Reconstruction of the power supply system (installation of a backup power source for a solar power plant) at the water intake building No. 2 at the address: 87 Ukrainskaya St., Sokal, Lviv region


Sector
Municipal infrastructure and services
Stream
Restoration, development and modernization of centralized water supply and wastewater infrastructure, including the introduction of alternative energy sources
Maturity level
75
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The designed solar power plant is intended for the production of electricity by directly converting solar radiation energy into electrical energy using a photovoltaic generator of monocrystalline modules (panels).

The purpose of the project

Main Goal:

Introducing innovations and energy-efficient solutions

Secondary Goal:

Increasing compliance with modern standards, Improving the quality of services

Description of the purpose of the project and ways to achieve it

Alternative sources of electricity are becoming increasingly relevant and available for domestic and industrial use. Fire safety requirements of the facility - in accordance with current regulations.

Problems and solutions resulting from project implementation

Problem: Sokalsk MCP water supply and sewage system is one of the largest consumers of electricity in the community - pumps, treatment systems, work around the clock. The lack of solar panels creates several key problems: - high and unstable electricity costs; - Increasing water tariffs. Solution: The implementation of this project will ensure the satisfaction of public needs for the provision of quality water drainage services to subscribers, tariff stability, uninterrupted water supply and drainage.

Socio-economic context

Indicator

Value

Number of IDPs in the geographical area of impact of the project

1040 thous. people

Population in the geographical area of influence of the project

20373 thous. people

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Water supply and sanitation

Stream

Restoration, development and modernization of centralized water supply and wastewater infrastructure, including the introduction of alternative energy sources

Strategic document

Стратегія розвитку територіальної громади

Task

2.1.4. Improving water supply and sanitation

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic analysis of installing solar panels for the water utility.docx
11.12.2025
18:22:23 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of the power supply system (installation of a backup power source for a solar power plant) at the water intake building No. 2 at the address: 87 Ukrainskaya St., Sokal, Lviv region

Technical Solution 2

Installation of a wind power plant (WPP) on the building of the wastewater treatment plant at the address: 106 Yavornytskoho St., Sokal, Lviv region

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)1'274'603 UAH1'100'000 UAH
For preparation98'214 UAH100'000 UAH
For implementation1'176'389 UAH1'000'000 UAH
Project operation and closure cost0 UAH0 UAH
Average annual costs300'000 UAH0 UAH
Project duration, incl.13 months13 months
Deadline for developing a FFS1 month1 month
Implementation period12 months12 months
Service life360 months360 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget1'274'603 UAH1'100'000 UAH
Project cost (preparation and implementation)1'274'603 UAH1'100'000 UAH
For preparation98'214 UAH100'000 UAH
For implementation1'176'389 UAH1'000'000 UAH
Project operation and closure cost0 UAH0 UAH
For operation0 UAH0 UAH
For closing0 UAH0 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
No
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service Unitкількість абонентів
Service Unit Cost78 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds523'013 UAH0 UAH
Expected Funds523'013 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
11/12/2025SP-L-111225-64E70AAECommunity SPInvestment Feasibility StudyIncludeThe project is recommended for inclusion in the sectoral portfolio-
13/12/2025SPP-L-131225-8AD02634Community SPPInvestment Feasibility StudyIncludeThe Local Investment Council of the Sokal City Council of the Lviv Region included the project in the Unified Project Portfolio of the Sokal Community for 2026 according to the minutes of the meeting of the Local Investment Council of the Sokal City Council of the Lviv Region dated December 13, 2025.75