Major repairs of non-residential premises of the DPY building of the Municipal Institution "Lyceum with Enhanced Military and Physical Training "Patriot"" of the Kharkiv Regional Council at the address: Kharkiv region, Chuguyiv district, Eskhar village, Gorky street, 13


Sector
Education and science
Stream
Modernization and reconstruction of the infrastructure of general secondary education institutions
Maturity level
75
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Regional level of SPP
Implementation
Completion

General information

Description of the project

The building is planned for the educational process for students of a lyceum with enhanced military-physical training in the Kharkiv region. Purpose: military-sports development center. The specified complex includes the following works: restoration and comprehensive repair of all damaged load-bearing structures of the building (walls, ceilings, etc.) and bringing them into full compliance with the requirements of current regulatory documents of Ukraine. Restoration of all damaged internal enclosing structures (partitions, fences, etc.), as well as entrance doors and interior doors with bringing the specified structures into full compliance with the requirements of current regulatory documents of Ukraine. Restoration of damaged interior decoration in the premises (floors, wall and ceiling decoration) of the building and bringing them into full compliance with the requirements of current regulatory documents of Ukraine. Restoration of the exterior decoration of the building facade. Restoration of the building roof. Restoration of porches. Restoration of the heating system with the implementation of measures to increase its energy efficiency and bring the heating system into full compliance with the requirements of DBN V.2.2-28:2010, DBN V.2.5-67:2013. Restoration of the ventilation system and bringing it into full compliance with the requirements of current regulatory documents of Ukraine. Restoration of the water supply system and bringing it into full compliance with the requirements of current regulatory documents of Ukraine. Restoration of the power supply system of the part and bringing it into full compliance with the requirements of current regulatory documents of Ukraine, including the implementation of measures to install modern power and protective equipment, use cable lines made of modern materials, in accordance with the requirements of DBN V.2.5-23:2010 and PUE-2017. Restoration of lightning protection and grounding systems and bringing them into compliance with the requirements of DSTU EN 62305-1:2012. Restoration of the electric lighting system and bringing it into full compliance with the requirements of current regulatory documents of Ukraine. Restoration of the fire alarm system and bringing it into full compliance with the requirements of current regulatory documents of Ukraine. Installation of video surveillance.

The purpose of the project

Main Goal:

Increasing compliance with modern standards

Secondary Goal:

Improving the equality of wealth distribution, Improving the condition of infrastructure, Improving the quality of services

Description of the purpose of the project and ways to achieve it

The specified complex includes the following works: 1) Restoration and comprehensive repair of all damaged load-bearing structures of the building (walls, ceilings, etc.) and bringing them into full compliance with the requirements of current regulatory documents of Ukraine. 2) Restoration of all damaged internal enclosing structures (partitions, fences, etc.), as well as entrance doors and interior doors, bringing the specified structures into full compliance with the requirements of current regulatory documents of Ukraine. 3) Restoration of damaged internal decoration in the premises (floors, supporting walls and ceilings) of the building and bringing them into full compliance with the requirements of current regulatory documents of Ukraine. 4) Restoration of the exterior decoration of the building facade. 5) Restoration of the building roof. 6) Restoration of porches. 7) Restoration of the heating system with the implementation of measures to increase its energy efficiency and bring the heating system into full compliance with the requirements of DBN V.2.2-28:2010, DBN V.2.5-67:2013. 8) Restoration of the ventilation system and bringing it into full compliance with the requirements of current regulatory documents of Ukraine. 9) Restoration of the water supply system and bringing it into full compliance with the requirements of current regulatory documents of Ukraine. 10) Restoration of the power supply system of the part and bringing it into full compliance with the requirements of current regulatory documents of Ukraine, including the implementation of measures to install modern power and protective equipment, use cable lines made of modern materials, in accordance with the requirements of DBN V.2.5-23:2010 and PUE-2017. 11) Restoration of lightning protection and grounding systems and bringing them into compliance with the requirements of DSTU EN 62305-1:2012. 12) Restoration of the electric lighting system and bringing it into full compliance with the requirements of current regulatory documents of Ukraine. 13) Restoration of the fire alarm system and bringing it into full compliance with the requirements of current regulatory documents of Ukraine. 14) Installation of video surveillance.

