Major repairs (thermal modernization) of the main building of the KNP KMR "MLSHMD" at the address: Kamianske, Serhiy Slisarenko St., 3


Sector
Healthcare
Stream
Ensuring access to quality medical care by modernizing medical infrastructure facilities
Preliminary Investment Feasibility Study
Project Status
Investment Feasibility Study
Entry into Portfolio
Local level of SPP
Implementation
Completion

General information

Description of the project

The municipal non-profit enterprise of the Kamianka City Council "City Emergency Hospital" is a cluster healthcare institution and is part of a capable network. It serves not only the residents of the city, but also the entire Kamianka district (426,201), the institution has a bed capacity of 900 beds, and employs 747 medical workers. The purpose of the institution is to provide 24-hour specialized medical care and rehabilitation to residents of the city and Kamianka district, IDPs, military personnel and persons injured as a result of military operations. This institution is designated as a support facility for providing inpatient care to patients with acute respiratory disease COVID-19. The institution operates the only inpatient departments in the city, namely: ophthalmology, infectious diseases, otolaryngology, urology, rheumatology, surgical purulent-septic, pediatric surgical.  The only outpatient hemodialysis department in the Kamiansky district works in three shifts, and about 7,000 hemodialysis procedures are performed in the institution annually. 

The purpose of the project

Main Goal:

Improving the condition of infrastructure

Secondary Goal:

Increasing compliance with modern standards, Increasing compliance with modern standards, Improving the quality of services, Meeting demand

Description of the purpose of the project and ways to achieve it

"Main types of work: Modernization of the internal heating system; Renovation of the mechanical ventilation system with the installation of a recuperative heat recovery unit with an intermediate coolant; Insulation of external walls; Insulation of the ceiling of an unheated attic; Insulation of the ceiling above an unheated basement; Insulation of the combined covering; Insulation of the ceiling above the driveways; Insulation of external walls below ground level; Replacement of window structures; Replacement of old doors with energy-saving ones; Modernization of the lighting system; Thermal insulation of heating system pipelines; Local roof restoration; Entrance group, porches, attics; Internal work (decoration, floors, etc.); Electrical solutions (power supply, sockets, etc.): Replacement elevators; Improvement.

Problems and solutions resulting from project implementation

The project provides for comprehensive measures for major repairs (thermal modernization) of the main building, equipping it with modern equipment and arranging landscaping of the territory. KNP KMR "MLSHMD" is a multidisciplinary healthcare institution providing emergency and secondary (specialized) medical care, serving the population of the city of Kamianske and the surrounding areas, which are part of the Kamianske hospital district (Petrykivskyi, Tsarychanskyi, Verkhnyodniprovskyi, Pyatikhatskyi, Krynychanskyi districts and the city of Vilnohirsk).

Socio-economic context

Indicator

Value

Other functional

900 beds

Number of IDP users

27996 human

Population in the geographical area of influence of the project

428605 human

Strategic Case

Strategic feasibility of the project

Sector

Healthcare

Subsector

Specialized medical care

Stream

Ensuring access to quality medical care by modernizing medical infrastructure facilities

Strategic document

Стратегія розвитку територіальної громади

Task

3.2.2. An effective healthcare system

Project objectives

Indicator
Base value
Target value
Number of medical personnel
739 human
739 human
Number of beds
900 beds
900 beds

Project Sustainable Development Goals

Demand for the service and its dynamics

What methodology was used to estimate demand?

Аналіз та дослідження з метою прогнозування попиту на основі минулих показників з урахуванням динаміки в майбутньому.
[Response was provided in the Preliminary Investment Feasibility Study]

Has data from external sources been used in the demand assessment?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Does the demand forecast take into account the latest demographic and economic forecasts?

No
[Response was provided in the Preliminary Investment Feasibility Study]
Indicator
Year
Demand
Annual demand for services/infrastructure
1
67144 human
Economic justification

Analysis of the project's impact on ecology and climate change

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Pollution prevention and control
[Response was provided in the Preliminary Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Does the planned activity have a potential positive contribution to achieving climate or environmental objectives?

Protecting and restoring biodiversity and ecosystems
[Response was provided in the Investment Feasibility Study]

Is the proposed project expected to significantly harm any of the following climate or environmental objectives?

None of the options are applicable

Have the greenhouse gas emissions or emission reductions (Scope 1-2) associated with the project been calculated for a typical year and the entire project period?

