Major repairs to equip the fire protection system in the Shchyretsky Lyceum named after Hero of Ukraine Bohdan Ilkiv of the Shchyretsky Village Council of the Lviv District of the Lviv Region. Corrections


Sector
Education and science
Stream
Providing safe conditions in institutions providing general secondary education (fire protection)
Maturity level
83
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project involves major repairs with adjustments to the fire protection system at the Shchyretsky Lyceum named after Hero of Ukraine Bohdan Ilkiv of the Shchyretsky Settlement Council of the Lviv District of the Lviv Region. The goal is to ensure an adequate level of fire safety in the educational institution by installing a modern fire alarm system, notification and evacuation management, as well as performing the necessary construction and installation work in accordance with current regulatory requirements. The implementation of the project will contribute to the protection of the life and health of students and employees, the creation of safe learning conditions and the compliance of the lyceum with state standards in the field of civil protection.

The purpose of the project

Main Goal:

Increasing compliance with modern standards

Secondary Goal:

Increasing compliance with modern standards, Introducing innovations and energy-efficient solutions

Description of the purpose of the project and ways to achieve it

The purpose of the project is: -ensuring a reliable level of fire safety in an educational institution; -creating safe learning and working conditions for students and employees of the lyceum; -installing a modern fire alarm, notification and evacuation management system in accordance with current regulatory requirements; -increasing the level of readiness of the institution for emergencies and minimizing risks to life and health; -bringing the lyceum infrastructure into line with state standards of civil protection and fire safety. The following main methods are envisaged to implement the goal: -development and adjustment of project documentation in accordance with current regulatory requirements in the field of fire safety; -purchase and installation of modern equipment: fire alarm, notification and evacuation management systems; -installation and configuration of cable networks and power supply necessary for the system to function; -carrying out construction and installation works to integrate the system into the lyceum premises; -testing and commissioning the system, checking its performance and compliance with technical requirements; -training the lyceum staff on the rules for using the system and actions in the event of a fire hazard; -providing technical maintenance and regular inspections after completion of work to maintain the system in good condition.

Problems and solutions resulting from project implementation

The main problems that exist in the institution: -lack of a modern fire protection system; -insufficient level of safety of students and employees in the event of a fire hazard; -non-compliance of the lyceum building with current regulatory requirements in the field of fire safety; -high risks to life and health of people due to untimely detection and notification of a fire; -limited opportunities for organized and rapid evacuation. Results of the solution after project implementation: -installation and commissioning of a modern fire alarm and notification system; -ensuring timely detection of the threat and prompt notification of a fire; -creation of conditions for organized evacuation of students and employees; -bringing the lyceum building to compliance with state fire safety standards; -significant reduction in the risks of emergency situations and minimization of their consequences; -increasing the level of community trust in the safety of the educational institution.

Socio-economic context

Indicator

Value

Number of IDP users

8 human

Number of people who will use the service

723 human

Population in the geographical area of influence of the project

5289 human

Strategic Case

Strategic feasibility of the project

Sector

Education and science

Subsector

School education

Stream

Providing safe conditions in institutions providing general secondary education (fire protection)

Strategic document

Стратегія розвитку територіальної громади

Task

2.3.3 Strengthening public safety, prevention and protection from emergencies

Project objectives

Indicator
Base value
Target value
Number of rooms equipped with alarm system
0 %
100 %
Number of properly marked emergency exits
2 units
8 units

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

При оцінці попиту на проєкт застосовується комплексний підхід:вивчення чинних державних стандартів та правил пожежної безпеки,визначення кількості необхідних датчиків, оповіщувачів та евакуаційних виходів, аналіз ризиків для учнів та персоналу у разі пожежної небезпеки,розрахунок вартості обладнання та монтажних робіт
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
723 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Calculation_of_costs_of_capital_repair_of_fire_alarm.xlsx
17.12.2025
16:05:02 UTC

Alternative technical solutions

Technical Solution 1

Major repairs to equip the fire protection system in the Shchyretsky Lyceum named after Hero of Ukraine Bohdan Ilkiv of the Shchyretsky Village Council of the Lviv District of the Lviv Region. Corrections

Technical Solution 2

Modernization of the fire safety system using innovative energy efficiency and accessibility technologies

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)4'758'199 UAH6'600'000 UAH
For preparation200'000 UAH600'000 UAH
For implementation4'558'199 UAH6'000'000 UAH
Project operation and closure cost280'000 UAH600'000 UAH
For operation180'000 UAH480'000 UAH
For closing100'000 UAH120'000 UAH
Average annual costs180'000 UAH0 UAH
Project duration, incl.12 months14 months
Deadline for developing a FFS1 month2 months
Implementation period11 months12 months
Service life120 months180 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget5'038'199 UAH7'200'000 UAH
Project cost (preparation and implementation)4'758'199 UAH6'600'000 UAH
For preparation200'000 UAH600'000 UAH
For implementation4'558'199 UAH6'000'000 UAH
Project operation and closure cost280'000 UAH600'000 UAH
For operation180'000 UAH480'000 UAH
For closing100'000 UAH120'000 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service Unitсередня вартість на одного отримувача послуг
Service Unit Cost5'627 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds75'000 UAH0 UAH
Expected Funds75'000 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - communication with stakeholders

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Yes, successfully implemented 1 or more similar projects

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - environmental expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Management justification - legal support

[Response was provided in the Preliminary Investment Feasibility Study]

Is there an understanding of where to find relevant experts and consultants?
Partially, we are considering options

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Financial riskDefinedUndefined

Team involvement

How exactly are/will stakeholders be involved?
Meetings with local authorities

[Response was provided in the Investment Feasibility Study]

When are/will engagement activities be taking place?
At the project monitoring stage

[Response was provided in the Investment Feasibility Study]

At the project implementation stage

[Response was provided in the Investment Feasibility Study]

At the project preparation stage

[Response was provided in the Investment Feasibility Study]

How is/will the public be informed about the importance of participation and available channels for feedback?
In another way

[Response was provided in the Investment Feasibility Study]

на сайті Щирецької селищної ради
Local media

[Response was provided in the Investment Feasibility Study]

Are public hearings being held/will they be held (offline, online)?
Public hearings are not planned.

[Response was provided in the Investment Feasibility Study]

громадські слухання не передбачені
Who will attend the public hearings?
None of the options are applicable
Public hearings have already been held
No

[Response was provided in the Investment Feasibility Study]

Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
17/12/2025SP-L-171225-B21A7475Community SPInvestment Feasibility StudyIncludeStrategic fit confirmed-
18/12/2025SPP-L-181225-71FDD1E2Community SPPInvestment Feasibility StudyInclude-83