Reconstruction of the football field of the sports and recreation complex of the Dnipro-80 Youth and Sports School of the Cherkasy City Council at the address: Prykordonnyka Lazarenka St., 5 in Cherkasy


Sector
Sports and physical activities
Stream
Development of a network of bases for holding all-Ukrainian and international sports competitions and ensuring the educational and training process
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SP
Implementation
Completion

General information

Description of the project

-football field measuring 95x64m

-field covering

- artificial grass with a pile height of 40mm.;

- around the field, provide a 5m high nylon mesh fence;

- arrangement of a base slope under the covering for drainage from the field.

The project provides for a football field made of artificial grass. After preparing the base, according to the base drawing - RP-4 of the working project, we proceed to laying synthetic grass. Installation of artificial grass begins with preparatory work. The surface for laying such a covering should not be flat - it should slightly rise towards the center and fall towards the edges. In this case, the maximum permissible difference in the heights of the base should be observed - it should not exceed forty millimeters. When arranging the base, it is very important to properly organize the drainage layer, which in the future will help to drain moisture from the base material. Various materials can be used as a base for artificial grass: soil, asphalt and asphalt concrete. However, the base most often consists of several layers, and if we are talking about a sports stadium, the top layer must be soft. This will avoid injuries during sports.

The purpose of the project

Main Goal:

Increasing compliance with modern standards

Secondary Goal:

Increasing compliance with modern standards, Improving the equality of wealth distribution, Improving the condition of infrastructure, Introducing innovations and energy-efficient solutions, Improving the quality of services, Meeting demand

Description of the purpose of the project and ways to achieve it

Creating a modern, safe and accessible sports infrastructure for the development of community physical culture

Problems and solutions resulting from project implementation

football field reconstruction

Socio-economic context

Indicator

Value

Number of IDP users

150 human

Number of people who will use the service

5000 human

Strategic Case

Strategic feasibility of the project

Sector

Sports and physical activities

Subsector

Sports and physical activities

Stream

Development of a network of bases for holding all-Ukrainian and international sports competitions and ensuring the educational and training process

Strategic document

Стратегія розвитку територіальної громади

Task

Priority 3: Comfortable, efficient and smart city · Development and modernization of urban infrastructure

Project objectives

Project objectives were not specified by the initiator

Project Sustainable Development Goals

Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Climate change adaptation
[Response was provided in the Preliminary Investment Feasibility Study]
Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]
Protecting and restoring biodiversity and ecosystems
[Response was provided in the Preliminary Investment Feasibility Study]
Climate change mitigation
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

None of the options are applicable

Does the project provide for improving women's access to services?

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]
The project will create jobs available to women (temporarily or permanently)
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Documents

Name
Date
Detailed calculation of estimated financial need.docx
17.04.2026
09:30:32 UTC

Alternative technical solutions

Technical Solution 1

Reconstruction of the football field of the sports and recreation complex

Technical Solution 2

major field repairs

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)12'525'719 UAH5'500'000 UAH
For preparation1'525'719 UAH500'000 UAH
For implementation11'000'000 UAH5'000'000 UAH
Project operation and closure cost800'000 UAH1'000'000 UAH
For operation400'000 UAH500'000 UAH
For closing400'000 UAH500'000 UAH
Average annual costs350'000 UAH0 UAH
Project duration, incl.38 months14 months
Deadline for developing a FFS2 months2 months
Implementation period36 months12 months
Service life360 months120 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
0
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, both national and international

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget13'325'719 UAH6'500'000 UAH
Project cost (preparation and implementation)12'525'719 UAH5'500'000 UAH
For preparation1'525'719 UAH500'000 UAH
For implementation11'000'000 UAH5'000'000 UAH
Project operation and closure cost800'000 UAH1'000'000 UAH
For operation400'000 UAH500'000 UAH
For closing400'000 UAH500'000 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
Yes
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitСередня вартість проєкту на одного отримувача послуги
Service Unit Cost12'412 UAH

Profitability of the project

Is the project expected to generate income?NoNo

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
No – analysis not performed

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds0 UAH0 UAH
Expected Funds0 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
17/04/2026SP-L-170426-CB9E29B9Community SPInvestment Feasibility StudyInclude--