No
[Response was provided in the Investment Feasibility Study]

Does the project require an environmental impact assessment (EIA) in accordance with the Law of Ukraine "On Environmental Impact Assessment"?

Conducting an EIA is not required.
[Response was provided in the Investment Feasibility Study]

Project sustainability and inclusivity

Identify potential gender risks of the project and indicate possible ways to overcome them:

Not applicable to my project
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project provide for improving women's access to services?

The project will improve women's access to safe water, food, and medical services
[Response was provided in the Preliminary Investment Feasibility Study]

Are civil society organizations representing women and vulnerable groups included in the consultation process?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Were consultations held with representatives of target groups to take into account gender equality issues in the project?

No consultations were held with target groups.
[Response was provided in the Investment Feasibility Study]

Have the gender risks and social impacts of the project been assessed?

None of the options are applicable

Are there management and institutional mechanisms in place to ensure gender equality?

None of the options are applicable

Documents

Name
Date
Слісаренко 3 explanatory note 07.04.26_compressed.pdf
07.04.2026
13:33:57 UTC

Alternative technical solutions

Technical Solution 1

Major repairs (thermal modernization) of the main building of the KNP KMR "MLSHMD" at the address: Kamianske, Serhiy Slisarenko St., 3

Technical Solution 2

Current repair

Cost breakdownCost justificationCost justification
Project cost (preparation and implementation)196'973'960 UAH50'150'000 UAH
For preparation118'310 UAH150'000 UAH
For implementation196'855'650 UAH50'000'000 UAH
Project operation and closure cost157'307 UAH650'000 UAH
For operation1 UAH500'000 UAH
For closing157'306 UAH150'000 UAH
Average annual costs1 UAH0 UAH
Project duration, incl.26 months9 months
Deadline for developing a FFS8 months3 months
Implementation period18 months6 months
Service life1200 months60 months
Target indicatorsDefined Defined
Technical Solution Status
Active

[The technical approach was selected for further detailed analysis or implementation.]

Rejected

[The technical approach was not selected for further detailed analysis or implementation.]

Components of a technical solution
To components
1
To components
0

Commercial Justification

Supplier and contractor market assessment

Is the project likely to attract a sufficient number of bidders to ensure real competition that will encourage bidders to think innovatively and maximize the quality of their proposals?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project of interest to small and medium-sized enterprises?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

Will the project involve national or international suppliers and contractors?
Yes, both national and international

[Response was provided in the Preliminary Investment Feasibility Study]

Has an analysis of available procurement options been conducted for the technical solution?
Yes

[Response was provided in the Preliminary Investment Feasibility Study]

What procurement strategy was chosen for the project implementation, and what justifies its feasibility in the context of the market and project objectives?
Стратегія закупівель для масштабних проєктів базується на принципах «гнучкості, локалізації та прозорості»

[Response was provided in the Investment Feasibility Study]

What approaches are planned to be used to ensure transparency, competition, and efficiency in the procurement process?
Для забезпечення прозорості, конкуренції та ефективності у 2026 році впроваджується комплексний підхід, що базується на цифровізації, нових законодавчих стандартах та аналітиці даних.

[Response was provided in the Investment Feasibility Study]

What types of procurement procedures are envisaged by the project (open tender, negotiated procedure, competitive dialogue, etc.)?
Open competitive bidding

[Response was provided in the Investment Feasibility Study]

Pre-market engagement
відкриті торги на Prozorro

[Response was provided in the Investment Feasibility Study]

Potential market participants
Згідно зі ст. 4 Закону «Про публічні закупівлі»

[Response was provided in the Investment Feasibility Study]

Market readiness assessment
Оцінка готовності ринку демонструє високу адаптивність бізнесу до кризових умов, проте висвітлює низку структурних викликів, які можуть вплинути на швидкість реалізації масштабних проєктів.

