Modernization of power supply infrastructure through the installation of solar power stations on the buildings of educational institutions.
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The building of the "Fontansky" Lyceum consumes significant amounts of electricity, especially during the heating season. The existing power supply networks are outdated, do not meet modern energy efficiency standards and have an increased level of energy losses. The lack of its own alternative energy source increases the institution's dependence on centralized suppliers and tariff fluctuations.

The development of the PKD is a necessary prerequisite for the future reconstruction of power networks and the installation of a solar power plant, which will reduce electricity costs, increase energy independence and ensure the stable functioning of the educational process even in the event of interruptions in centralized power supply.

Preparation of design and estimate documentation for the reconstruction of the internal power supply system and placement of a solar power plant on the roof of the "Fontansky" Lyceum with further implementation of the project in future periods.

The purpose of the project

Main goal:

Increasing compliance with modern standards

Secondary goal:

Capacity building, Introducing innovations and energy-efficient solutions

Description of the purpose of the project and ways to achieve it

Preparation of design and estimate documentation for the reconstruction of the internal power supply system and placement of a solar power plant on the roof of the Fontansky Lyceum with further implementation of the project in future periods.

Problems and solutions resulting from project implementation

The building of the Fontansky Lyceum consumes significant amounts of electricity, especially during the heating season. The existing power supply networks are outdated, do not meet modern energy efficiency standards and have an increased level of energy losses. The lack of its own alternative energy source increases the institution's dependence on centralized suppliers and tariff fluctuations. The development of the PKD is a necessary prerequisite for the future reconstruction of power networks and the installation of a solar power plant, which will reduce electricity costs, increase energy independence and ensure the stable functioning of the educational process even in the event of interruptions in centralized power supply.

Socio-economic context

Indicator

Value

Population in the geographical area of influence of the project

8844 human

Strategic Case

Strategic feasibility of the project

Sector

Education and science

Subsector

School education

Stream

Modernization of power supply infrastructure through the installation of solar power stations on the buildings of educational institutions.

Strategic document

Task

3.4.2 Create safe and modern learning conditions in educational institutions

Project objectives

Indicator
Base value
Target value

Demand for the service and its dynamics

Indicator
Year
Demand
Annual demand for services/infrastructure
25
100 %
Economic justification

Alternative technical solutions

Technical Solution 1

Installation of a solar power plant with a comprehensive reconstruction of internal electrical networks on the roof of the Fontansky Lyceum of the Fontansky Village Council, at the address: Odesa region, Odessa district, Fontanka village, Tsentralna street, 55

Technical Solution 2

Current repairs of existing internal power grids without the introduction of renewable energy sources

Total costs3'850'000 UAH3'570'000 UAH
  • For preparation
  • 150'000 UAH83'000 UAH
  • For implementation
  • 2'900'000 UAH2'967'000 UAH
  • For operation
  • 750'000 UAH500'000 UAH
  • For closing
  • 50'000 UAH20'000 UAH
    Average annual costs3'050'000 UAH3'050'000 UAH
    Project duration, incl.10 months9 months
  • Deadline for developing a FFS
  • 3 months3 months
  • Implementation period
  • 7 months6 months
    Service life300 months180 months
    Target indicatorsDefined Defined
    Technical Solution Status
    Active
    Rejected
    Components of a technical solution
    To components
    0
    To components
    0

    Financial justification

    Total project budget

    Total preliminary budget3'850'000 UAH3'570'000 UAH
    Capital costs3'850'000 UAH3'570'000 UAH
    Operational costs0 UAH0 UAH

    Preliminary cost breakdown

    Operating costs for implementation0 UAH0 UAH
    For preparation150'000 UAH83'000 UAH
    For implementation2'900'000 UAH2'967'000 UAH
    For operation750'000 UAH500'000 UAH
    For closing50'000 UAH20'000 UAH

    Average project cost per service recipient

    Service Unitроботи
    Service Unit Cost3'850'000 UAH

    Profitability of the project

    Is the project expected to generate income?

    ResponseNoNo

    Project Financing Mechanisms

    Are funding sources and mechanisms identified?

    Source and MechanismYesNo

    Funding Sources

    Approved Funds82'500 UAH0 UAH
    Expected Funds3'050'000 UAH0 UAH
    Management Rationale

    Risk assessment

    Economic riskDefinedUndefined
    Results of the feasibility analysis
    Economic Analysis
    Social benefits and costs
    Benefits: Increased comfort and safety of students and staff of the lyceum thanks to modern electrical networks. Reduction of the institution's electricity costs, which allows to direct funds to the educational process. Possibility of using the SES for educational programs on energy efficiency and renewable energy sources. Costs / risks: Temporary inconvenience during installation work (noise, limited access to parts of the building).
    Environmental benefits and costs
    Benefits: Reduction of CO₂ emissions by partially replacing electricity from the grid with your own solar energy. The use of a renewable energy source helps reduce the ecological burden on the environment. Costs / risks: Minor violations of green areas are possible during installation, which are minimized by planning and compliance with safety regulations.
    Indirect benefits and costs
    Benefits: Increasing the prestige of the lyceum and the community as an example of implementing energy-efficient solutions. Possibility of developing local infrastructure to support renewable energy and attracting grant funds in the future. Educational effect for students and the community on renewable energy. Costs / risks: Minor administrative costs for project support and reporting to donors.