Reconstruction of the Internal Power Supply Networks with the Installation of a Solar Power Plant for the “Oleksandrivskyi Lyceum” Building of the Fontanska Village Council, Odesa District, Odesa Region, located at: 2 Odeska Street, Oleksandrivka Village, Odesa Region.


Sector
Education and science
Stream
Modernization of power supply infrastructure through the installation of solar power stations on the buildings of educational institutions.
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project involves the overhaul of the internal power supply networks and the installation of a solar power plant for the “Oleksandrivskyi Lyceum” building. The initiative aims to address the issues of outdated and insufficiently reliable electrical systems, reduce the risk of power outages, and enhance the energy independence of the institution. Expected results include stable electricity supply, lower energy costs, improved safety, and the creation of a modern, energy-efficient infrastructure to support the educational process.

The purpose of the project

Main goal:

Introducing innovations and energy-efficient solutions

Description of the purpose of the project and ways to achieve it

Providing the school with a sustainable, environmentally friendly and cost-effective power supply system by installing solar panels to generate its own electricity.

Problems and solutions resulting from project implementation

The existing electrical network does not meet the modern needs of the school. Does not provide a stable power supply for modern educational and computer equipment. Increased risk of accidents and disruptions due to network wear. Inability to integrate energy-saving technologies and use of renewable sources.

Socio-economic context

Indicator

Value

Number of people who will use the service

486 human

Strategic Case

Strategic feasibility of the project

Sector

Education and science

Subsector

School education

Stream

Modernization of power supply infrastructure through the installation of solar power stations on the buildings of educational institutions.

Strategic document

Стратегія розвитку територіальної громади

Task

3.4.2 Create safe and modern learning conditions in educational institutions

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

При оцінці попиту застосовувалася аналітична методологія, що включає: аналіз фактичного електроспоживання будівлі за попередні роки; аналіз кількості учнів і персоналу закладу; оцінку функціонального навантаження будівлі (навчальні приміщення, харчоблок, укриття, адміністративні та технічні приміщення); врахування нормативних вимог до електрозабезпечення закладів освіти.

Has data from external sources been used in the demand assessment?

Yes

Використовувалися демографічні та освітні статистичні дані органів місцевого самоврядування, а також загальнодоступні нормативні показники споживання електроенергії.

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes

Враховано стабільну кількість учнів шкільного віку в громаді та відсутність прогнозованого зменшення контингенту закладу.

Indicator
Year
Demand
Annual demand for services/infrastructure
1
486 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Investment Feasibility Study]
Climate change adaptation
[Response was provided in the Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Investment Feasibility Study]
Protecting and restoring biodiversity and ecosystems
[Response was provided in the Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

Protecting and restoring biodiversity and ecosystems
[Response was provided in the Investment Feasibility Study]
Climate change adaptation
[Response was provided in the Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Investment Feasibility Study]
Transition to a circular economy
[Response was provided in the Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Investment Feasibility Study]

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

The project may result in the forced displacement of women, men and other gender groups or loss of access to resources
[Response was provided in the Investment Feasibility Study]
Not applicable to my project
[Response was provided in the Investment Feasibility Study]
Other gender risks
[Response was provided in the Investment Feasibility Study]
There are risks of impaired mobility or safety for women, men and other gender groups during construction/operation
[Response was provided in the Investment Feasibility Study]
There is a risk of reduced economic opportunities for women, men and other gender groups (e.g. loss of jobs or retail outlets)
[Response was provided in the Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Investment Feasibility Study]
Other benefits from project implementation
[Response was provided in the Investment Feasibility Study]
Envisaged training or advanced training for women in the private sector
[Response was provided in the Investment Feasibility Study]
The project will improve women's access to education (primary, secondary, vocational)
[Response was provided in the Investment Feasibility Study]
The project will create jobs available to women (temporarily or permanently)
[Response was provided in the Investment Feasibility Study]
The project will improve women's access to safe water, food, and medical services
[Response was provided in the Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Investment Feasibility Study]

Documents

Name
Date
Economic analysis Capital Alexander Lyceum.docx
14.12.2025
14:42:00 UTC

Alternative technical solutions

Technical Solution 1

Major overhaul of internal power supply networks with installation of a solar station

Technical Solution 2

Current repairs of internal power supply networks

Total costs7'275'000 UAH220'000 UAH
  • For preparation
  • 20'000 UAH20'000 UAH
  • For implementation
  • 7'200'000 UAH150'000 UAH
  • For operation
  • 30'000 UAH40'000 UAH
  • For closing
  • 25'000 UAH10'000 UAH
    Average annual costs30'000 UAH60'000 UAH
    Project duration, incl.10 months3 months
  • Deadline for developing a FFS
  • 4 months1 month
  • Implementation period
  • 6 months2 months
    Service life300 months72 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    0
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Investment Feasibility Study]

    Is the project of interest to small and medium-sized enterprises?
    Yes

    [Response was provided in the Investment Feasibility Study]

    Will the project involve national or international suppliers and contractors?
    Yes, both national and international

    [Response was provided in the Investment Feasibility Study]

    Has an analysis of available procurement options been conducted for the technical solution?
    No

    [Response was provided in the Investment Feasibility Study]

    Financial justification

    Total project budget

    Total preliminary budget7'275'000 UAH220'000 UAH
    Capital costs7'275'000 UAH220'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation20'000 UAH20'000 UAH
    For implementation7'200'000 UAH150'000 UAH
    For operation30'000 UAH40'000 UAH
    For closing25'000 UAH10'000 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]

    Average project cost per service recipient

    Service Unit1 об'єкт будівництва
    Service Unit Cost7'400'000 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

    [Response was provided in the Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    No, no assessment was conducted.

    [Response was provided in the Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Investment Feasibility Study]

    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

    Other
    [Response was provided in the Investment Feasibility Study]
    Finalization of existing documentation for the preparation of a preliminary feasibility study
    [Response was provided in the Investment Feasibility Study]
    Updating existing documentation regarding the preparation of the feasibility study
    [Response was provided in the Investment Feasibility Study]
    Updating existing documentation regarding the preparation of design and estimate documentation (DED)
    [Response was provided in the Investment Feasibility Study]