Implementation of renewable energy measures at municipal facilities: Improving the energy independence of the facility by installing energy generating equipment (ESS) in the building of the primary health center


Sector
Municipal infrastructure and services
Stream
increasing energy efficiency in public buildings
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

The project involves installing solar panels and a self-sufficient energy kit on the roof of the primary health center building, which will ensure uninterrupted power supply to the primary health center building and will also create a basis for saving electricity.

The purpose of the project

Main Goal:

Introducing innovations and energy-efficient solutions

Secondary Goal:

Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

Ensuring uninterrupted power supply for critical medical infrastructure, which increases patient safety and facility stability, as well as reducing electricity costs and dependence on grid tariffs.

Problems and solutions resulting from project implementation

Main problems: the institution's dependence on the stability of external power grids, significant electricity costs. Problem solving: partial coverage of the institution's electricity needs through its own generation, saving on electricity costs.

Socio-economic context

Indicator

Value

Population in the geographical area of influence of the project

44 thous. people

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Urban planning and landscaping

Stream

increasing energy efficiency in public buildings

Strategic document

Стратегія розвитку територіальної громади

Task

B3.1 improving the quality and accessibility of medical services

Project objectives

Indicator
Base value
Target value
Minimum solar power plant capacity
0 kW
15 kW

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Враховано внутрішні статистичні дані щодо кількості звернень до закладу первинного рівня за останні роки.
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
3700 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Transition to a circular economy
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic analysis of SES.docx
09.10.2025
14:07:25 UTC

Alternative technical solutions

Technical Solution 1

Installing solar panels on the roof of a building

Technical Solution 2

Installation of solar panels in the surrounding area

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)2'000'000 UAH2'400'000 UAH
For preparation200'000 UAH400'000 UAH
For implementation1'800'000 UAH2'000'000 UAH
Project operation and closure cost80'001 UAH96'001 UAH
For operation80'000 UAH96'000 UAH
For closing1 UAH1 UAH
Average annual costs80'000 UAH0 UAH
Project duration, incl.6 months10 months
Deadline for developing a FFS2 months4 months
Implementation period4 months6 months
Service life300 months300 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget2'080'001 UAH2'496'001 UAH
Project cost (preparation and implementation)2'000'000 UAH2'400'000 UAH
For preparation200'000 UAH400'000 UAH
For implementation1'800'000 UAH2'000'000 UAH
Project operation and closure cost80'001 UAH96'001 UAH
For operation80'000 UAH96'000 UAH
For closing1 UAH1 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
No
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitКапітальні витрати на проєкт в розрахунку на одну задекларовану особу (з врахуванням тривалості експлуатації об'єкта)
Service Unit Cost22 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

Finalization of existing documentation for the preparation of a preliminary feasibility study
[Response was provided in the Investment Feasibility Study]

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
05/11/2025SP-L-051125-91943011Community SPInvestment Feasibility StudyIncludeThis project is included in the priority area-