Major repairs to the road surface of Unity Street (on the section from Volodymyrska Street to the cemetery of the Vyshnivska territorial community) in the city of Lyuboml, Kovel district, Volyn region


Sector
Transport Sector
Stream
Development of transport infrastructure to ensure safe and continuous connectivity of territories and improve population mobility
Maturity level
81
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

 The project involves major repairs to the road surface on Unity Street in the section from Volodymyrska Street to the cemetery of the Vyshnivska territorial community in the city of Lyuboml, Kovel district, Volyn region. Currently, the road surface is in poor condition: there is significant damage, potholes and unevenness, which complicates traffic, creates a danger for drivers and pedestrians and worsens transport connections for residents of the community. Within the framework of the project, it is planned to restore the road base, install a new asphalt concrete surface, arrange roadsides, and replace road signs. The implementation of the project will ensure safe and comfortable traffic, improve residents' access to the cemetery and residential areas, and increase the level of city improvement and the overall quality of road infrastructure. The expected results are improved transport accessibility, increased road safety, reduced costs for road maintenance in the future, and the creation of more comfortable conditions for community residents.

The purpose of the project

Main Goal:

Improving the condition of infrastructure

Secondary Goal:

Increasing compliance with modern standards

Description of the purpose of the project and ways to achieve it

The goal of the project is to improve transport infrastructure and increase road safety by carrying out major repairs to the road surface on Unity Street in the section from Volodymyrska Street to the cemetery of the Vyshnivska territorial community in the city of Lyuboml. The goal is expected to be achieved by performing a complex of construction works, including restoring the road base, installing a new asphalt concrete surface, arranging roadsides and improving drainage. The implementation of the project will ensure the proper technical condition of the road, improve transport accessibility and create safe and comfortable conditions for traffic.

Problems and solutions resulting from project implementation

The key problem is the unsatisfactory condition of the road surface on the section of Unity Street, which complicates the safe movement of transport and access to residential buildings and the cemetery. The problem is relevant due to the daily use of the road by residents and its importance for the community; ignoring repairs will lead to a deterioration in transport accessibility, an increase in accidents and additional maintenance costs. Major repairs will ensure safe, comfortable traffic, improve transport accessibility and increase the quality of infrastructure for the community.

Socio-economic context

Indicator

Value

Number of people who will use the service

10734 human

Strategic Case

Strategic feasibility of the project

Sector

Transport Sector

Subsector

Road transport and road infrastructure

Stream

Development of transport infrastructure to ensure safe and continuous connectivity of territories and improve population mobility

Strategic document

Стратегія розвитку територіальної громади

Task

2.1.1 Construction, repair and reconstruction of local roads

Project objectives

Indicator
Base value
Target value
sidewalk width
0 m
1.2 m
sidewalk length
0 m
250 m
width of the road surface
0 m
6 m

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Оцінка попиту проводилася шляхом опитування місцевого населення та консультацій з органами місцевого самоврядування щодо потреб у ремонті дороги. Також враховувався аналіз щоденної інтенсивності руху транспорту і пішоходів на ділянці та її значення для забезпечення доступу до житлових будинків і кладовища.
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
10734 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

None of the options are applicable

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
calculation.pdf
11.03.2026
09:35:29 UTC
justification for the calculation of the road Unity Street.doc
11.03.2026
09:35:36 UTC

Alternative technical solutions

Technical Solution 1

Major repairs to the road surface of Unity Street (on the section from Volodymyrska Street to the cemetery of the Vyshnivska territorial community) in the city of Lyuboml, Kovel district, Volyn region

Technical Solution 2

Reconstruction of the road surface of Unity Street (on the section from Volodymyrsk to the cemetery of the Vyshnivska territorial community) in the city of Lyuboml, Kovel district, Volyn region.

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)14'501'721 UAH18'852'237 UAH
For preparation200'000 UAH260'000 UAH
For implementation14'301'721 UAH18'592'237 UAH
Project operation and closure cost55'000 UAH65'000 UAH
For operation20'000 UAH20'000 UAH
For closing35'000 UAH45'000 UAH
Average annual costs20'000 UAH0 UAH
Project duration, incl.7 months9 months
Deadline for developing a FFS1 month1 month
Implementation period6 months8 months
Service life120 months120 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget14'556'721 UAH18'917'237 UAH
Project cost (preparation and implementation)14'501'721 UAH18'852'237 UAH
For preparation200'000 UAH260'000 UAH
For implementation14'301'721 UAH18'592'237 UAH
Project operation and closure cost55'000 UAH65'000 UAH
For operation20'000 UAH20'000 UAH
For closing35'000 UAH45'000 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitВартість на одного користувача
Service Unit Cost1'354 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

Updating existing documentation regarding the preparation of design and estimate documentation (DED)
[Response was provided in the Investment Feasibility Study]

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
12/03/2026SP-L-120326-32D3239ECommunity SPInvestment Feasibility StudyInclude--
16/03/2026SPP-L-160326-1C63BFF5Community SPPInvestment Feasibility StudyIncludeminutes of the investment council dated 16.03.2026 No. 381