Reconstruction of wastewater treatment facilities in the village of Letychiv, Khmelnytskyi district, Khmelnytskyi region
- Preparation
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
General information
Description of the project
The need to reconstruct the treatment facilities is due to the emergency and unfinished condition of the existing facilities and the need to modernize the wastewater treatment system before discharge into the Southern Bug River. In addition, the implementation of the previously approved project became impossible due to lack of funding, technically outdated solutions and the destruction of the prefabricated reinforced concrete walls of the aeration tank and the aerobic stabilizer tank.
The goal of the project is to improve the wastewater treatment process and bring the indicators of treated wastewater to permissible values that meet the requirements for discharge into a water body.
The implementation of the project includes the reconstruction of existing treatment facilities using a technological scheme based on the "UMKA-BIO" installation, which will provide a full cycle of aerobic biological treatment with the processes of nitrification, denitrification, phosphorus removal, as well as disinfection of treated wastewater by dosing sodium hypochlorite. The total productivity of domestic wastewater treatment after reconstruction will be 600 cubic meters. per day.
The project provides for:
1) installation of a wastewater accumulator to level out the unevenness of the wastewater supply from the State Water Supply and Sewerage Authority;
2) installation of a wastewater receiving station from unsewered areas of the town. Letychiv;
3) a full cycle of aerobic biological treatment with nitrification, denitrification and phosphorus removal processes based on the “UMKA-BIO” installation;
4) disinfection of treated wastewater by dosing sodium hypochlorite;
5) dehydration of excess activated sludge;
6) discharge of treated and disinfected water through the existing collector into the Shchedrivskoye reservoir;
7) modular solid fuel boiler house to provide backup heating of the treatment plant premises;
8) diesel generator for backup power supply of technological equipment;
9) power supply of the facility from existing 0.4 kV panels installed in the treatment plant premises.
The purpose of the project
Main goal:
Increasing compliance with modern standards
Secondary goal:
Contribution to climate or environmental goals, Improving the quality of services
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Capacity
600 m3
Number of people who will use the service
5000 human
Number of IDPs in the geographical area of impact of the project
290 human
Population in the geographical area of influence of the project
9840 human
Strategic Case
Strategic feasibility of the project
Sector
Municipal infrastructure and services
Subsector
Water supply and sanitation
Stream
Restoration, development and modernization of centralized water supply and wastewater infrastructure, including the introduction of alternative energy sources
Strategic document
Регіональна стратегія розвитку
Task
2.9.1 Development and modernization of centralized water supply and centralized wastewater disposal systems in settlements of the region
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?
Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Were consultations held with representatives of target groups to take into account gender equality issues in the project?
Have the gender risks and social impacts of the project been assessed?
Are there management and institutional mechanisms in place to ensure gender equality?
Alternative technical solutions
Technical Solution 1
Reconstruction of wastewater treatment facilities in the village of Letychiv, Khmelnytskyi district, Khmelnytskyi region
Technical Solution 2
Disinfection of treated wastewater by replacing the reagent method (sodium hypochlorite dosing) with ultraviolet irradiation
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Preliminary cost breakdown
Average project cost per service recipient
Profitability of the project
Is the project expected to generate income?
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]