[Response was provided in the Investment Feasibility Study]

Financial justification

Total project budget

Total preliminary budget197'131'267 UAH50'800'000 UAH
Project cost (preparation and implementation)196'973'960 UAH50'150'000 UAH
For preparation118'310 UAH150'000 UAH
For implementation196'855'650 UAH50'000'000 UAH
Project operation and closure cost157'307 UAH650'000 UAH
For operation1 UAH500'000 UAH
For closing157'306 UAH150'000 UAH
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
No
[Response was provided in the Preliminary Investment Feasibility Study]
Were the methodological recommendations approved by the Ministry of Finance of Ukraine applied when calculating the indicative budget?
No
[Response was provided in the Investment Feasibility Study]

Average project cost per service recipient

Service UnitВартість будівництва на 1 людину
Service Unit Cost2'838 UAH

Profitability of the project

Is the project expected to generate income?NoNo
Is the project self-sustaining?No

Availability of services

Has an analysis been conducted of the accessibility of services for consumers and their financial ability to pay the established tariffs?
No – analysis not performed

[Response was provided in the Preliminary Investment Feasibility Study]

Project Financing Mechanisms

Are funding sources and mechanisms identified?

Source and MechanismYesNo

Funding Sources

Approved Funds187'041'054 UAH0 UAH
Expected Funds187'041'054 UAH0 UAH

Public-private partnership

Has a qualitative and quantitative assessment of the project's suitability for implementation through a PPP mechanism been conducted?
No, no assessment was conducted.

[Response was provided in the Preliminary Investment Feasibility Study]

Are there, after conducting an appropriate study, private investors interested in the possibility of implementing the project in the PPP format?
No

[Response was provided in the Preliminary Investment Feasibility Study]

Management Rationale

Team competencies

Determine which competencies/expertise required for successful project preparation and implementation can be provided by the project initiator's own project team (without involving external advisors)
Strategic justification - analysis of the strategic feasibility of the project

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - economic analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - communication with stakeholders

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - risk management

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - social and gender analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - public consultations

[Response was provided in the Preliminary Investment Feasibility Study]

Economic feasibility study - technical expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of available procurement options

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - legal support

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - SDG compliance analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Project management - working with international financial organizations (IFOs)

[Response was provided in the Preliminary Investment Feasibility Study]

Financial analysis - financial analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Strategic rationale - demand analysis

[Response was provided in the Preliminary Investment Feasibility Study]

Economic justification - environmental expertise

[Response was provided in the Preliminary Investment Feasibility Study]

Business case - analysis of the market environment

[Response was provided in the Preliminary Investment Feasibility Study]

Does the team have experience implementing similar projects?
Yes, successfully implemented 1 or more similar projects

[Response was provided in the Preliminary Investment Feasibility Study]

Identify which competencies/expertise required for successful project preparation and implementation need to be strengthened by engaging independent experts or consultants
None of the options are applicable
Is there an understanding of where to find relevant experts and consultants?
Yes, negotiations are already underway.

[Response was provided in the Preliminary Investment Feasibility Study]

Is the project management structure defined: working group, chair, project team?
Yes

[Response was provided in the Investment Feasibility Study]

What categories of experts and consultants have already been involved at the project preparation stage?
Environmental experts

[Response was provided in the Investment Feasibility Study]

Legal consultants

[Response was provided in the Investment Feasibility Study]

Economic analysts

[Response was provided in the Investment Feasibility Study]

Strategic consultants

[Response was provided in the Investment Feasibility Study]

Technical experts

[Response was provided in the Investment Feasibility Study]

Social/gender consultants

[Response was provided in the Investment Feasibility Study]

Management experts / project managers

[Response was provided in the Investment Feasibility Study]

Are there plans to involve experts and consultants for further implementation of the project?
Yes

[Response was provided in the Investment Feasibility Study]

Risk assessment

Social riskDefinedUndefined

Organizational events

ResponseDefinedUndefined
Results of the feasibility analysis
Project Preparation Program Engagement and Funding Needs

Is there ongoing cooperation or support within the framework of international technical assistance (ITA) or from other donor or government agencies?

Yes
[Response was provided in the Preliminary Investment Feasibility Study]

Does the project require preparation assistance from Project Preparation Programs (PPF)?

None of the options are applicable

Does the project require additional preparation assistance from Project Preparation Facilities (PPF)?

None of the options are applicable
Need for financing

Does the project require additional funding for preparation?

No
[Response was provided in the Preliminary Investment Feasibility Study]

Project Approval History

DateDecision NumberPortfolioProject StatusDecisionReasonsMaturity level
08/04/2026SP-L-080426-82953809Community SPInvestment Feasibility StudyInclude--
13/04/2026SPP-L-130426-67419538Community SPPInvestment Feasibility StudyInclude--