Landscaping: construction of a children's playground and arrangement of landscaping elements in the area near the building of the "Fontansky Village House of Culture" community center, which is located at: Odesa region, Odessa district, Fontanka village, Centralna st., building 46


Sector
Municipal infrastructure and services
Stream
Improving the quality of public space, developing cultural, sports and recreational infrastructure of the community
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

There is no modern children's playground in the village of Fontanka, in particular near the "Fontansky Village Cultural Center". Residents do not have a safe, equipped space for children's leisure, sports activities and organizing public events. The existing territory is neglected, unlit, without hard surface, which creates a danger for children.

The implementation of the project will provide the community with a high-quality, safe and functional space for children's leisure, the development of physical culture and the strengthening of social ties among residents.

Improving the leisure conditions of the population of the village of Fontanka through the creation of a modern children's and sports space with safe conditions for active recreation.

The purpose of the project

Main goal:

Creation of new facilities and services

Secondary goal:

Increasing compliance with modern standards, Improving the quality of services

Description of the purpose of the project and ways to achieve it

Improving leisure conditions for the population of the village of Fontanka through the creation of a modern children's sports space with safe conditions for active recreation.

Problems and solutions resulting from project implementation

There is no modern children's playground in the village of Fontanka, in particular near the Fontanka Village Cultural Center. Residents do not have a safe, equipped space for children's leisure, sports activities, and organizing public events. The existing area is neglected, unlit, and without hard surfaces, which creates a danger for children. The implementation of the project will provide the community with a high-quality, safe, and functional space for children's leisure, the development of physical culture, and the strengthening of social ties among residents.

Socio-economic context

Indicator

Value

Population in the geographical area of influence of the project

8844 human

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Urban planning and landscaping

Stream

Improving the quality of public space, developing cultural, sports and recreational infrastructure of the community

Strategic document

Task

3.2.3. Creation of sports and recreation infrastructure in the community for all segments of the population, with the aim of promoting a healthy lifestyle, providing additional jobs, attracting young people, older people and working with veterans. Build creative children's and sports open spaces

Project objectives

Indicator
Base value
Target value

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
50
6 thous. people
Economic justification

Alternative technical solutions

Technical Solution 1

It involves the construction of a children's playground with a safe surface, exercise equipment, fencing, benches, and landscaping elements on an area of 850 m².

Technical Solution 2

Minimal (partial development of the territory)

Total costs7'275'000 UAH7'235'000 UAH
  • For preparation
  • 500'000 UAH500'000 UAH
  • For implementation
  • 6'100'000 UAH6'100'000 UAH
  • For operation
  • 650'000 UAH610'000 UAH
  • For closing
  • 25'000 UAH25'000 UAH
    Average annual costs110'000 UAH6'600'000 UAH
    Project duration, incl.8 months8 months
  • Deadline for developing a FFS
  • 3 months3 months
  • Implementation period
  • 5 months5 months
    Service life300 months300 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active
    Rejected
    Components of a technical solution
    To components
    0
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget7'275'000 UAH7'235'000 UAH
    Capital costs7'275'000 UAH7'235'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation500'000 UAH500'000 UAH
    For implementation6'100'000 UAH6'100'000 UAH
    For operation650'000 UAH610'000 UAH
    For closing25'000 UAH25'000 UAH

    Average project cost per service recipient

    Service Unitкількість населення населеного пункту
    Service Unit Cost110'000 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds4'053'000 UAH0 UAH
    Expected Funds6'600'000 UAH0 UAH
    Management Rationale

    Risk assessment

    Technical riskDefinedUndefined
    Market riskDefinedUndefined
    Results of the feasibility analysis
    Economic Analysis
    Social benefits and costs
    Social benefits: improving the quality of life of residents, especially families with children; ensuring access to a safe space for sports; increasing social cohesion of the community; the possibility of using the site for mass events near the cultural institution; creating conditions for the prevention of addictions and deviant behavior; supporting inclusion (accessibility for people with disabilities). Social costs: temporary inconvenience during construction work; the need for periodic maintenance of the infrastructure.
    Environmental benefits and costs
    Environmental benefits: improvement of the territory, elimination of chaotic use of space; possible landscaping of the territory and creation of additional green areas; use of energy-efficient LED lighting; reduction of dust and soil erosion due to the coating. Environmental costs: use of materials that require disposal in the future (rubber coating); temporary impact of construction works on the environment.
    Indirect benefits and costs
    Indirect benefits and costs Indirect benefits: increasing the tourist and cultural attractiveness of the facility (next to the cultural center); strengthening the image of the community as modern and development-oriented; increasing economic activity in the surrounding area; creating a comfortable public space for master classes, sports events and cultural events. Indirect costs: increasing the load on nearby communications during mass events; the need for periodic infrastructure renewal in the long term.