Reconstruction of water intake site No. 2 and water supply networks from water intake site No. 2 to Vyshnevetskykh Street No. 19/1, from water intake site No. 3 to Fabrychna Street and along Kamyanopotytska Street (from Sadovaya Street to Dachna Street) in the city of Lubny, Poltava Region
- Preparation
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
General information
Description of the project
The detailed design provides for: reconstruction of the water intake site (WIS) No. 2 with the replacement of steel water pipes Ду=300 mm from the existing wells to clean water tanks and Ду=250 mm from the metering unit chamber to the first valve of the pumping station (engine room) on the territory of WIS Me 2 with water pipes made of polyethylene pipes with a diameter of 315 mm and 250 mm, respectively, and the arrangement of WIS No. 2 with a metering unit; reconstruction of water supply networks from WIS No. 2 to Vyshnevetskikh Street N° 19/1 with the replacement of the steel water pipe Ду=400 from the metering unit chamber at WIS No. 2 to residential building No. 19/1 on Vyshnevetskikh Street with a polyethylene one with a diameter of 400 mm; reconstruction of water supply networks from water intake site No. 3 to Fabrychna Street with replacement of cast-iron water main Du=273 mm from the metering chamber to VZM No. 3 - Industrialna Street, to Oleksandrivska Street, further to the intersection with Fabrychna Street with a water main made of polyethylene pipes with a diameter of 250 mm, arrangement of VZM No. 3 with a metering unit; reconstruction of water supply networks along Kamianopotitska Street (from Sadovaya Street to Dachna Street) with replacement of cast-iron water main Du=273 mm with a water main made of polyethylene pipes with a diameter of 250 mm. The working project provides for appropriate solutions to comply with the requirements for sanitary and epidemiological well-being of the population, labor protection, ecology, fire safety, energy saving
The purpose of the project
Main goal:
Improving the equality of wealth distribution
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of people who will use the service
26750 human
Strategic Case
Strategic feasibility of the project
Sector
Municipal infrastructure and services
Subsector
Water supply and sanitation
Stream
Restoration, development and modernization of centralized water supply and wastewater infrastructure, including the introduction of alternative energy sources
Strategic document
State Strategy for Regional Development for 2021–2027
Task
Task 14 under the “Comfortable Communities” area of Operational Objective 1. Infrastructure resilient to security, social and economic challenges Availability of quality centralized water supply and wastewater services for different groups of citizens, taking into account the latest technologies and the needs of territorial communities
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?
Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?
Проектною документацією передбачено розробка розділу "Оцінка впливу на навколишнє середовище" (ОВНС)
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Were consultations held with representatives of target groups to take into account gender equality issues in the project?
Have the gender risks and social impacts of the project been assessed?
Are there management and institutional mechanisms in place to ensure gender equality?
Alternative technical solutions
Technical Solution 1
Reconstruction of water intake site No. 2 and water supply networks from water intake site No. 2 to Vyshnevetskykh Street No. 19/1, from water intake site No. 3 to Fabrychna Street and along Kamyanopotytska Street (from Sadovaya Street to Dachna Street) in the city of Lubny, Poltava Region
Technical Solution 2
Use of imported water (tankers, mobile containers)
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Preliminary cost breakdown
Average project cost per service recipient
Profitability of the project
Is the project expected to generate income?
Availability of services
[Response was provided in the Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Team competencies
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Необхідна для визначення технічних рішень
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Необхідна для проведення оцінки впливу на навколишнє середовище
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Необхідно для визначення загальної кошторисної вартості проєкту
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Наказом по підприємству призначено керівника проєкту та відповідальна особа
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]