Emergency repair work (overhaul) of an apartment building at the address: Kharkiv city, Dvadtsyat Tretyego Serpnya street, 51
- Preparation
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
General information
Description of the project
The apartment building at 51 Dvadtsyat Tretyego Serpnya Street, which suffered significant damage as a result of military operations and is subject to major repairs, is located in the Shevchenkivskyi administrative district. As a result of the shelling, the apartment building suffered significant damage and destruction, namely: partial destruction of the integrity of vertical load-bearing elements, partitions, covering and parapet structures, damaged sections of the roof, filling of window and door openings, balconies, stairs, and decoration of facades.
The project provides for the restoration of destroyed walls and ceilings at the technical floor level, roof repair, repair and painting of facades, replacement of windows and doors within the MZK, repair of stairwells and corridors, replacement of glazing of loggias and damaged windows. Planning solutions remain unchanged. In terms of construction, the destroyed walls of the technical floor and ventilation shafts made of silicate bricks are to be restored. Also, damaged ceilings are being repaired by installing monolithic reinforced concrete slabs on metal rolled beams. The ceiling is being restored in the destroyed areas of the elevator room and the adjacent span.
The purpose of the project
Main goal:
Rebuilding the damaged/destroyed
Secondary goal:
Increasing compliance with modern standards, Improving the condition of infrastructure, Improving the quality of services, Reducing territorial or social gaps
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Other functional
1901.6 m2
Number of people who will use the service
151 human
Other functional
7889.4 m2
Population in the geographical area of influence of the project
1.3 mln people
Number of IDPs in the geographical area of impact of the project
212 thous. people
Strategic Case
Strategic feasibility of the project
Sector
Housing
Subsector
Housing Reconstruction
Stream
Restoration of apartment buildings damaged as a result of the armed aggression of the Russian Federation
Strategic document
State Strategy for Regional Development for 2021–2027
Task
Operational objective 1. Ensuring integrated development of territories taking into account the interests of future generations. Point 2 Implementation of priority measures for life safety, restoration and stimulation of economic activity in territorial communities classified as recovery areas.
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
Emergency repair work (overhaul) of an apartment building at the address: Kharkiv city, Dvadtsyat Tretyego Serpnya street, 51
Technical Solution 2
Emergency repair work (overhaul) of an apartment building at the address: Kharkiv city, Dvadtsyat Tretyego Serpnya street, 51 with the integration of renewable energy sources
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Financial justification
Total project budget
Preliminary cost breakdown
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]