Reconstruction of the power supply for connecting the construction mechanisms of the clinical hospital with a basement, building A-6, the medical building, building E-7, of the KNP "MLE and SHMD" ZMR at 80 Peremohy St., Zaporizhzhia


Sector
Healthcare
Stream
Ensuring access to quality medical care through the development and modernization of medical infrastructure facilities
Maturity level
83
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The object of the project is the power supply system of the clinical hospital with a basement, building A-6 and the medical building, building E-7, of the «MLE and ShMD» ZMR KNP, located at 80 Peremohy St. in Zaporizhzhia. The project involves the reconstruction of the existing power supply system in order to ensure reliable and uninterrupted power supply to construction mechanisms used during the reconstruction of buildings of the healthcare facility. The implementation of the project will ensure that the power supply parameters comply with current technical and regulatory requirements, increase the reliability of the power supply and create the necessary conditions for the timely and safe implementation of construction and installation works at medical infrastructure facilities.

The purpose of the project

Main Goal:

Improving the condition of infrastructure

Secondary Goal:

Increasing compliance with modern standards, Increasing compliance with modern standards, Ensuring inclusiveness and equal opportunities

Description of the purpose of the project and ways to achieve it

The purpose of the project is to improve the state of the engineering infrastructure of the healthcare facility by reconstructing the power supply system to ensure reliable and uninterrupted power supply to the construction mechanisms of the clinical hospital with a basement, building A-6, and the medical building, building E-7, of the KNP "MLE and SHMD" ZMR. The implementation of the project is aimed at creating appropriate technical conditions for the implementation of work on the reconstruction of hospital buildings and ensuring their further safe operation. The goal of the project is to achieve the reconstruction of existing elements of the power supply system, the installation and connection of the necessary electrical equipment, cable lines and control systems in accordance with current regulatory and technical requirements. The implementation of these measures will ensure that the power supply parameters comply with modern standards, increase the reliability of the power supply, and minimize the risks of interruption of work and the functioning of medical infrastructure facilities.

Problems and solutions resulting from project implementation

The existing power supply system of the clinical hospital with a basement, building A-6 and a medical building, building E-7, of the KNP "MLE and SHMD" ZMR is formed on the basis of outdated technical solutions and does not fully meet modern requirements for the reliability and safety of power supply. The current power supply parameters have limited throughput and do not provide stable connection of construction mechanisms necessary for the reconstruction of buildings of the healthcare facility. The technical condition of individual elements of the power grids is characterized by an increased level of wear, which reduces the level of infrastructure functioning and creates risks of power supply interruptions. The existing system does not ensure compliance with current regulatory requirements for the reliability of power supply and safe operation, which limits the effective use of the facility and makes it impossible to fully perform construction and installation works. In this regard, the existing infrastructure is insufficient to meet the current and future needs of the healthcare facility.

Socio-economic context

Indicator

Value

Number of IDP users

2500 human

Number of people who will use the service

25000 human

Number of employees of the institution/institution/organization

1000 human

Strategic Case

Strategic feasibility of the project

Sector

Healthcare

Subsector

Specialized medical care

Stream

Ensuring access to quality medical care through the development and modernization of medical infrastructure facilities

Strategic document

Стратегія розвитку територіальної громади

Task

D.2.1. A city of affordable and high-quality medical services

Project objectives

Indicator
Base value
Target value
The number of people who will use the service
23000 human
25000 human

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Аналіз демографічних даних, статистичні дані лікарні (інформація про кількість звернень, пацієнтопотік та структуру послуг)
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
23000 human
Annual demand for services/infrastructure
2
25000 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]
The project will improve women's access to safe water, food, and medical services
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic_analysis_–_in_the_edition_2.docx
16.01.2026
13:00:05 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of the power supply for connecting the construction mechanisms of the clinical hospital with a basement, building A-6, the medical building, building E-7, of the KNP "MLE and SHMD" ZMR at 80 Peremohy St., Zaporizhzhia

Technical Solution 2

Power supply from autonomous diesel generators

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)12'268'376 UAH16'000'000 UAH
For preparation203'741 UAH500'000 UAH
For implementation12'064'635 UAH15'500'000 UAH
Project operation and closure cost18'617'975 UAH1'700'000 UAH
For operation18'617'974 UAH1'200'000 UAH
For closing1 UAH500'000 UAH
Average annual costs18'617'974 UAH0 UAH
Project duration, incl.7 months3 months
Deadline for developing a FFS2 months1 month
Implementation period5 months2 months
Service life240 months60 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget30'886'351 UAH17'700'000 UAH
Project cost (preparation and implementation)12'268'376 UAH16'000'000 UAH
For preparation203'741 UAH500'000 UAH
For implementation12'064'635 UAH15'500'000 UAH
Project operation and closure cost18'617'975 UAH1'700'000 UAH
For operation18'617'974 UAH1'200'000 UAH
For closing1 UAH500'000 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service Unitвартість проєкту на одного пацієнта
Service Unit Cost27 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - communication with stakeholders

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - social and gender analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - legal support

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - environmental expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Partially, we have limited experience

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Is there an understanding of where to find relevant experts and consultants?
Partially, we are considering options

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Technical riskDefinedUndefined
Financial riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
16/01/2026SP-L-160126-07E7F8D8Community SPInvestment Feasibility StudyInclude--
20/01/2026SPP-L-200126-8C7A0C2ACommunity SPPInvestment Feasibility StudyInclude-83