Major repairs of sidewalks with the arrangement of means of unhindered access to buildings and structures to ensure accessibility and safety of facilities for persons with disabilities (measures to create a barrier-free space) on Sobornosti St. from Sobornosti St., 36 to 1100-richchia St. in the city of Poltava.


Sector
Municipal infrastructure and services
Stream
Road infrastructure restoration
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project involves major repairs of sidewalks on Sobornosti Street from house number 36 to 1100-richchia Street in the city of Poltava with the installation of barrier-free access for people with disabilities and other low-mobility groups. The work includes the restoration of the sidewalk surface, the installation of ramps and lowered curbs, the installation of tactile strips and the adaptation of pedestrian routes, which ensures safe, comfortable and accessible movement, increases the level of inclusivity and the quality of the urban environment.

The purpose of the project

Main Goal:

Improving the condition of infrastructure

Secondary Goal:

Improving the equality of wealth distribution

Description of the purpose of the project and ways to achieve it

The purpose of the project is to restore and modernize the sidewalk infrastructure on Sobornosti Street from house number 36 to 1100-richchia Street in the city of Poltava in order to create a safe, comfortable and barrier-free pedestrian environment. The implementation of the project is aimed at ensuring equal and unhindered access to buildings, structures and objects of social, administrative and commercial infrastructure for all population groups, including people with disabilities, the elderly, parents with strollers and other groups with reduced mobility. The goal is achieved through major repairs of sidewalks, the installation of ramps and lowered curbs, the installation of tactile orientation elements, the removal of physical barriers and an increase in the level of pedestrian safety, which will contribute to social inclusion, improving the quality of the urban environment and sustainable development of the city.

Problems and solutions resulting from project implementation

The main problems on the section of Sobornosti Street from house number 36 to 1100-rychya Street are the worn and uneven condition of the sidewalk, the absence or non-compliance with the standards of ramps and lowered curbs, the lack of tactile elements for people with visual impairments and the absence of continuous barrier-free pedestrian routes, which complicates and limits the safe movement of people with disabilities, low-mobility groups, the elderly and parents with strollers. As a result of the project, it is planned to overhaul the sidewalks, install ramps and lowered curbs, install tactile strips and remove physical barriers, which will ensure safe, comfortable and unhindered movement of pedestrians, increase the level of accessibility and social inclusion, and also improve the quality of the urban environment.

Socio-economic context

Indicator

Value

Number of people who will use the service

10000 human

Number of IDP users

3000 human

Population in the geographical area of influence of the project

13000 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Urban planning and landscaping

Stream

Road infrastructure restoration

Strategic document

State Strategy for Regional Development for 2021–2027

Task

2.1.2 Restoration and expansion of a network of high-quality public roads of local importance

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

None of the options are applicable

Does the project provide for improving women's access to services?

None of the options are applicable

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic analysis of the project .docx
16.04.2026
11:13:56 UTC

Alternative technical solutions

Technical Solution 1

Major repairs of sidewalks with the installation of means of unobstructed access to buildings and structures to ensure the accessibility and safety of facilities for persons with disabilities.

Technical Solution 2

Partial repair of sidewalks with the installation of means of unobstructed access to buildings and structures.

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)22'700'000 UAH2'500'000 UAH
For preparation950'000 UAH500'000 UAH
For implementation21'750'000 UAH2'000'000 UAH
Project operation and closure cost300'000 UAH400'000 UAH
For operation200'000 UAH200'000 UAH
For closing100'000 UAH200'000 UAH
Average annual costs200'000 UAH0 UAH
Project duration, incl.3 months2 months
Deadline for developing a FFS1 month1 month
Implementation period2 months1 month
Service life240 months24 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget23'000'000 UAH2'900'000 UAH
Project cost (preparation and implementation)22'700'000 UAH2'500'000 UAH
For preparation950'000 UAH500'000 UAH
For implementation21'750'000 UAH2'000'000 UAH
Project operation and closure cost300'000 UAH400'000 UAH
For operation200'000 UAH200'000 UAH
For closing100'000 UAH200'000 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitВартість одиниці послуги
Service Unit Cost200'000 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - communication with stakeholders

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - social and gender analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - legal support

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - working with international financial organizations (IFOs)

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - environmental expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Partially, we have limited experience

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
None of the options are applicable
Is there an understanding of where to find relevant experts and consultants?
Yes, negotiations are already underway.

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Financial riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
17/04/2026SP-L-170426-F92E608ECommunity SPInvestment Feasibility StudyInclude--
21/04/2026SPP-L-210426-D7DDA8FACommunity SPPInvestment Feasibility StudyInclude--