New construction (installation) of the Rozhnovsky VBR-25 water tower on Yaroslav the Wise Street in the village of Vyhoda, Odessa district, Odessa region, with connection to existing water supply networks. Correction


Sector
Municipal infrastructure and services
Stream
Нове будівництво (встановлення) водонапірної башти Рожновського ВБР-25 по вул. Ярослава Мудрого в с. Вигода Одеського району Одеської області, з підключенням до існуючих мереж водопостачання
Maturity level
65
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

As a result of the construction of the Rozhnovsky VBR-25 tower in the village of Vyhoda on Yaroslav the Wise Street, a complex of architectural, planning, engineering, structural and organizational measures aimed at improving socio-economic living conditions will be implemented

The purpose of the project

Main Goal:

Creation of new facilities and services

Secondary Goal:

Capacity building, Improving the equality of wealth distribution, Improving the condition of infrastructure, Improving the quality of services

Description of the purpose of the project and ways to achieve it

The purpose of the project is to ensure stable, uninterrupted and regulatory-quality centralized water supply to the population and social infrastructure facilities by building (installing) a modern water tower that will provide the necessary pressure, water reserve and increase the reliability of the water supply system. The implementation of the project will contribute to improving the technical condition of the engineering infrastructure, expanding the population's access to centralized water supply and increasing the level of comfort and safety of community life.

Problems and solutions resulting from project implementation

1. Absence of a water tower as part of the centralized water supply system An existing artesian well is operated at the facility, but there is no structure for accumulating and regulating water reserves. Water is supplied directly by pumping equipment without a reserve volume. 2. Unstable pressure in the water supply network Due to the absence of a water tower, the pressure in the network is formed exclusively by pumps and does not provide stable hydraulic parameters during peak water consumption hours. 3. Complete dependence of water supply on electricity supply In the event of a power outage, water supply is stopped, since the system does not have a storage reserve and cannot operate by gravity.

Socio-economic context

Indicator

Value

Number of IDP users

30 human

Number of people who will use the service

1300 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Water supply and sanitation

Stream

Нове будівництво (встановлення) водонапірної башти Рожновського ВБР-25 по вул. Ярослава Мудрого в с. Вигода Одеського району Одеської області, з підключенням до існуючих мереж водопостачання

Strategic document

Стратегія розвитку територіальної громади

Task

операційні цілі та завдання громади

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Sustainable use and protection of water and marine resources
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]
The project will improve women's access to safe water, food, and medical services
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Output data.pdf
13.02.2026
12:14:40 UTC

Alternative technical solutions

Technical Solution 1

Construction works

Technical Solution 2

commissioning

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)884'095 UAH0 UAH
For implementation884'095 UAH0
Project operation and closure cost0 UAH0 UAH
Average annual costs884'095 UAH0 UAH
Project duration, incl.2 months0 months
Deadline for developing a FFS1 month0 months
Implementation period1 month0 months
Service life240 months0 months
Target indicatorsDefined Not defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Pending

[The project initiator has not taken any decision about this alternative technical approach.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget884'095 UAH0 UAH
Project cost (preparation and implementation)884'095 UAH0 UAH
For preparation0 UAH0 UAH
For implementation884'095 UAH0 UAH
Project operation and closure cost0 UAH0 UAH
For operation0 UAH0 UAH
For closing0 UAH0 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitБудівельні роботи
Service Unit Cost884'095 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
No – analysis not performed

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
13/02/2026SP-L-130226-EE4966D4Community SPInvestment Feasibility StudyInclude--
18/02/2026SPP-L-180226-5A44FEFDCommunity SPPInvestment Feasibility StudyInclude-65