Overhaul of elevators of a residential building at the address: Odesa, Dobrovolskogo Ave., 154 in the amount of 3 (three) units


Sector
Housing
Stream
Improving the operational characteristics of the housing stock of the city of Odessa
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

The project involves overhauling elevator systems to ensure their safe, reliable and uninterrupted operation. The project includes replacing worn-out mechanical and electrical components, upgrading mine equipment, drives, cabins, control and protection systems.

The purpose of the project

Main Goal:

Increasing compliance with modern standards

Secondary Goal:

Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

The project involves major repairs of elevator systems to ensure their safe, reliable and uninterrupted operation. The project includes the replacement of worn-out mechanical and electrical components, the renewal of elevator shaft equipment, drives, cabins, control and protection systems. The work is aimed at bringing the elevators into line with modern safety standards, extending their service life and increasing the comfort of use for the building's residents.

Problems and solutions resulting from project implementation

Key problems are wear and tear of elevator elements, increased risk of accidents and unstable operation. The relevance of the problems is due to the direct impact on the safety and living conditions of residents. If not resolved, emergency situations and increased costs for emergency repairs are possible. The implementation of the project will ensure stable operation of elevator systems and reduce the accident rate.

Socio-economic context

Indicator

Value

Number of people who will use the service

303 human

Population in the geographical area of influence of the project

1015.8 thous. people

Number of IDPs in the geographical area of impact of the project

135.78 thous. people

Strategic Case

Strategic feasibility of the project

Sector

Housing

Subsector

Housing Solutions

Stream

Improving the operational characteristics of the housing stock of the city of Odessa

Strategic document

Регіональна стратегія розвитку

Task

2 Renovation of old and damaged housing stock, particularly in communities affected by armed aggression

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

None of the options are applicable

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

There are risks of impaired mobility or safety for women, men and other gender groups during construction/operation
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic analysis of the Dobrovolsky residential building project, 154.pdf
17.04.2026
11:15:35 UTC

Alternative technical solutions

Technical Solution 1

Overhaul of elevators of a residential building at the address: Odesa, Dobrovolskogo Ave., 154 in the amount of 3 (three) units

Technical Solution 2

Elevator modernization

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)4'551'434 UAH2'292'000 UAH
For preparation126'446 UAH44'000 UAH
For implementation4'424'988 UAH2'248'000 UAH
Project operation and closure cost0 UAH0 UAH
Average annual costs0 UAH0 UAH
Project duration, incl.25 months13 months
Deadline for developing a FFS1 month1 month
Implementation period24 months12 months
Service life300 months60 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget4'551'434 UAH2'292'000 UAH
Project cost (preparation and implementation)4'551'434 UAH2'292'000 UAH
For preparation126'446 UAH44'000 UAH
For implementation4'424'988 UAH2'248'000 UAH
Project operation and closure cost0 UAH0 UAH
For operation0 UAH0 UAH
For closing0 UAH0 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitСередня вартість проєкту на одного отримувача послуги
Service Unit Cost15'021 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds4'435'000 UAH0 UAH
Expected Funds4'435'000 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Yes, successfully implemented 1 or more similar projects

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
None of the options are applicable
Is there an understanding of where to find relevant experts and consultants?
Partially, we are considering options

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Social riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
20/04/2026SP-L-200426-2EB6CFDECommunity SPInvestment Feasibility StudyInclude--