Construction of internal and external fire-fighting water supply systems of Chornivska Gymnasium in the village of Chornivka, 15 Holovna St.


Sector
Education and science
Stream
Ensuring access to quality education through the development and modernization of educational infrastructure facilities
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The project involves the construction of an internal and external fire water supply system for the Chornivka Gymnasium in the village of Chornivka, Chernivtsi district. A pumping station building, fire tanks with a sump, a network of pipelines with wells and two underground fire hydrants have been designed on the territory of the gymnasium. A special gravel platform is provided for the entrance of fire equipment, as well as manholes for connecting fire hoses.

The purpose of the project

Main goal:

Increasing compliance with modern standards

Secondary goal:

Improving the equality of wealth distribution, Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

The project aims to provide a reliable fire water supply system for Chornivska Gymnasium for the safety of students, staff and buildings. The project involves the construction of a pumping station, fire tanks with a sump, a pipeline network and two underground hydrants, as well as the arrangement of entrances for fire equipment. The existing gap between the current state and the target level is the lack of an effective fire water supply system and insufficient conditions for a quick response to a fire, which will be eliminated by the implementation of the project.

Problems and solutions resulting from project implementation

The current lack of an effective fire water supply system in Chornivska Gymnasium poses a risk to the lives of students and staff and the threat of building destruction in the event of a fire. This problem is relevant due to the increasing requirements for fire safety and the need to comply with modern standards. If left unresolved, serious consequences are possible, including personal injury and significant material losses. The implementation of the project will ensure a rapid response of fire equipment, increase the safety of students and staff, reduce the risks of building damage, and create conditions for effective management of fire situations.

Socio-economic context

Indicator

Value

Number of jobs, including for IDPs

28 human

Other functional

6 units

Number of people who will use the service

440 human

Population in the geographical area of influence of the project

2000 human

Strategic Case

Strategic feasibility of the project

Sector

Education and science

Subsector

School education

Stream

Ensuring access to quality education through the development and modernization of educational infrastructure facilities

Strategic document

Стратегія розвитку територіальної громади

Task

Increasing energy efficiency and energy independence of urban development

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

При оцінці попиту застосовувалася нормативно-розрахункова методологія, що базується на аналізі проєктної спроможності закладу, фактичної чисельності учнів і персоналу, функціонального призначення об’єкта та вимог чинних норм пожежної безпеки для закладів освіти.
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
440 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

The project will improve women's access to education (primary, secondary, vocational)
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Economic analysis.docx
12.02.2026
09:26:21 UTC

Alternative technical solutions

Technical Solution 1

Construction of internal and external fire-fighting water supply systems of Chornivska Gymnasium in the village of Chornivka, 15 Holovna St.

Technical Solution 2

Using local water sources with a mobile fire fence

Total costs16'672'455 UAH4'750'000 UAH
  • For preparation
  • 192'491 UAH350'000 UAH
  • For implementation
  • 12'579'964 UAH3'500'000 UAH
  • For operation
  • 3'900'000 UAH900'000 UAH
    Average annual costs130'000 UAH30'000 UAH
    Project duration, incl.19 months11 months
  • Deadline for developing a FFS
  • 5 months5 months
  • Implementation period
  • 14 months6 months
    Service life360 months360 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active

    [The technical approach was selected for further detailed analysis or implementation.]

    Rejected

    [The technical approach was not selected for further detailed analysis or implementation.]

    Components of a technical solution
    To components
    1
    To components
    0

    Commercial Justification

    Supplier and contractor market assessment

    Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Is the project of interest to small and medium-sized enterprises?
    Yes

    [Response was provided in the Preliminary Investment Feasibility Study]

    Will the project involve national or international suppliers and contractors?
    Yes, both national and international

    [Response was provided in the Preliminary Investment Feasibility Study]

    Has an analysis of available procurement options been conducted for the technical solution?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Financial justification

    Total project budget

    Total preliminary budget16'672'455 UAH4'750'000 UAH
    Capital costs16'672'455 UAH4'750'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation192'491 UAH350'000 UAH
    For implementation12'579'964 UAH3'500'000 UAH
    For operation3'900'000 UAH900'000 UAH
    For closing0 UAH0 UAH
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Preliminary Investment Feasibility Study]
    Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
    Yes
    [Response was provided in the Investment Feasibility Study]

    Average project cost per service recipient

    Service UnitСередня вартість проєкту на одного отримувача послуги
    Service Unit Cost29'028 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Availability of services

    Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
    Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds192'491 UAH0 UAH
    Expected Funds192'491 UAH0 UAH

    Public-private partnership

    Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
    The project does not fall under the PPP format by its nature/character

    [Response was provided in the Preliminary Investment Feasibility Study]

    Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
    No

    [Response was provided in the Preliminary Investment Feasibility Study]

    Management Rationale

    Team competencies

    Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
    Strategic justification - analysis of the strategic feasibility of the project

    [Response was provided in the Preliminary Investment Feasibility Study]

    Economic justification - economic analysis

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project management - communication with stakeholders

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project management - risk management

    [Response was provided in the Preliminary Investment Feasibility Study]

    Economic justification - social and gender analysis

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project management - public consultations

    [Response was provided in the Preliminary Investment Feasibility Study]

    Economic feasibility study - technical expertise

    [Response was provided in the Preliminary Investment Feasibility Study]

    Business case - analysis of available procurement options

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project management - legal support

    [Response was provided in the Preliminary Investment Feasibility Study]

    Strategic rationale - SDG compliance analysis

    [Response was provided in the Preliminary Investment Feasibility Study]

    Project management - working with international financial organizations (IFOs)

    [Response was provided in the Preliminary Investment Feasibility Study]

    Financial analysis - financial analysis

    [Response was provided in the Preliminary Investment Feasibility Study]

    Strategic rationale - demand analysis

    [Response was provided in the Preliminary Investment Feasibility Study]

    Economic justification - environmental expertise

    [Response was provided in the Preliminary Investment Feasibility Study]

    Business case - analysis of the market environment

    [Response was provided in the Preliminary Investment Feasibility Study]

    Does the team have experience implementing similar projects?
    Partially, we have limited experience

    [Response was provided in the Preliminary Investment Feasibility Study]

    Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
    None of the options are applicable
    Is there an understanding of where to find relevant experts and consultants?
    Yes, negotiations are already underway.

    [Response was provided in the Preliminary Investment Feasibility Study]

    Risk assessment

    Operational riskDefinedUndefined
    Other riskDefinedUndefined
    Results of the feasibility analysis
    Project Preparation Program Engagement and Funding Needs

    Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

    None of the options are applicable

    Project Approval History

    DateDecision NumberPortfolioProject StatusDecisionReasons
    19/02/2026SP-L-190226-7A276E0FCommunity SPInvestment Feasibility StudyInclude-
    25/02/2026SPP-L-250226-EA91CF3DCommunity SPPInvestment Feasibility StudyInclude-