Construction of the boiler house of the Velikokolodno NVK "ZNZ I-III st. - DNZ" in the village of Velikokolodno


Sector
Education and science
Stream
Modernization of the infrastructure of educational institutions by implementing energy saving measures and increasing the level of energy efficiency
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project involves the construction of a new solid fuel boiler house to provide heat supply to the Velikokolodnivskyi educational complex. It is planned to erect a separate one-story building with an area of about 64 m² with two boilers with a capacity of 150 kW each, smoke exhaust systems up to 15 m high, ventilation, water supply and process automation. The implementation of the project solves the problem of unstable and energy-inefficient heating of the educational institution, which affects the temperature regime of the premises and the comfort of participants in the educational process.

The project involves the installation of two solid fuel boilers with a capacity of 150 kW each with an annual heat output of about 425 Gcal. The boiler house capacity will be 0.285 MW, which will fully cover the heating needs of the educational complex. The implementation of the project will ensure a stable temperature regime in the premises, reduce energy consumption by 15-20%, and increase the level of energy efficiency of the institution. 

The purpose of the project

Main goal:

Introducing innovations and energy-efficient solutions

Secondary goal:

Increasing compliance with modern standards

Description of the purpose of the project and ways to achieve it

To achieve the set goal, a set of technical and organizational measures is provided for creating a modern, safe and energy-efficient heat supply system for the educational institution. The project includes the construction of a new boiler house with a full technological cycle: installation of energy-efficient solid fuel boilers, automatic temperature control systems, smoke exhaust, ventilation, water supply and sewage. All elements of the system will meet modern requirements for energy efficiency, fire and technogenic safety, as well as environmental standards. The goal is achieved through: - implementation of modern technological solutions; - optimization of energy consumption and reduction of gas consumption; - creation of a stable temperature regime in all premises of the educational institution; - improvement of conditions for learning, work and stay of children and employees. As a result of the project, the community will receive a reliable, economical and environmentally safe source of heat supply that will meet modern standards of efficiency and quality of public infrastructure.

Problems and solutions resulting from project implementation

The existing gas boiler house of the educational complex in the village of Velikiye Kolodno has been operated beyond the regulatory period and has a significant degree of physical wear. Its equipment is inefficient, does not meet modern energy saving and environmental requirements, and the lack of automatic control systems makes it difficult to maintain the proper temperature regime. High dependence on natural gas creates economic risks due to price instability and possible supply disruptions, which threatens the continuous functioning of the educational institution. As a result, excessive energy consumption occurs, the burden on the local budget increases, and learning and working conditions remain unsatisfactory. The project involves the construction of a new solid fuel boiler house with two energy-efficient boilers with a capacity of 150 kW each, automation, smoke exhaust and ventilation systems. This will ensure stable, safe and economical heat supply to the educational institution, reduce energy consumption by up to 20%, reduce operating costs and create comfortable conditions for students and employees.

Socio-economic context

Indicator

Value

Other economic

20 %

Other functional

150 m

Other functional

2 units

Population in the geographical area of influence of the project

900 human

Strategic Case

Strategic feasibility of the project

Sector

Education and science

Subsector

School education

Stream

Modernization of the infrastructure of educational institutions by implementing energy saving measures and increasing the level of energy efficiency

Strategic document

Стратегія розвитку територіальної громади

Task

2.1.1. Create high-quality, safe and inclusive conditions for the educational process in all types of educational institutions

Project objectives

Indicator
Base value
Target value
Share of students studying in comfortable conditions
0 %
100 %
Installation of modern solid fuel boilers
0 units
2 units

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Аналіз поточного стану системи опалення закладу
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
242 human
Annual demand for services/infrastructure
2
250 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

The project will improve women's access to education (primary, secondary, vocational)
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic feasibility study for the Kolodno Boiler Plant.docx
19.02.2026
15:20:09 UTC

Alternative technical solutions

Technical Solution 1

Construction of the boiler house of the Velikokolodnivsk NVK "ZNZ I-III st. - DNZ"

Technical Solution 2

Modernization of the existing boiler house of the Velikokolodnivsk NVC "ZNZ I-III st. - DNZ"

Total costs9'903'879 UAH4'300'000 UAH
  • For preparation
  • 83'368 UAH170'000 UAH
  • For implementation
  • 9'820'511 UAH3'700'000 UAH
  • For operation
  • 0 UAH350'000 UAH
  • For closing
  • 0 UAH80'000 UAH
    Average annual costs960'000 UAH1'230'000 UAH
    Project duration, incl.47 months9 months
  • Deadline for developing a FFS
  • 11 months3 months
  • Implementation period
  • 36 months6 months
    Service life300 months120 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    1
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Is the project of interest to small and medium-sized enterprises?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Will the project involve national or international suppliers and contractors?
    Yes, only national

    [Response was provided in the Preliminary Investment Feasibility Study]

    Has an analysis of available procurement options been conducted for the technical solution?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Financial justification

    Total project budget

    Total preliminary budget9'903'879 UAH4'300'000 UAH
    Capital costs9'903'879 UAH4'300'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation83'368 UAH170'000 UAH
    For implementation9'820'511 UAH3'700'000 UAH
    For operation0 UAH350'000 UAH
    For closing0 UAH80'000 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Preliminary Investment Feasibility Study]
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]

    Average project cost per service recipient

    Service UnitВартість одиниці послуги
    Service Unit Cost26'933 UAH

    Profitability of the project

    Is the project expected to generate income?NoNo

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds381'785 UAH0 UAH
    Expected Funds381'785 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    No, no assessment was conducted.

    [Response was provided in the Preliminary Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

    Updating existing documentation regarding the preparation of design and estimate documentation (DED)
    [Response was provided in the Investment Feasibility Study]

    Project Approval History

    DateDecision NumberPortfolioProject StatusDecisionReasons
    16/12/2025SP-L-161225-2E742B58Community SPInvestment Feasibility StudyCancellation of the decision to include in a joint venture-
    19/02/2026SP-L-190226-6FED6A84Community SPInvestment Feasibility StudyInclude-
    19/12/2025SPP-L-191225-2B09F087Community SPPInvestment Feasibility StudyCancellation of the decision to include in a joint venture-
    24/02/2026SPP-L-240226-3DB326F6Community SPPInvestment Feasibility StudyInclude-