street and Heroes of Maidan - Design the outdoor lighting system using energy-saving technologies. - Arrange drainage from the roadway, sidewalks and bike paths. After the reconstruction, Prikordonyka Lazarenka Street in the section from Sumgaitska Street to Heroes of Maidan Street will meet the specified purpose.

Socio-economic context

Indicator

Value

Other functional

0.67 km

Strategic Case

Strategic feasibility of the project

Sector

Transport Sector

Subsector

Road transport and road infrastructure

Stream

Development and restoration of road infrastructure

Strategic document

Стратегія розвитку територіальної громади

Task

DEVELOPMENT AND MODERNIZATION OF URBAN INFRASTRUCTURE

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Аналіз пропускної здатності вулично-дорожньої мережі
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

No
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
200000 vehicles
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Preliminary Investment Feasibility Study]
Protecting and restoring biodiversity and ecosystems
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

None of the options are applicable

Does the project provide for improving women's access to services?

The project will improve women's access to education (primary, secondary, vocational)
[Response was provided in the Preliminary Investment Feasibility Study]
The project will create jobs available to women (temporarily or permanently)
[Response was provided in the Preliminary Investment Feasibility Study]
The project will improve women's access to safe water, food, and medical services
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Project Agreement.pdf
18.02.2026
13:34:21 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of Mykhailo Hrushevsky St. from Akademika Koroleva St. to Odeska St. in Cherkasy

Technical Solution 2

Reconstruction of Mykhailo Hrushevskoho St.

Total costs43'850'002 UAH52'400'000 UAH
  • For preparation
  • 1'562'959 UAH2'000'000 UAH
  • For implementation
  • 42'287'041 UAH50'000'000 UAH
  • For operation
  • 1 UAH200'000 UAH
  • For closing
  • 1 UAH200'000 UAH
    Average annual costs1 UAH1 UAH
    Project duration, incl.24 months36 months
  • Deadline for developing a FFS
  • 12 months12 months
  • Implementation period
  • 12 months24 months
    Service life144 months120 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    1
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Is the project of interest to small and medium-sized enterprises?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Will the project involve national or international suppliers and contractors?
    Yes, both national and international

    [Response was provided in the Preliminary Investment Feasibility Study]

    Has an analysis of available procurement options been conducted for the technical solution?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Financial justification

    Total project budget

    Total preliminary budget43'850'002 UAH52'400'000 UAH
    Capital costs43'850'002 UAH52'400'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation1'562'959 UAH2'000'000 UAH
    For implementation42'287'041 UAH50'000'000 UAH
    For operation1 UAH200'000 UAH
    For closing1 UAH200'000 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Preliminary Investment Feasibility Study]
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]

    Average project cost per service recipient

    Service Unitне застосовується
    Service Unit Cost1 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    The project does not fall under the PPP format by its nature/character

    [Response was provided in the Preliminary Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Management Rationale

    Team competencies

    Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
    Strategic justification - analysis of the strategic feasibility of the project

    [Response was provided in the Preliminary Investment Feasibility Study]

    Economic justification - economic analysis

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project management - risk management

    [Response was provided in the Preliminary Investment Feasibility Study]

    Business case - analysis of available procurement options

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project management - legal support

    [Response was provided in the Preliminary Investment Feasibility Study]

    Financial analysis - financial analysis

    [Response was provided in the Preliminary Investment Feasibility Study]

    Does the team have experience implementing similar projects?
    Yes, successfully implemented 1 or more similar projects

    [Response was provided in the Preliminary Investment Feasibility Study]

    Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
    None of the options are applicable
    Is there an understanding of where to find relevant experts and consultants?
    Partially, we are considering options

    [Response was provided in the Preliminary Investment Feasibility Study]

    Risk assessment

    Financial riskDefinedUndefined
    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

    Finalization of existing documentation for the preparation of a preliminary feasibility study
    [Response was provided in the Investment Feasibility Study]

    Project Approval History

    DateDecision NumberPortfolioProject StatusDecisionReasons
    19/02/2026SP-L-190226-F3112559Community SPInvestment Feasibility StudyInclude-
    02/03/2026SPP-L-020326-9120C6F6Community SPPInvestment Feasibility StudyInclude-