Problems and solutions resulting from project implementation

The following internal enclosing structures (partitions, fences, etc.), entrance and interior doors need to be restored. The interior decoration of the premises (floors, wall and ceiling decoration) of the building needs to be restored and brought into full compliance with the requirements of current regulatory documents of Ukraine. There is a need to restore the exterior decoration of the facade, roof of the building, porches. Missing: heating, ventilation, water supply, power supply, lightning protection and grounding systems, electric lighting, fire alarm and video surveillance. Restoration of the above systems will allow to increase the number of jobs, significantly improve the quality of educational services: new educational spaces will be opened - a combat hall, a gym, a mine safety class, which is necessary for high-quality education of students in a lyceum with enhanced military and physical training.

Socio-economic context

Indicator

Value

Number of people who will use the service

320 human

Strategic Case

Strategic feasibility of the project

Sector

Education and science

Subsector

School education

Stream

Modernization and reconstruction of the infrastructure of general secondary education institutions

Strategic document

Регіональна стратегія розвитку

Task

1.2.2. 1.2.5. 1.2.6. "Restoration of institutions and development of an accessible educational network, purchase of school buses. Providing educational institutions with modern computer equipment and the use of computer technologies in the educational process and promoting the development of digital literacy. Creating equal opportunities for personal development throughout life and creating conditions for national-patriotic education and civic education of the population."

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

poll
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

No
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
100 human
Annual demand for services/infrastructure
2
200 human
Annual demand for services/infrastructure
3
320 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

None of the options are applicable

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

None of the options are applicable

Does the project provide for improving women's access to services?

The project will improve women's access to education (primary, secondary, vocational)
[Response was provided in the Preliminary Investment Feasibility Study]
The project will create jobs available to women (temporarily or permanently)
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
ЗКР ДПЮ.xlsx
15.01.2026
10:39:00 UTC

Alternative technical solutions

Technical Solution 1

Major repairs of non-residential premises of the DPY building of the Municipal Institution "Lyceum with Enhanced Military and Physical Training "Patriot"" of the Kharkiv Regional Council at the address: Kharkiv region, Chuguyiv district, Eskhar village, Gorky street, 13

Technical Solution 2

missing

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)20'985'010 UAH0 UAH
For preparation1'324'800 UAH0
For implementation19'660'210 UAH0
Project operation and closure cost3'715'820 UAH0 UAH
For operation3'696'920 UAH0
For closing18'900 UAH0
Average annual costs4'693'359 UAH0 UAH
Project duration, incl.9 months0 months
Deadline for developing a FFS3 months0 months
Implementation period6 months0 months
Service life1200 months0 months
Target indicatorsDefined Not defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Pending

[The project initiator has not taken any decision about this alternative technical approach.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget24'700'830 UAH0 UAH
Project cost (preparation and implementation)20'985'010 UAH0 UAH
For preparation1'324'800 UAH0 UAH
For implementation19'660'210 UAH0 UAH
Project operation and closure cost3'715'820 UAH0 UAH
For operation3'696'920 UAH0 UAH
For closing18'900 UAH0 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service Unitвартість на одного учня
Service Unit Cost81'850 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
No – analysis not performed

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
15/01/2026SP-R-150126-C0A7689FRegional SPInvestment Feasibility StudyInclude--
20/01/2026SPP-R-200126-BBDD86CCRegional SPPInvestment Feasibility StudyIncludeAccording to the Protocol dated 01/20/2026 No. 3 of the meeting of the Regional Investment Council under the Kharkiv Regional State (Military) Administration75