Preparation of the project "Reconstruction of shipping locks with the installation of physical protection of critical infrastructure elements"


Sector
Municipal infrastructure and services
Stream
Restoration, modernization and protection of critical infrastructure facilities to ensure their resilience to threats and the continuity of vital services
Maturity level
69
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
State level of SPP
Implementation
Completion

General information

Description of the project

The main goal of the OKI protection system is to ensure the proper state of protection of critical infrastructure objects, which ensures the functionality, continuity of work, recoverability, integrity and stability of critical infrastructure.

The purpose of the project

Main Goal:

Increasing compliance with modern standards

Secondary Goal:

Introducing innovations and energy-efficient solutions

Description of the purpose of the project and ways to achieve it

The main goal of the OKI protection system is to ensure the proper state of protection of critical infrastructure facilities, which ensures the functionality, continuity of work, recoverability, integrity and stability of critical infrastructure. The installation of an anti-drone net will become a physical barrier used to protect critical infrastructure facilities from attacks by unmanned aerial vehicles (UAVs) by intercepting, blocking or reducing their accuracy.

Problems and solutions resulting from project implementation

increased risk of critical infrastructure being targeted by hostile UAVs. The development of an anti-drone net will be a physical barrier used to protect critical infrastructure from attacks by unmanned aerial vehicles (UAVs) by intercepting, blocking, or reducing their accuracy.

Socio-economic context

Indicator

Value

Other functional

5 units

Strategic Case

Strategic feasibility of the project

Sector

Municipal infrastructure and services

Subsector

Protective Structures for Infrastructure Facilities

Stream

Restoration, modernization and protection of critical infrastructure facilities to ensure their resilience to threats and the continuity of vital services

Strategic document

Ukraine Facility Plan

Task

Reform 7 Component I Investments to strengthen Ukraine's energy infrastructure

Project objectives

Indicator
Base value
Target value
physical protection of hydraulic shipping locks
0 units
5 units

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Збір офіційної статистичної інформації ДП «УКРВОДШЛЯХ», накази Мінрозвитку, РНБО, Міноборони
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
2618 units
Annual demand for services/infrastructure
2
3436 units
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Sustainable use and protection of water and marine resources
[Response was provided in the Preliminary Investment Feasibility Study]
Protecting and restoring biodiversity and ecosystems
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

None of the options are applicable

Does the project provide for improving women's access to services?

None of the options are applicable

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
111.pdf
07.10.2025
14:35:22 UTC
222.pdf
07.10.2025
14:35:28 UTC

Alternative technical solutions

Technical Solution 1

Preparation of the project "Reconstruction of shipping locks with the installation of physical protection of critical infrastructure elements"

Technical Solution 2

Production of the project "Protection of shipping locks by means of electronic warfare"

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)7'500'001 UAH105'000 UAH
For preparation1 UAH5'000 UAH
For implementation7'500'000 UAH100'000 UAH
Project operation and closure cost10'001 UAH10'001 UAH
For operation10'000 UAH10'000 UAH
For closing1 UAH1 UAH
Average annual costs1 UAH0 UAH
Project duration, incl.15 months24 months
Deadline for developing a FFS3 months12 months
Implementation period12 months12 months
Service life360 months60 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, only national

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget7'510'002 UAH115'001 UAH
Project cost (preparation and implementation)7'500'001 UAH105'000 UAH
For preparation1 UAH5'000 UAH
For implementation7'500'000 UAH100'000 UAH
Project operation and closure cost10'001 UAH10'001 UAH
For operation10'000 UAH10'000 UAH
For closing1 UAH1 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitПроєкт
Service Unit Cost7'500'000 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
Not applicable – the project does not provide for the provision of paid services or the establishment of tariffs

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
The project does not fall under the PPP format by its nature/character

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
No, this is the first project of its kind.

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
None of the options are applicable
Is there an understanding of where to find relevant experts and consultants?
Partially, we are considering options

[Response was provided in the Preliminary Investment Feasibility Study]

Risk assessment

Technical riskDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
07/10/2025SP-N-071025-AAA075C8State SPInvestment Feasibility StudyInclude--
28/10/2025SPP-N-281025-CE63047AState SPPInvestment Feasibility StudyInclude-69