Construction of a municipally owned local road on Kvitkova Street in the village of Oleksandrivka, Odessa district, Odessa region


Sector
Transport Sector
Stream
Development and rehabilitation of internal public road infrastructure
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

Kvitkova Street in the village of Oleksandrivka has a dirt or partially destroyed surface, which complicates the movement of vehicles and pedestrians, especially during the rainy season. The lack of a high-quality road surface leads to increased wear and tear of vehicles and reduces the attractiveness of the area for development.

The construction of a new municipally owned road will create safe and comfortable conditions for movement, improve transport accessibility and increase the level of improvement of the area.

Improving the transport and operational condition of the street and road network of the village of Oleksandrivka, ensuring safe and comfortable movement of vehicles and pedestrians, as well as increasing the socio-economic attractiveness of the settlement

The purpose of the project

Main goal:

Creation of new facilities and services

Secondary goal:

Increasing compliance with modern standards, Improving the condition of infrastructure

Description of the purpose of the project and ways to achieve it

Improving the transport and operational condition of the street and road network of the village of Oleksandrivka, ensuring safe and comfortable traffic and pedestrians, as well as increasing the socio-economic attractiveness of the settlement

Problems and solutions resulting from project implementation

Kvitkova Street in the village of Oleksandrivka has a dirt or partially destroyed surface, which complicates the movement of vehicles and pedestrians, especially during the rainy season. The lack of a high-quality road surface leads to increased wear and tear of vehicles and reduces the attractiveness of the area for development. The construction of a new municipal road will create safe and comfortable conditions for movement, improve transport accessibility and increase the level of landscaping of the area

Socio-economic context

Indicator

Value

Population in the geographical area of influence of the project

3190 human

Strategic Case

Strategic feasibility of the project

Sector

Transport Sector

Subsector

Road transport and road infrastructure

Stream

Development and rehabilitation of internal public road infrastructure

Strategic document

Task

3.1.1. Reconstruct community roads and modernize traffic interchanges

Project objectives

Indicator
Base value
Target value

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
1
50 car-days
Annual demand for services/infrastructure
2
75 car-days
Economic justification

Alternative technical solutions

Technical Solution 1

Construction of a new local road

Technical Solution 2

Major repairs with the installation of an asphalt concrete layer on the existing base

Total costs12'140'000 UAH6'750'000 UAH
  • For preparation
  • 100'000 UAH150'000 UAH
  • For implementation
  • 10'500'000 UAH4'500'000 UAH
  • For operation
  • 1'440'000 UAH2'000'000 UAH
  • For closing
  • 100'000 UAH100'000 UAH
    Average annual costs120'000 UAH250'000 UAH
    Project duration, incl.10 months9 months
  • Deadline for developing a FFS
  • 4 months3 months
  • Implementation period
  • 6 months6 months
    Service life144 months96 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active
    Rejected
    Components of a technical solution
    To components
    0
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget12'140'000 UAH6'750'000 UAH
    Capital costs12'140'000 UAH6'750'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation100'000 UAH150'000 UAH
    For implementation10'500'000 UAH4'500'000 UAH
    For operation1'440'000 UAH2'000'000 UAH
    For closing100'000 UAH100'000 UAH

    Average project cost per service recipient

    Service UnitОб'єкт будівництва дорожньої інфраструктури
    Service Unit Cost12'140'000 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds0 UAH0 UAH
    Expected Funds0 UAH0 UAH
    Results of the feasibility analysis
    Economic Analysis
    Social benefits and costs
    Social benefits: Increased road safety for rural residents and transit vehicles; Improved accessibility to social infrastructure (schools, medical facilities, administrative services); Reduced travel time and increased mobility of the population; Creation of temporary and permanent jobs during the construction and operation of the road. Social costs: Possible temporary inconvenience to the population during construction (traffic restrictions, noise, dust); Potential temporary disruption of access to private lands or economic plots.
    Environmental benefits and costs
    Environmental benefits: Use of modern materials and technologies that reduce negative environmental impacts; Planned drainage and other measures to prevent erosion and pollution of water resources; Possibility of integrating green areas and recultivation of disturbed areas. Environmental costs: Temporary disturbance of soil cover and green spaces during construction; Emissions from construction equipment and vehicles; Need to control pollution of water and soil resources during works.
    Indirect benefits and costs
    Indirect benefits: Increased economic activity and attractiveness of the area for business and investment; Reduced transportation costs for businesses and residents; Improved community living standards through improved transportation accessibility. Indirect costs: Possible transit traffic through the settlement that needs to be controlled; Need for future maintenance and road safety measures, which are funded additionally.