Reconstruction of the 10 kV overhead line with relocation from the perimeter of the development of the family recreation complex (children's playground) with elements of landscaping of the adjacent territory at the address: Fontanka village, Khmelnytskyi Bohdana lane, 1/1
- Preparation
- General information
- Strategic Case
- Economic Case
- Financial Case
- Management Case
General information
Description of the project
An existing 10 kV overhead power line runs through the territory of the future family recreation complex (playground). Its location within the area where the improvement and stay of children is planned creates a potential danger and contradicts electrical safety requirements. To ensure the safe operation of the territory and compliance with the requirements of the Rules for the Arrangement of Electrical Installations (PUE), it was necessary to move the 10 kV overhead power line section outside the playground development zone.
The project aims to eliminate dangerous operating conditions and bring power grids up to safety standards. The work also creates conditions for further improvement of the territory and development of public facilities.
Ensuring safe conditions for residents and visitors of the family recreation complex by reconstructing the 10 kV overhead power line and moving it outside the development, in accordance with current standards and electrical safety requirements.