Energy saving measures. Reconstruction of district heating networks from the boiler house "KMK" to residential houses and buildings located in blocks 285-287 in the Metallurgical District of Kryvyi Rih, Dnipropetrovsk region (Left "wing")
- General information
- Strategic Case
- Economic Case
- Commercial Case
- Financial Case
- Management Case
- Summary
General information
Description of the project
The working project is intended to increase the energy efficiency of the centralized heating system of consumers by reconstructing the heating networks from the boiler house "KMK" in the area from the left "wing" of pumping station No. 60 (TRP-60) to consumers, which are residential buildings and buildings in blocks 285-287, which are characterized by high rates of heat energy losses and unsatisfactory technical condition. Additional land acquisition is not required. When performing major repairs of old external heat networks, it is envisaged: replacement of existing pipelines of external heat networks using pipelines pre-insulated with polyurethane foam elements with a conductive steel pipe and an outer shell made of polyethylene resistant to atmospheric corrosion (according to DSTU B V.2.5-31:2007); replacement of existing pipelines of quarter heat networks using flexible pre-heat-insulated pipes, with a working temperature of the coolant up to 95 ° C and a maximum working pressure of 1.0 MPa; replacement of existing pipelines in heat chambers and basements using steel pipes, hot-deformed seamless (according to DSTU 8938:2019); replacement of existing and installation of new shut-off valves in heat chambers; thermal insulation of pipelines and valves in heat chambers; repair and reconstruction of heat chambers and construction drainage wells if necessary; dismantling and replacement of impassable channels (precast concrete trays); restoration of road surfaces and sidewalks in places where external heating network pipelines are laid; carrying out landscaping and improvement works in the area where the work is being carried out.
The purpose of the project
Main Goal:
Meeting demand
Secondary Goal:
Increasing compliance with modern standards, Improving the equality of wealth distribution, Introducing innovations and energy-efficient solutions, Поява нових виробничих потужностей, Improving the quality of services
Description of the purpose of the project and ways to achieve it
Problems and solutions resulting from project implementation
Socio-economic context
Indicator
Value
Number of people who will use the service
1450 human
Strategic Case
Strategic feasibility of the project
Sector
Municipal infrastructure and services
Subsector
District Heating
Stream
Restoration, modernization and development of centralized and decentralized heating systems
Strategic document
Стратегія розвитку територіальної громади
Task
2.5.2 Reducing energy losses/consumption
Project objectives
Project Sustainable Development Goals
Demand for the service and its dynamics
What methodology was used to estimate demand?
Has data from external sources been used in the demand assessment?
Does the demand forecast take into account the latest demographic and economic forecasts?
Analysis of the project's impact on ecology and climate change
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?
Is the proposed project expected to significantly harm any of the following climate or environmental objectives?
Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?
Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?
Project sustainability and inclusivity
Identify potential gender risks of the project and indicate possible ways to overcome them:
Does the project provide for improving women's access to services?
Are civil society organizations representing women and vulnerable groups included in the consultation process?
Were consultations held with representatives of target groups to take into account gender equality issues in the project?
Have the gender risks and social impacts of the project been assessed?
Are there management and institutional mechanisms in place to ensure gender equality?
Documents
Alternative technical solutions
Technical Solution 1
Energy saving measures. Reconstruction of district heating networks from the KMK boiler house to residential buildings and buildings located in blocks 285-287 in the Metallurgical District of Kryvyi Rih, Dnipropetrovsk region (Left "wing")
Technical Solution 2
Energy saving measures. Reconstruction of district heating networks from the KMK boiler house to residential buildings and buildings located in blocks 285-287 using steel pipelines in the Metallurgical District of Kryvyi Rih, Dnipropetrovsk region (Left "wing")
[The technical approach was selected for further detailed analysis or implementation.]
[The technical approach was not selected for further detailed analysis or implementation.]
Commercial Justification
Supplier and contractor market assessment
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
Financial justification
Total project budget
Average project cost per service recipient
Profitability of the project
Availability of services
[Response was provided in the Preliminary Investment Feasibility Study]
Project Financing Mechanisms
Are funding sources and mechanisms identified?
Funding Sources
Public-private partnership
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
Team competencies
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Preliminary Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]
[Response was provided in the Investment Feasibility Study]