Major repairs of sidewalks on Nebesnoy Sotni Street in Khmilnyk, Vinnytsia region (with the production of a road construction plan and its examination)


Sector
Transport Sector
Stream
Restoration of road infrastructure
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

A major overhaul of the sidewalks on Nebesnoi Sotni Street in the city of Khmilnyk is necessary due to the fact that the pavement is damaged (there are potholes, potholes), part of the sidewalk has a soil coating, part is an asphalt coating that is deformed, has significant potholes and potholes.  

The purpose of the project

Main goal:

Increasing compliance with modern standards

Secondary goal:

Improving the quality of services

Description of the purpose of the project and ways to achieve it

Work will be carried out to equip sidewalks with hard surfaces; equip and expand sidewalks accordingly for the unhindered passage of specialized municipal equipment during sanitary cleaning and for people with special needs in accordance with the State Duma of Ukraine;

Problems and solutions resulting from project implementation

unsatisfactory hard surface

Socio-economic context

Indicator

Value

Number of people who will use the service

3 thous. people

Strategic Case

Strategic feasibility of the project

Sector

Transport Sector

Subsector

Road transport and road infrastructure

Stream

Restoration of road infrastructure

Strategic document

Стратегія розвитку територіальної громади

Task

2 Carry out road repair, reconstruction and construction activities

Project objectives

Indicator
Base value
Target value
Length of sidewalks planned to be restored
1200 m
1200 m

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Investment Feasibility Study]

not provided

Climate change adaptation
[Response was provided in the Investment Feasibility Study]

not provided

Pollution prevention and control
[Response was provided in the Investment Feasibility Study]

not provided

Sustainable use and protection of water and marine resources
[Response was provided in the Investment Feasibility Study]

not provided

Protecting and restoring biodiversity and ecosystems
[Response was provided in the Investment Feasibility Study]

not provided

Climate change mitigation
[Response was provided in the Investment Feasibility Study]

not provided

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

Protecting and restoring biodiversity and ecosystems
[Response was provided in the Investment Feasibility Study]
Climate change adaptation
[Response was provided in the Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Investment Feasibility Study]
Transition to a circular economy
[Response was provided in the Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Investment Feasibility Study]

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

The project may result in the forced displacement of women, men and other gender groups or loss of access to resources
[Response was provided in the Investment Feasibility Study]
Not applicable to my project
[Response was provided in the Investment Feasibility Study]
Other gender risks
[Response was provided in the Investment Feasibility Study]
There are risks of impaired mobility or safety for women, men and other gender groups during construction/operation
[Response was provided in the Investment Feasibility Study]
There is a risk of reduced economic opportunities for women, men and other gender groups (e.g. loss of jobs or retail outlets)
[Response was provided in the Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Investment Feasibility Study]
Other benefits from project implementation
[Response was provided in the Investment Feasibility Study]
Envisaged training or advanced training for women in the private sector
[Response was provided in the Investment Feasibility Study]
The project will improve women's access to education (primary, secondary, vocational)
[Response was provided in the Investment Feasibility Study]
The project will create jobs available to women (temporarily or permanently)
[Response was provided in the Investment Feasibility Study]
The project will improve women's access to safe water, food, and medical services
[Response was provided in the Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Investment Feasibility Study]

Documents

Name
Date
doc.docx
17.11.2025
11:55:12 UTC

Alternative technical solutions

Technical Solution 1

Major repairs of sidewalks on Nebesnoi Sotni Street in Khmilnyk, Vinnytsia region (with the production of a detailed design and its examination)

Technical Solution 2

Current repair of sidewalks on Nebesnoy Sotni Street in Khmilnyk

Total costs5'050'000 UAH360'000 UAH
  • For preparation
  • 500'000 UAH20'000 UAH
  • For implementation
  • 4'000'000 UAH300'000 UAH
  • For operation
  • 50'000 UAH20'000 UAH
  • For closing
  • 500'000 UAH20'000 UAH
    Average annual costs50'000 UAH50'000 UAH
    Project duration, incl.18 months18 months
  • Deadline for developing a FFS
  • 12 months12 months
  • Implementation period
  • 6 months6 months
    Service life600 months60 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    0
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Investment Feasibility Study]

    закупівля буде оприлюднена на сайті прозорро

    Is the project of interest to small and medium-sized enterprises?
    Yes

    [Response was provided in the Investment Feasibility Study]

    всі охочі приймуть участь

    Will the project involve national or international suppliers and contractors?
    Yes, only national

    [Response was provided in the Investment Feasibility Study]

    малий обєм робіт

    Has an analysis of available procurement options been conducted for the technical solution?
    Yes

    [Response was provided in the Investment Feasibility Study]

    analysis of similar purchases

    Financial justification

    Total project budget

    Total preliminary budget5'050'000 UAH360'000 UAH
    Capital costs5'050'000 UAH360'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation500'000 UAH20'000 UAH
    For implementation4'000'000 UAH300'000 UAH
    For operation50'000 UAH20'000 UAH
    For closing500'000 UAH20'000 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]

    Average project cost per service recipient

    Service Unitвартість за одиницю
    Service Unit Cost900 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    No – analysis not performed

    [Response was provided in the Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    No, no assessment was conducted.

    [Response was provided in the Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Investment Feasibility Study]

    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

    Other
    [Response was provided in the Investment Feasibility Study]
    Finalization of existing documentation for the preparation of a preliminary feasibility study
    [Response was provided in the Investment Feasibility Study]
    Updating existing documentation regarding the preparation of the feasibility study
    [Response was provided in the Investment Feasibility Study]
    Updating existing documentation regarding the preparation of design and estimate documentation (DED)
    [Response was provided in the Investment Feasibility Study]