Development of design and estimate documentation for the municipal institution "Zaporizhzhya Specialized Boarding School of II-III Degrees "Sich Collegium" of the Zaporizhzhia Regional Council for the overhaul of engineering networks (power supply system) with the installation of a backup power source (diesel generator) at the address: 14 Maria Prymachenko Boulevard
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
- Summary
General information
Description of the project
The project involves the development of design and estimate documentation for the overhaul of power supply engineering networks in the municipal institution "Zaporizhzhya Specialized Boarding School of II-III Degrees "Sichovy Collegium" of the Zaporizhzhia Regional Council. The project includes a comprehensive technical inspection of existing networks, determination of their condition, development of modern solutions for updating the power supply system and provision for the installation of a diesel generator as a backup power source.
The implementation of the project will allow creating a reliable, energy-efficient and safe power supply infrastructure that will ensure the stable functioning of the educational institution even in conditions of emergency power outages. This will contribute to the continuity of the educational process, increasing the level of safety of students and employees, as well as compliance with modern requirements for the organization of the educational environment.
The purpose of the project
Main Goal:
Creation of new facilities and services
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of people who will use the service
472 human
Strategic Case
Strategic feasibility of the project
Sector
Education and science
Subsector
School education
Stream
Construction, restoration, conservation, expansion and modernization of general secondary education institutions in compliance with the requirements for the arrangement of safe conditions
Strategic document
State Strategy for Regional Development for 2021–2027
Task
1.1 1.1. Preservation and development of human potential
Project objectives
Project Sustainable Development Goals
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Alternative technical solutions
Technical Solution 1
Development of design and estimate documentation for the municipal institution "Zaporizhzhya Specialized Boarding School of II-III Degrees "Sich Collegium" of the Zaporizhzhia Regional Council for the overhaul of engineering networks (power supply system) with the installation of a backup power source (diesel generator) at the address: 14 Maria Prymachenko Boulevard
Technical Solution 2
Not available
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]